Post Job Free

Resume

Sign in

Engineering, Maintenance and Utility System

Location:
Bandung, West Java, Indonesia
Salary:
IDR 25,000,000
Posted:
July 08, 2021

Contact this candidate

Resume:

Depok, April **th,****

To.

HR. RECRUITMENT DEPARTMENT

Dear HR. Recruitment Manager

The opportunity to join your company makes me interested. ENGINEERING, MAINTENANCE and UTILITY is the field I would like to apply. Please kindly let me introduce my main personnel data:

Name : Budiman Satya, ST

Sex : Male

Age : 46 years old

Nationality : Indonesia

Status : Married

Address : Grand Depok City Cluster Alpinia Blok B No.11 RT.08 RW.06, Kel.Tirtajaya kec.Sukmajaya, Depok

West Java, Indonesia, 16412

Education : Mechanical Engineering- Sriwijaya University Profession : PT.ERRITA PHARMA Indonesia (Pharmaceutical) Phone : +62-877*********

Email : adnmao@r.postjobfree.com

In addition, I am able to use an English (in writing and active speaking) and able to operate applied computer programs (Words, Excel, MP 2). Currently I am still working at PT. ERRITA PHARMA as ENGINEERING MANAGER. I hope I am the one whom you are seeking. It is big chance to develop my talents by joining your company. I look forward appreciatelly to hear from you soon. Thank you for your attention.

Sincerely,

BUDIMAN SATYA, ST

BUDIMAN SATYA, ST

Sex : Male

Age : 46 years old

Nationality : Indonesia

Status : Married

ID card No. : 3276053009740012

Address : Grand Depok City Cluster Alpinia Blok B No.11 RT.08 RW.06, Kel.Tirtajaya kec.Sukmajaya, Depok

West Java, Indonesia, 16412

Education : Mechanical Engineering- Sriwijaya University Phone : +62-877*********

Email : adnmao@r.postjobfree.com

Experience :

JUN 2020 – NOW

PT. ERRITA PHARMA (PHARMACEUTICAL)

Manage & Control All Documents Related Maintenance, Engineering Activities

Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building

Repair and Troubleshooting for all Equipment, Facilities and Building

Planning, propose and control Annual budget for Engineering and maintenance Activities.

Develop the plant’s facilities preventive maintenance, replacement and upgrade plan

Manage projects related to facilities upgrades and changes

Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.

Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.

Develop technicians to increase engineering skills

Supporting Manufacturing operations in achieving the overall plant operational performance in term of product quality, productivity, reliability, profitability, cost competitiveness and overall business financial achievement

APRIL 2019 – JANUARY 2020

PT. SEPATU MAS IDAMAN (Member of Gunung Sewu Group)

Manage & Control All Documents Related Maintenance, Engineering Activities

Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building

Repair and Troubleshooting for all Equipment, Facilities and Building

Planning, propose and control Annual budget for Engineering and maintenance Activities.

Develop the plant’s facilities preventive maintenance, replacement and upgrade plan

Manage projects related to facilities upgrades and changes

Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.

Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.

Develop technicians to increase engineering skills

Supporting Manufacturing operations in achieving the overall plant operational performance in term of product quality, productivity, reliability, profitability, cost competitiveness and overall business financial achievement

AGT 2017 – FEB 2019

PT. MENARINI INDRIA LABORATORIES (PHARMACEUTICAL)

Manage & Control All Documents Related Maintenance, Engineering Activities

Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building

Repair and Troubleshooting for all Equipment, Facilities and Building

Planning, propose and control Annual budget for Engineering and maintenance Activities.

Develop the plant’s facilities preventive maintenance, replacement and upgrade plan

Manage projects related to facilities upgrades and changes

Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.

Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.

Develop technicians to increase engineering skills

Leading all medium and long term improvement engineering activities

Supporting Manufacturing operations in achieving the overall plant operational performance in term of product quality, productivity, reliability, profitability, cost competitiveness and overall business financial achievement

Responsible as HSE coordinator related to Manufacturing Operation activities

MAR 2012 – JUL 2017

PT. SUNTHI SEPURI (PHARMACEUTICAl)

Manage & Control All Documents Related Maintenance, Engineering Activities

Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building

Planning, propose and control Annual budget for Engineering and maintenance Activities.

