Jeffrey Simons

**/**/**

Worked as Instrument Supervisor. (Construction) February 2021.

Would like a position as Instrument Field Technician.

Positions I previously successfully occupied: See attached Cv.

Regards

Jeffrey Simons

This CV contains Personal Details and contact information. Also includes a compact brief of my work history in the field of Industrial Instrumentation and Completions Handover Engineering. From my broad experience I am comfortable in any of these positions and can be an asset to your organization. With my skills and experience I will cope with the construction and supervision, pre-commissioning, commissioning and start up, Health, safety, environment and quality. I have broad experience with Completion and handover of Construction Projects with major international clients. i.e. Mechanical Completion and Commissioning.

Instrument Supervisor/ Technician

2021

CURRICULLUM VITAE: JEFFREY SIMONS

Non-Degree have over 35 years

related experience. (See Trade Papers)

Positions I have already successfully filled:

● Instrument Technician

● Field Installations / Commissioning (Engineer)

●Turnover Completions Packages (TCP) - (DFO Co-Ordinator)

● Systems Completions (Engineer)

●Quality Control Inspector (Control Instrumentation)

●Supervision.

●Punch List Co-ordinator

I have work closely with Electrical, welding, piping, process (Operations) and ‘some’ civil related disciplines. I can read and understand P & Id’s, electrical-, mechanical- and other construction related drawings.

SUMMARY

I AM WELL VERSED IN THE OFFICE AND PLANT…

Objective:

To be part of a motivated and goal-oriented team for timeous completion of given work scope. I am a proactive individual and is ready to lead or/and assist wherever a skill is required.

My experience in construction covers (Petro-chemical) and (Mining) and can be of value in instruments (i.e.: Plant building, Commissioning and Quality Control. I am comfortable in the field or in the office. I prefer both work and update. I tend to simplify things for everyone to understand.

Some places I’ve worked: In Petro-chemical, places like Kazakhstan, Russia (Sakhalin Island), UAE, Saudi Arabia, Angola, South Africa and working in mining, in Congo, Namibia, Botswana, I have a good relationship with various cultures. Always have good rapport and standing friendships. Always willing to learn.

EXECUTIVE SUMMARY

Over years in the Petrochemical industry (Onshore and Offshore), including Mining. I have built up valuable experience and have occupied various positions:

Systems Completions Handover Engineer, Lead Qc Inspector (instruments), Instrument Technician, Instrument Supervisor, Commissioning / Field Engineer, Deliverables for Operations (DFO) Turnover Coordinator.

TASKS AND RESPONSIBILITIES:

●I represented companies in daily construction meetings.

●Liaised with vendors.

●Coordinate punch list.

●Co-ordinated loop checks.

I coped with the construction responsibilities such as:

●Supervision, pre-commissioning, commissioning and start up.

●Health, safety, environment and quality.

PERSONAL STRENGTHS AND ABILITIES

●I have a lot of experience in the office and I am very efficient in that environment. I am at home with construction challenges in the field. I’ve had a successful career in plant building and can stand up to any construction challenge.

●I have excellent MEGA Project, Offshore and Mining experience internationally. I am familiar with the Permit to Work System (PTW). I am familiar with the OHS (Occupational Health and Safety Regulations), JSA (Job Safety Analysis).

WORK HISTORY

February 2019 to February 2021

RS Instrumentation

Construction Supervisor: Sox Emissions Compliance Project at Astron Energy in Cape Town South Africa.

Oversee all Instrumentation related construction activities. Regular site walks to access daily work progress. Work closely with other Engineers, Supervisors and Safety to address daily ongoing construction challenges. Work Scope include installation of cable racks and supports, cable droppers, instrument stands, Junction Boxes. Cable installations: Multi Pair, Single pair and Electrical Armoured cable installations.

Installation of instruments and commissioning. Installation of system and shutdown cabinets in rack rooms.

My years of construction experience gives allows me to plan and execute working strategies more effectively.

June 2018 to February 2019

Astron Refinery (was Chevron refinery)

Daily maintenance and repairs of control instruments as per work schedule. Installation and commissioning of Boiler repair project.

September 2017 to June 2018

Work with RS Instrumentation as Construction Supervisor on a new TTLR Gantry with 8 loading bays.

Products include: HFO, D500, D50, LRP, ULP, BGO, ULP.

My extensive experience in both construction and maintenance, resulted in achieving completion within set dates.

