G. VENKATESH B.E (DEEE)
CHENNAI-52
C: 978-***-**** M: adnnxl@r.postjobfree.com
PROFESSIONAL SUMMARY:
** ***** *********** ********** *** MAINTENANCE ENGINEER SKILLED AT KEEPING TODAY’S SOPHISTICATED SYSTEMS AND PROCESS RUNNING EFFICIENTLY AND MAINTAINING BUSINESS OPERATIONS. CORE QUALIFICATION:
PROFESSIONAL IN WORKING WITH MICROSOFT OFFICE APPLICATIONS.
EXPERT IN ANALYZING HT TROUBLESHOOTING.
STRONG BACKGROUND IN SYSTEM INSTALLATION
WELL-VERSED IN TECHNICAL/ENGINEERING OPERATIONS AND FACILITIES MANAGEMENT
INSPECTING BUILDINGS’ STRUCTURES TO DETERMINE THE NEED FOR REPAIRS OR RENOVATIONS CURRENT EXPERIENCE: SUPPLY CHAIN MANAGEMENT 2014 TO PRESENT DESIGNATION: ELECTRICAL AND MAINTENANCE ENGINEER CUM ADMIN COMPANY: LINFOX LOGISTICS
CLIENT: HINDUSTAN UNILEVER LIMITED
ROLES & RESPONSIBILITY:
TYPE OF EQUIPMENT NO.OF EQUIPMENTS HANDLED
1) 11 KV/440V -500 KVA TRANSFORMER 1
2) 11KV/440V – 250 KVA TRANSFORMER 2
3) 11KV / 440V – 100 KVA TRANSFORMER 1
4) 160 KVA GENSET 2
5) 125 KVA GENSET 2
6) 100 KVA GENSET 1
7) 62.5 KVA GENSET 1
8) 100 HP ENGINE WITH FIRE HYDRANT SYSTEM 1
PLANT POWER DETAILS CAPACITY
MAXIMUM DEMAND 900 KVA
SOLAR PLANT WITH BATTERY BACKUP -1 97.5 KW
SOLAR PLANT - GRID TIE - 2 57 KW
C License
Holder
C43099
INVOLVE IN JOB SAFETY TRAINING AND COMPLY WITH ALL ESTABLISHED RULES AND METHODS TO ENSURE SAFE AND HEALTHY WORK ATMOSPHERE.
SCHEDULE AND UNDERTAKE PERIODIC MAINTENANCE ON ALL ELECTRICAL EQUIPMENT, COMPONENTS, AND INSTALLATIONS
PROVIDE PROMPT RESPONSE TO INQUIRIES WHENEVER THERE IS A BREAKDOWN, AND RESOLVE THE ISSUE AS QUICKLY AS POSSIBLE
ENSURE THAT EQUIPMENT’S ARE IN GOOD WORKING ORDER SO AS TO PREVENT DISRUPTION OF ACTIVITIES
RECOMMEND REPLACEMENT FOR OLD OR FAULTY ELECTRICAL COMPONENTS OR FITTINGS TO THE MANAGEMENT
ASSIST IN FORECASTING REQUIREMENTS, CREATING A BUDGET AND SCHEDULING EXPENSES FOR THE ELECTRICAL DEPARTMENT
ENSURING COMPLIANCE REQUIRED BY GOVT. (TAX, LICENSE, RENEWAL, YEARLY AUDIT & SLD UPDATION.ETC)
KEEP RECORD OF ALL STOCK AND SUPPLIES, INCLUDING COMPANY’S ELECTRICAL EQUIPMENT
PERFORM ENERGY AUDIT AND RECOMMEND ALTERNATIVE SOURCES OF ENERGY
HELP THE ORGANIZATION TO REDUCE ENERGY COSTS
ENSURE THAT ALL ELECTRICAL GADGETS AND INSTRUMENTS ARE SWITCHED OFF AFTER CLOSE OF WORK DAILY.