Repair and Troubleshooting for all Equipment, Facilities and Building

Develop the plant’s facilities preventive maintenance, replacement and upgrade plan

Manage projects related to facilities upgrades and changes

Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.

Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.

Develop technicians to increase engineering skills

Leading all medium and long term improvement engineering activities

Supporting Manufacturing operations in achieving the overall plant operational performance in term of product quality, productivity, reliability, profitability, cost competitiveness and overall business financial achievement

Responsible as HSE coordinator related to Manufacturing Operation activities

JUN 2009 – FEB 2012

PT. CAPSUGEL INDONESIA (PHARMACEUTICA)

Manage & Control All Documents Related Maintenance, Engineering Activities

Operation, Control & Maintenance for Utilities & Facilities

( Compressor, Generator, Chiller, Boiler, Blower, Dust Collector, Forklift, Cooling Tower,HVAC )

Develop the plant’s facilities preventive maintenance, replacement and upgrade plan

Establish SOP for regular inspection, preventive maintenance, repair procedures, and ensure the direct reports follow the SOP

Review the status of current planned and in progress maintenance work and approve daily work plan for direct reports

Regularly review facilities performance reports, conduct visual inspection of facilities and arrange the investigation of abnormalities

Manage projects related to facilities upgrades and changes

Monitor the real time utilities demand of the plant and adjust the capacity of supply facilities

Develop annual facilities operating plan, including any additions or changes to the Plant's facilities, based on the Plant's operation plan

Coordinate with other related Department/Division regarding the technical and quality specification of projects to build and provide inputs when necessary to ensure that the project meets the standard quality and safety requirement.

Ensure coordination with Purchasing Department to provide the necessary spare parts for preventive and corrective maintenance plans.

APR 2008 – JUN 2009

PT. LATEXIA INDONESIA, MERAK ( CIBA CHEMICAL GROUP )

- MAINTENANCE SUPERVISOR

Manage & Control All Documents Related Maintenance, Engineering Activities

Planning, Propose, Develop Execution of Preventive Maintenance Program for All Equipment, Facilities and Building

Planning, Propose, Execute & Control Engineering Project Job Related to Maintenance, Engineering or Facilities and Building

Provide Permit to Work for Maintenance /Engineering Activities and Contractor Activities to Ensure Condition Safely Related Safety, Health, Environment Regulation & Procedure

Manage & Control all Contractor Activities

Supervision & Coordination of Complex Maintenance Works

Operation, Control & Maintenance for Utilities & Facilities

( Compressor, Genset, Chiller, Boiler Blower, Dust Collector, Forklift, Cooling Tower )

Control MTC Budget and Spare Part Usage for Maintenance Activities

Inspection and monitoring of equipment condition and operation as a means of verifying the effectiveness of the Preventive Maintenance program.

DES 2005 – MAR 2008

PT. AKZO NOBEL CAR REFINISHES INDONESIA, PULOGADUNG

- MAINTENANCE & PROJECT COORDINATOR

Manage & Control All Documents Related Maintenance, Engineering Activities

Planning, Propose, Develop Execute Preventive Maintenance Program for All Equipment, Facilities and Building

Planning, Propose, Execute & Control Engineering Project Job Related to Maintenance, Engineering or Facilities and Building

Manage, Control and Provide Permit To Work for Maintenance / Engineering Activities and Contractor Activities to Ensure Condition Safely Related Safety, Health, Environment Regulation & Procedure

Supervision & Coordination of Complex Maintenance Works

Operation, Control & Maintenance for Utilities & Facilities

(Compressor, Generator, Chiller, Blower, Dust Collector, Forklift)

Control MTC Budget and Spare Part Usage for Maintenance Activities

Continuous improvement of Preventive Maintenance Program to Increase Reliability.

JUL 2003 – DEC 2005

PT. ENERGIZER INDONESIA, CIMANGGIS, DEPOK

- MAINTENANCE PLANNER

Make, Propose, Develop & Execute Preventive Maintenance Program for Production Equipment

Control and Updating of CMMS data base ( MP2 ) to Analyze, Develop Preventive Maintenance Program

Supervision & Coordination of Complex Maintenance Works

Provide, Control & Manage Permit to Work Document for Maintenance Activities related to Health, Safety,Environment Regulation

Provide, Control & Manage Permit to Work Document for Contractor Activities related to Health, Safety,Environment Regulation

Analyze Equipment Failure and Propose Preventive and Corrective Action

Implement Modifications to Equipment for Increasing Production Efficiency

Control MTC Budget and Spare Part Usage for Maintenance Activities

Assist Mechanic & Production Team on Equipment Maintenance And Troubleshooting

AGT 2000 – JUL 2003

PT. SHOWA ALUMINUM INDONESI, CIKAMPEK -

STAFF ENGINEERING

Control and Manage All Engineering Documents

Make, Propose & Execute Preventive Maintenance Schedule For all Production Equipment, Machineries & Facilities

Control Operation and Maintenance activities for Utilities System (Boiler, Compressor, WTP, LPG Plant, Hydrant System, Lighting, PABX)

Support Production Process & Improvement

Control of consumable Parts for Production and Utilities (Chemical Material, LPG, Oil)

Propose, Purchase & Control Using Spare Part for Maintenance Activities

OKT 1998 – DES 1999

PT. KARYA MAKMUR ARMADA, PALEMBANG

- STAFF MAINTENANCE

Control Maintenance Activities

Make & Propose Budget for Maintenance Activities

Control and Manage Maintenance Documents

Control Spare Part Usage for Maintenance Activities

Support Production Process & Improvement

Education : 1993 – 1998 UNIVERSITY OF SRIWIJAYA, PALEMBANG

MECHANICAL ENGINEERING

Training : 25 – 26 September 2002

INTERNAL QUALITY AUDIT ISO 9001 : 2000, by AIMS

CONSULTANT, CIKAMPEK

May – November 2002

PREPARATION, IMPLEMENTATION and ACHIEVEMENT

of QUALITY MANAGEMENT SYSTEM ISO 9001 : 2000

October 2003

STATISTIC PROCESS CONTROL, by ENERGIZER INDONESIA

JAKARTA

12 – 13 Mei 2003

MP2 SYSTEM ( CMMS PROGRAM ) OPERATION, by PT.RIA

INDONUSA, JAKARTA

14 – 15 Juli 2004

5S PROGRAM TRAINING, PT.NEVILLE –CLARK INDONESIA

JAKARTA

25-26 September 2004

EFFECTIVE LEADERSHIP TRAINING, by PT.KASSANDRA

JAKARTA

5-7 February 2005

MAINTENANCE PLANNING & SCHEDULING, by MARSHAL

INSITUTE USA, JAKARTA

9-10 April 2005

STOP ( SAFETY TRAINING OBSERVATION PROGRAM )

TRAINING By DUPONT SAFETY RESOURCES

18 October 2006

TOTAL PRODUCTIVE MAINTENANCE By SAMCHAD CONSULTING, JAKARTA

26 – 27 April 2007

INTERNAL TRAINING AUDITOR

PRINCIPLES OF QMS ISO 9001:2000, EMS ISO 14001:1996, QHS OHSAS 18001:1999 By MITRA SYNERGY INDONESIA

December 2007

TRAINING AHLI K3 SPESIALIS KEBAKARAN TINGKAT A,

DEPNAKER, JAKARTA

25 – 27 November 2008

PLC, PRO WORX 32 OPERATION TRAINING By PT.SCHNEIDER, MERAK

11 February 2010

Training Aplikasi GMP-CPOB,by BPOM, Jakarta

25 May 2010

HUMAN ERROR REDUCTION TRAINING,by PT.CAPSUGEL,Cibinong 20 September 2010

PEST CONTROL MANAGEMENT by PT. AADWOLF, Jakarta

1 March 2011

PELATIHAN PENERAPAN PEDOMAN CPOB, BY JOGA RAHARDJO CONSULTANT, JAKARTA

Mai 2011

OIL FREE COMPRESSSOR, OPERATION & MAINTENANCE, By PT. FAJAR MAS MURNI, Bekasi

12 -16 September 2011 & 7 – 11 November 2011

SIX SIGMA, GREEN BELT CERTIFICATION TRAINING, By RATH & STRONG, BOGOR

16 – 17 December 2011

VALIDATION TRAINING, by PT.WMD, CIBINONG

3 – 4 July 2013

BIMBINGAN TEKNIK, OPERASIONAL DAN TROUBLESHOOTING

PADA SYSTEM HYDRAULIC DAN PNEUMATIC, By KEMENTERIAN PERINDUSTRIAN RI, JAKARTA

ENGINEERING PROJECT that Have been Done

Jun 2000 – Jul 2003:

PT. SHOWA ALUMINUM INDONESIA, CIKAMPEK

2003 : Installation and Commissioning New 6 Units Press Machine with capacity 250 ton, 125ton, 25ton, 15 ton for Production Department

2004 : Installation and Commissioning New Burner Machine for Production Department

Jul 2003 – Dec 2005;

PT. ENERGIZER INDONESIA, CIMANGGIS DEPOK

2004 : Installation and Commissioning New 5 Units of Imaje S7 Printing Machine for Packaging Department

2004 ; Installation and Commissioning New Press Machine with Capacity 50 ton for Press Department

Dec 2005 – Mar 2008:

PT. AKZONOBEL CAR REFINISHES INDONESIA, JAKARTA

2006 : Replacement of All Factory and Warehouse Roof by using Spandex Roof produced by Bluescoope Lysaght

2006 : Project New Re-Charging Building area for all factory’s forklifts 2007 : Installation and Commissioning the System of Fire Alarm Detector for all Factory and Warehouse

2007 : Installation and Commissioning New Diesel Generator Deutz 500 KVA

Jun 2009 – Feb 2012:

PT.CAPSUGEL INDONESIA, CIBINONG

2009 : Commissioning and Installation of HVAC system for Printing Department

: Up- Grade HVAC system for Warehouse Factory

: Commissioning and Installation of New Purified Water Unit by using RO- EDI system with capacity 2000 L/H

2010 : Commissioning and Installation of HVAC system for Raw Material Warehouse Department

: Commissioning and Installation New Diesel Generator Perkins 1120 KVA

: Up-Grade of Installation Fire Hydrant System

: Up-Grade Installation Waste Water Treatment Unit by increasing the Treatment Capacity

: Up- Grade installation of Steam Calorifier system 2011 : Installation and commissioning of New Dehumidifier Kathapac system with capacity 1500 Cfm.

: Installation and commissioning New 2 units of Ingersoll Rand Oil Free Compressor System and 3 Units of Refrigerant Dryer System

: Up-Grade Boiler unit from Gas system to Combination Burner System ( Gas –Diesel )

: Installation and commissioning of New Addition HVAC system for production area.

: Installation and commissioning of New Exhaust Blower 90 KW for Production area

: Project New Building Facility area for addition Installation of Chiller unit

: Project New Raw Material Warehouse, include ME and HVAC system .

Mar 2012 – Jul 2017

PT.SUNTHI SEPURI, TANGERANG

2012 : Installation and Commissioning New Diesel Generator Cummins 450 KVA

: Installation and Commissioning of New JCMCO Press Machine capacity 50 pcs/mnt

: Up-Grade HVAC system for Non Betalactam Building

: Project Planning of Upgrade Fire Hydrant System Installation ( On-Progress ) 2013 : Installation and Commissioning of New Purified Water Unit by using RO- EDI system with capacity 1000 L/H

: Up-Grade HVAC system for Hormonal Building

: Up-Grade of Piping Installation Cooling System for Purified Water 2015 : Installation and Commissioning of New Blister Machine Uhlmann B 1250 with High Solution Infrared Camera Technology

: Installation and Commissioning, Up-Grade New Gas Burner system for Boiler

: Installation and Commissioning GAS Piping Installation for Boiler system

: Installation and Commissioning Water Piping Installation for Raw Water Unit.

: New Warehouse Building for Finish Good Product ( On-Progress ) 2016 : Project New Warehouse Material Building for Packaging Material

: Installation and Commissioning Kobelco Oil Free Air Compressor 35 KW

Agt 2017 – Feb 2019

PT. MENARINI INDRIA LABORATORIES

2019 : Installation and Commissioning Cold Storage with capacity 25,000 ltr

: Installation and Commissioning Production Facility for Dermatic Product ( Civil, Electrical, HVAC, Purified Water Installation )

: Installation and Commissioning Production Facility for Tablet ( Civil, Electrical, HVAC )

: Upgrade Installation of PW-RO installation for Tablet Production Facility



Contact this candidate