●My main activities: Safety toolbox talks. PTW, Oversee daily work activities as per schedule. This includes, electrical, mechanical, Instrumentation and instrument tubing.

●Electrical: Cable pulling, Strapping, Terminations, J/B installations, Earthing, Cable racking and Glanding.

●Mechanical: Support structures, cable droppers, brackets.

●Instrumentation: Instrument installations, tubing, terminations, labelling, commissioning.

●System cabinets: Installations and terminations.

February 2015 till June 2017

Chevron Refinery Cape Town (South Africa) __ work on contract for Group Five Engineering.

From February 2015 until June 2017

INSTRUMENT TECHNICIAN (Maintenance)

Engaged in Instrument shutdown activities:

●Removal and refurbishment of process instrumentation.

●Calibration, function and loop checked to DCS.

Project Work:

●I have led small team technicians on projects. i.e.:

●(Installations, Racking, cables, loop- check and commissioning of control instrumentation)

Daily Routine work activities:

●Completed work as per daily work schedule.

●Have PTW accreditation.

●Familiar working with Hart 475 Communicator and Smart instrumentation.

Control Types:

●RTD (Resistance temperature detectors), PT100 and Type K thermocouples.

●Fault-finding from field to DCS including new Cap screen alarm identification, (IOW) Integrity Operating Window, SOL Safe Operating Limit.

●Various types of control instrumentation.

Use references such as:

●Data sheets, Loop drawings, P&ID’s, “As Built” drawings and punch lists.

Data and reporting tools:

●IBM Maximo: Maintenance activity recorded on this asset gives the necessary amount of failure/performance data to provide cost, failure and fit-for-purpose data attributes against that asset.

Motivated in:

●Replacement and installation of instrumentation and equipment per manufacturer specifications.

●Timeous completion of work.

How can this two-year working maintenance benefit your company?

●I have gained fresh experience in installations, fault-finding, commissioning and start-ups.

September 2013 to December 2014

Auto Detail Services: (Workshop) __ Building construction of extension of workshop.

Bellville, Cape Town.

Worked as Electrical Technician.

Extension of workshop project:

●Electrical cable installation, Plug points, lights, heaters and CCTV cameras.

●General maintenance of all electrical related work.

This business benefits from my flexibility dealing with construction related electrical challenges.

From May 2011 to December 2012

INSTRUMENT TECHNICIAN: Contracting at Petrosa in South Africa.

From June 6’2010 December 30’2010 Project: Exxon Mobil / Flour / Kentz

Sakhalin 1 Development. ODOPTU NORTH WELL SITE (NWS). Sakhalin Island (Federation of Russian Republic)

My challenge here was to work off major backlog of uncompleted work to be ready for Handover.

This I achieved by providing my services working as a DFO Coordinator.

DFO COORDINATOR (Deliverables for Operations) … Design and build turnover packages for Mechanical Completions.

●Co-ordinating the flow of documentation from construction to completions.

●Using Complete It Win (PCS) to achieve expeditious Handover of Turn over Packages.

●Receiving and check if check sheets from all disciplines is filled in correct and signed.

●That includes Hydro Test Packs, Instrument, Electrical, Mechanical and other.

●Have this input into Complete IT management system.

●Send daily status reports to management that can assist them in their daily progress meetings.

●Assist supervisors and engineers with project information. Query technical related issues.

●Keep track of punch list items and reports.

I proof my input worthy, by timeously delivery of handover dossiers on Mechanical Completion.

My responsibility also included:

The compilation and handover of technical documentation to the Client, including expediting and close out.

Developing construction, quality and regulatory documentation required for FD turnover as per DFO specification i.e. FD Manuals (FD – Final Delivery).

Ensure the timely and accurate compilation and acceptance of system turnover packages in order to support the construction and commissioning schedules.

Coordinate with other Contractors for Systems updates and Systems progress on all work so that an orderly Turnover of each System can be achieved.

Provide progress status of all FD packages and ensure completion of all outstanding punch list items.

Assist Quality team in preparation of turnover documentation in order to meet project requirements.

Conduct weekly DFO meeting with Client to expedite rectification of any arising issues on documentation and dossiers preparations.

Data and reporting tools:

WinPCS™ - Windows Project Completion System - a certification tool (PCS / CMS), a tracking tool, a Construction and Commissioning Management System (CCMS)and a Preservation system, developed by Complan Group.

From April 6’2010 TO June 6’2010

Employer Group 5 Engineering

PROJECT: CHEVRON REFINERY (CAPE TOWN)

INSTRUMENT TECHNICIAN 6 WEEK SHUTDOWN

My qualities at this project were working without Supervision.

Main responsibility:

●To overhaul the Regenerator, Reactor and Riser Temperatures.

●Loop check and commission these signals to Yokogawa DCS.

●Also work with valve Types: Masoneilan, Fisher, Neles etc.

●Transmitter types: Rosemount, Yokogawa, Fuji, Foxboro etc.

●Checked Calibrations and loop check to DCS.

Other areas of experience on the waste heat boilers removed and overhauled igniters.

Start-up of steam Boilers.

November 4’2009 TO MARCH 31’2010

Employer: Group 5 Engineering

PROJECT: BP PETROLEUM - TANK FARM (CAPE TOWN)

INSTRUMENT TECHNICIAN upgrading of tanker loading bays.

Applying my broad experience, working in construction I took the lead in activities of:

●Upgrading of all loading bays to international safety standard which include:

1.The installation and commissioning gas detectors, flow valves, emergency stops and traffic light system.

2.Installation of docking posts for fuel loading arms with proximity sensors. Installation of CCTV’s.

August 28’ 2009 TO November 4 ’2009

Employer: Grinaker LTA

PROJECT: MOSSEL BAY (SOUTH AFRICA) PETROSA REFINERY

QUALITY CONTROL INSPECTOR (LEAD) (Office & Field)

I was instrumental in the successful handover of shutdown activities as per schedule. This I achieved by:

●BUILDING COMPLETIONS HANDOVER PACKAGES for control Loops within the Instrumentation work scope.

●Populating packages with check sheets, Data sheets, P&Id, Loop drawings and punch lists.

●Compiled a completion Matrix to monitor the step by step completion of work activities until loop check and handover.

●Presented daily progress updates to management to reflect in their progress meetings.

APRIL 25’2009 TO JUNE 10’2009

Employer: Wade Walker Engineering

PROJECT: Republic of Congo Tenge / Fungurume Copper Mine

Mining

INSTRUMENT SUPERVISOR

My responsibilities:

1. I oversaw the installation and commissioning of equipment and field instrumentation.

Work Area:

Installation of a new electrical turbine, including other plants of a new mining development.

Equipment and Controls:

2.i.e. Lube Oil Skid, Filtration System, Generator, Clutch, Turbine (Steam),

Installations of:

3.System Cabinets, Junction Boxes, Power Supplies, Cable Trays.

4.Field Instrumentation, Pulling of cables.

5.Termination of instruments in JB's.

6.Commissioning of control loops to DCS.

I also coordinated loop checks on other plants:

7. i.e.: Demineralised Water, Cooling Towers, Scrubbers, Burners, Deaerator, Blowers, Compressors, Sulphur Process and Recovery Plants.

Testing procedures include:

8.Testing of positive signal from instrument through PLC to DCS. Flow-, Pressure-, level-, temperature transmitters. Control and Shutdown Valves, Etc.

MARCH 25 ’2009 TO APRIL 15 ’2009

Employer: Group 5 Engineering

PROJECT: Cape Town South Africa

Chevron Refinery

SHUTDOWN COORDINATOR MARKED UP AND REMOVED INSTRUMENTATION FOR SHUTDOWN. Oversaw the Revamp, Calibrate and replace field instrumentation on Vessels, Columns, Drums, including Waste Heat Boiler and furnaces. Checked all Input/output signals and commission to the DCS. Assist Operations with start-up.

NOV. 2007 TO SEPT. 2008

Employer: Kentz Russia

PROJECT: SAKHALIN ISLAND RUSSIA __ Royal Dutch Shell

OPF PROJECT (KENTZ RUSSIA).

SYSTEM COMPLETIONS ENGINEER

My abilities were the dedication for driving and motivating the Completions Engineers and Commissioning Engineers, to be responsible and accountable for the completion of control systems as defined by work scope and handover (per system).

1.To achieve this, we:

Developed Turnover Completion Packages (TCP) for each system and subsystem.

Validated packages for completeness, accuracy, and compliance of acceptable codes, standards and regulations.

2.Implemented System Completion Processes:

To ensure effective completion, commissioning and handover.

To prepare for start-up and operation of this OPF Oil and Gas Facility.