KEEP STOCK OF OFFICE SUPPLIES AND PLACE ORDERS WHEN NECESSARY
SUPERVISE ADMINISTRATIVE STAFF AND DIVIDE RESPONSIBILITIES TO ENSURE PERFORMANCE
MAKE TRAVEL & FOOD ARRANGEMENTS
FAMILIARITY WITH OFFICE EQUIPMENT, INCLUDING PRINTERS AND FAX MACHINES
ENSURE OPERATION OF EQUIPMENT BY COMPLETING PREVENTIVE MAINTENANCE REQUIREMENTS; CALLING FOR REPAIRS; MAINTAINING EQUIPMENT INVENTORIES; EVALUATING NEW EQUIPMENT AND TECHNIQUES
CONTRIBUTE TO TEAM EFFORT BY ACCOMPLISHING RELATED RESULTS AS NEEDED
SUPERVISE ELECTRICAL WORKS WHEN NEW PROJECTS ARE UNDERTAKEN PREVIOUS EXPERIENCE: 2012 TO 2014
DESIGNATION: EXECUTIVE - SITE IN CHARGE
COMPANY: SHRI VAARI ELECTRICALS PVT LTD
CLIENT: HINDUSTAN UNILEVER LIMITED – DETS FACTORY
ROLES & RESPONSIBILITY:
PROVIDE SAFE WORKING ENVIRONMENT FOR MEMBERS OF STAFF, AND ENSURE ELECTRICITY INDUCED ACCIDENTS AND MISHAPS ARE PREVENTED
TAKE STEPS TO PREVENT FIRE OUTBREAKS BY MAKING APPROPRIATE RECOMMENDATIONS TO MANAGEMENT
PURCHASE ELECTRICAL FITTINGS AND COMPONENTS OR SUPERVISE THE STAFF CHARGED WITH THE RESPONSIBILITY
PROVIDE 24 HOURS A DAY MAINTENANCE SERVICES OR ASSIGN TECHNICAL STAFF TO DO SO
SUPERVISE ELECTRICAL WORKS WHEN NEW PROJECTS ARE UNDERTAKEN
SUPPORT THE COMPANY IN INCREASING PROFITABILITY BY MANAGING RESOURCES EFFICIENTLY AND MAKING NECESSARY RECOMMENDATIONS.
ADDITIONAL EXPERIENCE IN SOLAR POWER PLANT
50 KWP SOLAR POWER PLANT INSTALLED @ MUNICIPAL CORPORATION OFFICE, NALLUR, TIRUPPUR.
(PROJECT YEAR – 2013)
50 KWP SOLAR POWER PLANT INSTALLED @ MUNICIPAL CORPORATION OFFICE, VELAMPALAYAM, TIRUPPUR.
(PROJECT YEAR – 2014)
97.5 KWP SOLAR POWER PLANT SUPERVISED @ HINDUSTAN UNILEVER LIMITED WAREHOUSE, PERIYAPALAYAM.
(PROJECT YEAR – 2016)
50 KWP SOLAR POWER PLANT SUPERVISED @ HINDUSTAN UNILEVER LIMITED WAREHOUSE, PERIYAPALAYAM.
(PROJECT YEAR -2017)
PREVIOUS EXPERIENCE: 2011 TO 2012
DESIGNATION: EXECUTIVE - SHIFT ENGINEER
COMPANY: ABB
ROLES & RESPONSIBILITY:
(33KV/433V, 2500 KVA X 3 T/F'S AND 5 SET DG'S WITH SYCH, PANEL, SF6 BREAKERS AND ABB MAKE ACB'S) HT/LT PANEL MAINTENANCE AT ETL INFRA
PREVIOUS EXPERIENCE: 2008 TO 2010
DESIGNATION: ELECTRICIAN
COMPANY: AG AERO VISION ELECTRONICS PVT LTD
ROLES & RESPONSIBILITY:
ERECTION OF EARTH PITS FIXING OF CABLE TRAYS AND CABLE LAYING WORKS MOTOR FIXING WORKS, STARTER PANEL WIRING WORKS AT SRIPERAMBUR, SIPCOT-2
EDUCATION:
DIPLOMA IN ENGINEERING – ELECTRICAL AND ELECTRONICS MAR 2008
BACHELOR OF ENGINEERING – ELECTRICAL AND ELECTRONICS ENGINEERING APR 2019 DECLARATION:
I HEREBY DECLARE THAT THE DETAILS MENTIONED IN THIS RESUME ARE TRUE TO MY KNOWLEDGE. PLACE: SIGNATURE
DATE: