Curriculum-Vitae
Name: BISWODIPBAKALI. Date:**.06.2021
Email =*********@*****.***
********@**********.***
********.******@*************.***
Phone no-090***-*****
Phone no-070***-*****
CARRIER OBJECTIVE
To work for a leading Mechanical industries which enables to cope-up with the emerging as well as the latest technology and scope for widening spectrum of knowledge.
Presently Working:-
Maintenance Manager at Nefa Breweries Pvt. Ltd. Lekhi village, Nirjuli, Arunachal Pradesh, Pin : 791109.
Company Profile:-Beer manufacturing for Carlsberg India, Yuksum Breweries Pvt. Ltd, Nefa breweries and sona Breweries Ltd.
Previous experience:
1.Diamond beverages pvt. Ltd.(fbo of Coca-cola India)At P-41,Taratala Road, Kolkata-88.Manufacturing of carbonated soft drinks(RGB &PET), maaza(RGB & Tetra), and kinleywater.
2.RhinoAgenciesLtd.(Brewery under:-Yuksum brewery[Sikkim]) At Amingaon, Guwahati (ASSAM),as Utility Engineer March, 2012 to Jan-2017. Manufacturing of Beer (He-man 9000 &Dansberg 15000).
3.Bhutan Breweries Pvt. Ltd. as assistant Mechanical
Engineer 2011-Feb’2012.
Hindusthancoca-cola beverages Pvt. ltd. As Senior technician maintenance from June 2003 to March 2011 at raninagar,jalpaiguri,W.B.
George Telegraph Training Institute As faculty of Automobile& Refrigeration System, Siliguri Centre.
Company Profiles: - Manufacturer of Beer, Cold Drinks,Maaza.
Job Profiles:-
1. Responsible for machine operation & maintenance.
2. To maintain good SOP within the plant.
3. To maintain Preventive Maintenances.
4. To carefull handle at job closing time.
5. To flow job close time before estimated time.
6. Responsible for review and acceptance of in process and final Stages.
7. Implementing the Quality policies and procedures as per the quality Manual.
8.Responsible for contracting activities from Quality Assurance Dept.
9.Responsible for special projects at plant.
10. Conducting Training programs for Maintenance Personnel.
11.Review and verification of breakdown reports and corrective actions on maintenance.
12. Co-ordinating with Quality department & Execution of maintenance complaints if any.
13. To maintain spares parts stock &inward inspection report such as, Machine spares inspection send by different make companies, (Spare parts at different machine within plant etc).
14. Active member of TPM, WRM Team of our plant.
15. Machine spare and other Equipments spares required for plant all indent as per requirement quality checking.
16. Annual Maintenance jobs at utility, Bottling machineries and brew-house.
Knowledge &Maintenance about following m/c.
1Boiler machine of Forbes Marshall,Thermax& Prime thermalworked in 8.5 tonne, 4 tonne, and 4.5 tonne boiler,Coal&Husk fire boiler,FO, LVFO and Diesel fire boiler full operation andmaintenance.
2Refrigeration machine of SABRO &ACR,FRICK INDIA,150TR& 240TR plant handled,worked with KC3, KC4, KC6 compressor, Frick india compressor overhauling.
3Co2 Plant operation and maintenance jobs inLiquid plant and gas collection plant with 99.9 %purity.
4Bottle washer of KHS 200 BPM, Leal200 bpm,Akomag 200bpm,
5Labelling Machine of KHS,Krones&Kosme, Zongde.
6Filler machine of KHS 200 bpm, Krones 200bpm, KHS 400bpm( Crowner modification job at Nefa).
7Process area all engineering works in malt section and brew section.WTP AND ETP Maintenanceworks.
8Diesel Generator of CUMMINS &KOEL
200KVA,500KVA & 750KVA,
10.40 bar & 10 bar Air compressor of AF Compressor, Chicago pneumatic,Ingersollrand & Fushion comp .
11.7 Bar air compressor (TC100 of KIRLOSKAR& Chicago Pneumatic ).
12.PET Blow moulding machine SBO6, SBO Universal.
13.Annual maintenance work for Utility, Brewhouse, and Bottling hall area.
14.Different types of pumps
(Centrifugal,submersible,reciprocating,dosing pumps), Gear box of SEW and Greaves, Hydraulic & Pneumatic tools & many more…
Project Handled:-
Successfully handled in Power saving within plants.
Erection of 2 tonne capacity boiler in HCCBPL, Raninagar,Jalpaiguri.
Erection of new PET 300BPM line at coca-colaraninagarplant.
Erection of 200 Tonne Silo at Rhino Breweries Ltd. Amingaon, Guwahati.
Unitank and BBT installation at Rhino breweriesltd.Amingaon,Guwahati.
CO2 Plant maintenance & new co2 supply Co2 station set-up at rhino breweries, Amingaon, Guwahati.
DAW system installation in Nefa Breweries Pvt. Ltd in jan’2019.
Lots of plant modification in Nefa Breweries Pvt. Ltd. ex: Rain water harvesting etc.
AcademicQualification
1Passed 10th in 1997 with 65% (Physics, Chemistry, Mathematics) from West Bengal Board, Kolkata.
2Passed 12th in 1999 with 56% (Physics, Chemistry, Mathematics) from West Bengal Board, Kolkata.
Professional Qualification
B.Tech in Mechanical Engineering (3 year) in 2008 with 72.0 % from VBIMT.
Diploma in Mechanical Engineering (3 year) in 2003 with 75.6% from West Bengal State Council of Technical Education.
Computer Proficiency
Windows, Microsoft Office, Microsoft, C, and internet.
Personal Profile:
Father’s name : Prahalad Bakali.
CommunicationAddress : C/o: PrahaladBakali.
Vill: Oodlabari (suvashpally). P.O: Manabari.
Dist: Jalpaiguri(W.B.) Pin: 735222
Date of birth : 24th DEC.1980.
Sex : Male.
Marital Status : Married.
Language known : English, Hindi & Bengali.
Place : Nirjuli,Arunachal Prades BiswodipBakali.