3.Data and reporting tools:

Used a computerized, Completion Management System (CMS) for tracking and quality completion. Turnover and Completion Packages was managed using software: Thule Engineering/TCS LITE Completions Preparations and status Monitoring Reports.

4.Process:

We populated the system completions dossiers with Commissioning Test records for Instruments, Electrical, Piping/Process, HVAC, Civil/Structural and Safety.

Thereby ensuring that commissioning aspects of Mechanical completion activities were met.

Co-ordinating the closing of punch items according punch lists ‘raised’.

Signing OFF occurs in Master punch list Dossiers by Discipline Champions.

Assisting Discipline Engineers with the correct structure of punch issues, including its Status (CAT ‘A’ / CAT ‘B’) and responsibility.

5.Other responsibilities:

Also dealt with Hydro-Test Pack No’s, for associated Isometrics and Line numbers.

Work with various disciplines to ensure that punch items are being cleared.

Update of daily progress of status in Excel format including comments (Restraints).

Capture CAT ’A’ issues and Operational Deviations in the form of a Verification Certificate of Readiness (VCR) for Dossier handover from commissioning to Operations, thereby ensuring that these issues are recorded in a punch list.

6.Representation:

Represent System Completions in daily meetings: Construction meetings, Operations meetings, Weekly Systems forecast planning.

7.Accountability:

Produced Weekly summarized reports that reflect the System Completion Status of various Systems.

Track status and progress of system, sub system and / or partial system turnovers and provide reports to Commissioning Manager as required.

8.General:

Also engaged in other activities (within experience and skills) that was from time to time required by Management.

Data and reporting tools:

SEIC’s THULE Completion Management System.

MAY 2007 TO JULY 2007

Employer: Sepam

PROJECT: TENGIZ – KAZAKHSTAN TCO- PROJECT

(Tengiz - Chevron Oil Field) __ Chevron / Flour / Sepam

COMMISSIONING TECHNICIAN: COMMISSIONING OF FIELD INSTRUMENTATION TO DCS.

Start-up of motors on the cooling fans. Operation of and function check of Louvre's. Commissioning according set Start up Procedures. Function checks control and shutdown valves. Loop checks Fire & Gas equipment in the Crude Plant. Commissioning of Control Instrumentation according Systems as required by Operations. Assist and support other members of the commissioning team as required.

JANUARY 2007 TO MAY 2007

Employer: Siemens South Africa

PROJECT: MOSSEL BAY SOUTH AFRICA OCGT POWER STATION FOR ESCOM SOUTH AFRICA SIEMENS GERMANY PROJECT.

I & C SYSTEMS

COMMISSIONING TECHNICIAN

Function Checks of control loops Auto Control through the SPPA. T-3000 and the Siemens Semantic S7 400 PLC. i.e. Temp., Pressure, solenoid valves, air intake flaps, ignitors etc. Working with FFR (Field Revision Requests) to do changes on DI/DO, AI/AO MODULES. Assist with the commissioning of internal wiring of Generators, Compressors, Turbines, Combustion Chambers, Cooling Tower Pumps, Lube Oil Skid and other skids. Smoke Stacks, vibration sensors (shaft), bearing clutch temperatures, mechanism, speed probes, fire eyes etc.

OCT. 2006 TO NOV. 2006 SHUTDOWN PETROSA REFINERY SOUTH AFRICA

Employer: Trade Flux

QUALITY CONTROL INSPECTOR

SEPTEMBER 2006 (FPSO) KUITO in ANGOLA SBM PROJECT.

Installed cable racks, cables. Field instrumentation including commissioning. Working off work packs.

JULY 2006

(FPSO) DALIA IN Cape Town HARBOUR CONTRACTOR TECHNIP.

commissioning of field instrumentation to dcs.repairing the earthing system in the system cabinets.

FEBRUARY TO MAY 2007 SASOL POWER STATION SOUTH AFRICA

Employer: Apollo Engineering

COMMISSIONING TECHNICIAN INSTRUMENT INSTALLATION & COMMISSIONING

Revamp of 2 fire damaged 11kv Bevari Generators at Sasol in Secunda Petro-chemical facility. Identify, remove and replace (200+) 525 Vac fire damaged cables, including cables to the UPS Distribution Boards. Calibrate and loop checked Control Instrumentation.

