To.
HR. RECRUITMENT DEPARTMENT
Dear HR. Recruitment Manager
The opportunity to join your company makes me interested. ENGINEERING, MAINTENANCE and UTILITY is the field I would like to apply. Please kindly let me introduce my main personnel data:
Name : Budiman Satya, ST
Sex : Male
Age : 46 years old
Nationality : Indonesia
Status : Married
Address : Grand Depok City Cluster Alpinia Blok B No.11 RT.08 RW.06, Kel.Tirtajaya kec.Sukmajaya, Depok
West Java, Indonesia, 16412
Education : Mechanical Engineering- Sriwijaya University Profession : PT.ERRITA PHARMA Indonesia (Pharmaceutical) Phone : +62-877*********
Email : **********@*****.***
In addition, I am able to use an English (in writing and active speaking) and able to operate applied computer programs (Words, Excel, MP 2). Currently I am still working at PT. ERRITA PHARMA as ENGINEERING MANAGER. I hope I am the one whom you are seeking. It is big chance to develop my talents by joining your company. I look forward appreciatelly to hear from you soon. Thank you for your attention.
Sincerely,
BUDIMAN SATYA, ST
BUDIMAN SATYA, ST
Sex : Male
Age : 46 years old
Nationality : Indonesia
Status : Married
ID card No. : 3276053009740012
Address : Grand Depok City Cluster Alpinia Blok B No.11 RT.08 RW.06, Kel.Tirtajaya kec.Sukmajaya, Depok
West Java, Indonesia, 16412
Education : Mechanical Engineering- Sriwijaya University Phone : +62-877*********
Email : **********@*****.***
Experience :
JUN 2020 – NOW
PT. ERRITA PHARMA (PHARMACEUTICAL)
Manage & Control All Documents Related Maintenance, Engineering Activities
Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building
Repair and Troubleshooting for all Equipment, Facilities and Building
Planning, propose and control Annual budget for Engineering and maintenance Activities.
Develop the plant’s facilities preventive maintenance, replacement and upgrade plan
Manage projects related to facilities upgrades and changes
Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.
Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.
Develop technicians to increase engineering skills
Supporting Manufacturing operations in achieving the overall plant operational performance in term of product quality, productivity, reliability, profitability, cost competitiveness and overall business financial achievement
APRIL 2019 – JANUARY 2020
PT. SEPATU MAS IDAMAN (Member of Gunung Sewu Group)
Manage & Control All Documents Related Maintenance, Engineering Activities
Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building
Repair and Troubleshooting for all Equipment, Facilities and Building
Planning, propose and control Annual budget for Engineering and maintenance Activities.
Develop the plant’s facilities preventive maintenance, replacement and upgrade plan
Manage projects related to facilities upgrades and changes
Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.
Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.
Develop technicians to increase engineering skills
Supporting Manufacturing operations in achieving the overall plant operational performance in term of product quality, productivity, reliability, profitability, cost competitiveness and overall business financial achievement
AGT 2017 – FEB 2019
PT. MENARINI INDRIA LABORATORIES (PHARMACEUTICAL)
Manage & Control All Documents Related Maintenance, Engineering Activities
Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building
Repair and Troubleshooting for all Equipment, Facilities and Building
Planning, propose and control Annual budget for Engineering and maintenance Activities.
Develop the plant’s facilities preventive maintenance, replacement and upgrade plan
Manage projects related to facilities upgrades and changes
Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.
Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.
Develop technicians to increase engineering skills
Leading all medium and long term improvement engineering activities
Supporting Manufacturing operations in achieving the overall plant operational performance in term of product quality, productivity, reliability, profitability, cost competitiveness and overall business financial achievement
Responsible as HSE coordinator related to Manufacturing Operation activities
MAR 2012 – JUL 2017
PT. SUNTHI SEPURI (PHARMACEUTICAl)
Manage & Control All Documents Related Maintenance, Engineering Activities
Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building
Planning, propose and control Annual budget for Engineering and maintenance Activities.
Repair and Troubleshooting for all Equipment, Facilities and Building
Develop the plant’s facilities preventive maintenance, replacement and upgrade plan
Manage projects related to facilities upgrades and changes
Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.
Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.
Develop technicians to increase engineering skills
Leading all medium and long term improvement engineering activities
Supporting Manufacturing operations in achieving the overall plant operational performance in term of product quality, productivity, reliability, profitability, cost competitiveness and overall business financial achievement
Responsible as HSE coordinator related to Manufacturing Operation activities
JUN 2009 – FEB 2012
PT. CAPSUGEL INDONESIA (PHARMACEUTICA)
Manage & Control All Documents Related Maintenance, Engineering Activities
Operation, Control & Maintenance for Utilities & Facilities
( Compressor, Generator, Chiller, Boiler, Blower, Dust Collector, Forklift, Cooling Tower,HVAC )
Develop the plant’s facilities preventive maintenance, replacement and upgrade plan
Establish SOP for regular inspection, preventive maintenance, repair procedures, and ensure the direct reports follow the SOP
Review the status of current planned and in progress maintenance work and approve daily work plan for direct reports
Regularly review facilities performance reports, conduct visual inspection of facilities and arrange the investigation of abnormalities
Manage projects related to facilities upgrades and changes
Monitor the real time utilities demand of the plant and adjust the capacity of supply facilities
Develop annual facilities operating plan, including any additions or changes to the Plant's facilities, based on the Plant's operation plan
Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.
Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.
APR 2008 – JUN 2009
PT. LATEXIA INDONESIA, MERAK ( CIBA CHEMICAL GROUP )
- MAINTENANCE SUPERVISOR
Manage & Control All Documents Related Maintenance, Engineering Activities
Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building
Planning, Propose, Execute & Control Engineering Project Job Related to Maintenance, Engineering or Facilities and Building
Provide Permit to Work for Maintenance /Engineering Activities and Contractor Activities to Ensure Condition Safely Related Safety, Health, Environment Regulation & Procedure
Manage & Control all Contractor Activities
Supervision & Coordination of Complex Maintenance Works
Operation, Control & Maintenance for Utilities & Facilities
( Compressor, Genset, Chiller, Boiler Blower, Dust Collector, Forklift, Cooling Tower )
Control MTC Budget and Spare Part Usage for Maintenance Activities
Inspection and monitoring of equipment condition and operation as a means of verifying the effectiveness of the Preventive Maintenance program.
DES 2005 – MAR 2008
PT. AKZO NOBEL CAR REFINISHES INDONESIA, PULOGADUNG
- MAINTENANCE & PROJECT COORDINATOR
Manage & Control All Documents Related Maintenance, Engineering Activities
Planning, Propose, Develop Execute Preventive Maintenance Program for All Equipment, Facilities and Building
Planning, Propose, Execute & Control Engineering Project Job Related to Maintenance, Engineering or Facilities and Building
Manage, Control and Provide Permit To Work for Maintenance / Engineering Activities and Contractor Activities to Ensure Condition Safely Related Safety, Health, Environment Regulation & Procedure
Supervision & Coordination of Complex Maintenance Works
Operation, Control & Maintenance for Utilities & Facilities
(Compressor, Generator, Chiller, Blower, Dust Collector, Forklift)
Control MTC Budget and Spare Part Usage for Maintenance Activities
Continuous improvement of Preventive Maintenance Program to Increase Reliability.
JUL 2003 – DEC 2005
PT. ENERGIZER INDONESIA, CIMANGGIS, DEPOK
- MAINTENANCE PLANNER
Make, Propose, Develop & Execute Preventive Maintenance Program for Production Equipment
Control and Updating of CMMS data base ( MP2 ) to Analyze, Develop Preventive Maintenance Program
Supervision & Coordination of Complex Maintenance Works
Provide, Control & Manage Permit to Work Document for Maintenance Activities related to Health, Safety,Environment Regulation
Provide, Control & Manage Permit to Work Document for Contractor Activities related to Health, Safety,Environment Regulation
Analyze Equipment Failure and Propose Preventive and Corrective Action
Implement Modifications to Equipment for Increasing Production Efficiency
Control MTC Budget and Spare Part Usage for Maintenance Activities
Assist Mechanic & Production Team on Equipment Maintenance And Troubleshooting
AGT 2000 – JUL 2003
PT. SHOWA ALUMINUM INDONESI, CIKAMPEK -
STAFF ENGINEERING
Control and Manage All Engineering Documents
Make, Propose & Execute Preventive Maintenance Schedule For all Production Equipment, Machineries & Facilities
Control Operation and Maintenance activities for Utilities System (Boiler, Compressor, WTP, LPG Plant, Hydrant System, Lighting, PABX)
Support Production Process & Improvement
Control of consumable Parts for Production and Utilities (Chemical Material, LPG, Oil)
Propose, Purchase & Control Using Spare Part for Maintenance Activities
OKT 1998 – DES 1999
PT. KARYA MAKMUR ARMADA, PALEMBANG
- STAFF MAINTENANCE
Control Maintenance Activities
Make & Propose Budget for Maintenance Activities
Control and Manage Maintenance Documents
Control Spare Part Usage for Maintenance Activities
Support Production Process & Improvement
Education : 1993 – 1998 UNIVERSITY OF SRIWIJAYA, PALEMBANG
MECHANICAL ENGINEERING
Training : 25 – 26 September 2002
INTERNAL QUALITY AUDIT ISO 9001 : 2000, by AIMS
CONSULTANT, CIKAMPEK
May – November 2002
PREPARATION, IMPLEMENTATION and ACHIEVEMENT
of QUALITY MANAGEMENT SYSTEM ISO 9001 : 2000
October 2003
STATISTIC PROCESS CONTROL, by ENERGIZER INDONESIA
JAKARTA
12 – 13 Mei 2003
MP2 SYSTEM ( CMMS PROGRAM ) OPERATION, by PT.RIA
INDONUSA, JAKARTA
14 – 15 Juli 2004
5S PROGRAM TRAINING, PT.NEVILLE –CLARK INDONESIA
JAKARTA
25-26 September 2004
EFFECTIVE LEADERSHIP TRAINING, by PT.KASSANDRA
JAKARTA
5-7 February 2005
MAINTENANCE PLANNING & SCHEDULING, by MARSHAL
INSITUTE USA, JAKARTA
9-10 April 2005
STOP ( SAFETY TRAINING OBSERVATION PROGRAM )
TRAINING By DUPONT SAFETY RESOURCES
18 October 2006
TOTAL PRODUCTIVE MAINTENANCE By SAMCHAD CONSULTING, JAKARTA
26 – 27 April 2007
INTERNAL TRAINING AUDITOR
PRINCIPLES OF QMS ISO 9001:2000, EMS ISO 14001:1996, QHS OHSAS 18001:1999 By MITRA SYNERGY INDONESIA
December 2007
TRAINING AHLI K3 SPESIALIS KEBAKARAN TINGKAT A,
DEPNAKER, JAKARTA
25 – 27 November 2008
PLC, PRO WORX 32 OPERATION TRAINING By PT.SCHNEIDER, MERAK
11 February 2010
Training Aplikasi GMP-CPOB,by BPOM, Jakarta
25 May 2010
HUMAN ERROR REDUCTION TRAINING,by PT.CAPSUGEL,Cibinong 20 September 2010
PEST CONTROL MANAGEMENT by PT. AADWOLF, Jakarta
1 March 2011
PELATIHAN PENERAPAN PEDOMAN CPOB, BY JOGA RAHARDJO CONSULTANT, JAKARTA
Mai 2011
OIL FREE COMPRESSSOR, OPERATION & MAINTENANCE, By PT. FAJAR MAS MURNI, Bekasi
12 -16 September 2011 & 7 – 11 November 2011
SIX SIGMA, GREEN BELT CERTIFICATION TRAINING, By RATH & STRONG, BOGOR
16 – 17 December 2011
VALIDATION TRAINING, by PT.WMD, CIBINONG
3 – 4 July 2013
BIMBINGAN TEKNIK, OPERASIONAL DAN TROUBLESHOOTING
PADA SYSTEM HYDRAULIC DAN PNEUMATIC, By KEMENTERIAN PERINDUSTRIAN RI, JAKARTA
ENGINEERING PROJECT that Have been Done
Jun 2000 – Jul 2003:
PT. SHOWA ALUMINUM INDONESIA, CIKAMPEK
2003 : Installation and Commissioning New 6 Units Press Machine with capacity 250 ton, 125ton, 25ton, 15 ton for Production Department
2004 : Installation and Commissioning New Burner Machine for Production Department
Jul 2003 – Dec 2005;
PT. ENERGIZER INDONESIA, CIMANGGIS DEPOK
2004 : Installation and Commissioning New 5 Units of Imaje S7 Printing Machine for Packaging Department
2004 ; Installation and Commissioning New Press Machine with Capacity 50 ton for Press Department
Dec 2005 – Mar 2008:
PT. AKZONOBEL CAR REFINISHES INDONESIA, JAKARTA
2006 : Replacement of All Factory and Warehouse Roof by using Spandex Roof produced by Bluescoope Lysaght
2006 : Project New Re-Charging Building area for all factory’s forklifts 2007 : Installation and Commissioning the System of Fire Alarm Detector for all Factory and Warehouse
2007 : Installation and Commissioning New Diesel Generator Deutz 500 KVA
Jun 2009 – Feb 2012:
PT.CAPSUGEL INDONESIA, CIBINONG
2009 : Commissioning and Installation of HVAC system for Printing Department
: Up- Grade HVAC system for Warehouse Factory
: Commissioning and Installation of New Purified Water Unit by using RO- EDI system with capacity 2000 L/H
2010 : Commissioning and Installation of HVAC system for Raw Material Warehouse Department
: Commissioning and Installation New Diesel Generator Perkins 1120 KVA
: Up-Grade of Installation Fire Hydrant System
: Up-Grade Installation Waste Water Treatment Unit by increasing the Treatment Capacity
: Up- Grade installation of Steam Calorifier system 2011 : Installation and commissioning of New Dehumidifier Kathapac system with capacity 1500 Cfm.
: Installation and commissioning New 2 units of Ingersoll Rand Oil Free Compressor System and 3 Units of Refrigerant Dryer System
: Up-Grade Boiler unit from Gas system to Combination Burner System ( Gas –Diesel )
: Installation and commissioning of New Addition HVAC system for production area.
: Installation and commissioning of New Exhaust Blower 90 KW for Production area
: Project New Building Facility area for addition Installation of Chiller unit
: Project New Raw Material Warehouse, include ME and HVAC system .
Mar 2012 – Jul 2017
PT.SUNTHI SEPURI, TANGERANG
2012 : Installation and Commissioning New Diesel Generator Cummins 450 KVA
: Installation and Commissioning of New JCMCO Press Machine capacity 50 pcs/mnt
: Up-Grade HVAC system for Non Betalactam Building
: Project Planning of Upgrade Fire Hydrant System Installation ( On-Progress ) 2013 : Installation and Commissioning of New Purified Water Unit by using RO- EDI system with capacity 1000 L/H
: Up-Grade HVAC system for Hormonal Building
: Up-Grade of Piping Installation Cooling System for Purified Water 2015 : Installation and Commissioning of New Blister Machine Uhlmann B 1250 with High Solution Infrared Camera Technology
: Installation and Commissioning, Up-Grade New Gas Burner system for Boiler
: Installation and Commissioning GAS Piping Installation for Boiler system
: Installation and Commissioning Water Piping Installation for Raw Water Unit.
: New Warehouse Building for Finish Good Product ( On-Progress ) 2016 : Project New Warehouse Material Building for Packaging Material
: Installation and Commissioning Kobelco Oil Free Air Compressor 35 KW
Agt 2017 – Feb 2019
PT. MENARINI INDRIA LABORATORIES
2019 : Installation and Commissioning Cold Storage with capacity 25,000 ltr
: Installation and Commissioning Production Facility for Dermatic Product ( Civil, Electrical, HVAC, Purified Water Installation )
: Installation and Commissioning Production Facility for Tablet ( Civil, Electrical, HVAC )
: Upgrade Installation of PW-RO installation for Tablet Production Facility