OCTOBER 2005 TO DECEMBER 2005 CHEVRON REFINERY CAPE TOWN

Employer: RSI Instrumentation

QUALITY CONTROL INSPECTOR Overseeing the Quality Control Programs of Control Instrument Installations __ leading to the handover to client, i.e. signing of loop packs,

liaising with the client and assessing documentation.

AUGUST 2004 TO SEPTEMBER 2005 RUWAIS (UNITED ARAB EMIRATES)

Employer: LTA Grinaker & Aljaber Joint Venture

Unleaded Gasoline / Low Sulphur Gas Oil Project.

QUALITY CONTROL INSPECTOR Inspection on completed equipment, instrument and

Cable installations. Request for Inspections (RFI). Completion of all related documentation including the making of loop packs. Also “AS BUILT” Drawings. Inspection of Equipment Room including DCS.

MAY 2003 TO NOVEMBER 2003 ABQAIQ (SAUDI ARABIA)

Employer: Cobra Installations

GAS PLANT - ARAMCO

PROJECT: REVAMP ON 4 BOILERS.

Relocating Process Interface Building to divide the existing Boiler Management System (BMS).

CONSTRUCTION COORDINATOR Coordinate the following works: Dismantle and reassemble of Marshalling, DCS, and Vibration System Cabinets. Re-routing of communication and

system cables. New secondary runs from field to JB's to (PIB) Process Interface Building. Check whether loop folders are correct. Check whether the wiring and tagging are correct. Pre-commissioning of loops and fault-finding on problems.

FEBRUARY 2003 TO APRIL 2003 HARADH GOSP II GAS GATHERING (SAUDI ARABIA)

COMMISSIONING TECHNICIAN

PROJECT: Construction of new Gas and Oil Separation Plant (PMT) –ARAMCO SEPTEMBER to DECEMBER 2002 SPJV (Scorpion Zinc Project) NAMIBIA

LOOP CHECKS COORDINATOR Construction of a new Zinc Mine

Preparation of Instrument Control Loops i.e. making sure the wiring is correct, the PLC I/O’s (Input/Output) signals go to the correct Plc and DCS addresses. Pre-loop check control loops and Motor runs.

JULY TO AUGUST 2002 AFRICAN PRODUCTS (Bellville – Western Cape) FOOD PROCESSING PLANT

INSTRUMENT TECHNICIAN (SHUTDOWN)

JANUARY TO JULY 2002 APOLLO (SASOL SYNTHETIC FUELS) TUBULAR OSMOSIS PLANT

(COMMISSIONING TECHNICIAN)

Construction of a Tubular Osmosis plant at Sasol in South Africa.

NOVEMBER-DECEMBER 2001 ORAPA DIAMOND MINES BOTSWANA (Grunewald’s

CONSTRUCTION)

INSTRUMENT TECHNICIAN Maintenance of mining equipment and instrumentation.

JULY TO AUGUST 2001 SHUTDOWN – SASOL 3 OXYGEN PLANT

Agency: JOMELE – SECUNDA (ASH PATAK)

Shutdown work on instrumentation

MARCH to JUNE 2001 SHUTDOWN ENGEN REFINERY DURBAN

Agency: NOAN – DURBAN (PAT O’ TOOLE)

Shutdown work on Instrumentation

FEBRUARY 2001 PRIDE CARLOS WALTER SEMI SUBMERSIBLE OIL RIG (Offshore).

Agency: (Noan Labour Hire)

Installation of cables, racking terminations and other electrical work on oil rig.

APRIL 2000 TO NOVEMBER 2000

Agency: (Noan Labour Hire)

INSTRUMENT TECHNICIAN MOSS GAS Offshore Oil Production Platform South Africa.

Construction of extension of production platform. Cable racks and cable installations. Terminations of JB’s.

FEBRUARY TO MARCH 2000: CALTEX REFINERY SHUTDOWN

INSTRUMENTATION WORK ON SHUTDOWN

DECEMBER 1999 PRIDE OF ANGOLA (DRILLSHIP)

Offshore Electrical Work

Electrical Work

NOVEMBER 1999: ENGEN REFINERY SHUTDOWN (DURBAN)

ENGEN REFINERY SHUTDOWN (DURBAN)

INSTRUMENTATION WORK ON SHUTDOWN

APRIL 1999 TO NOVEMBER 1999 Vacation in USA

JULY 1998 – FEBRUARY 1999: DEBSWANA DIAMOND MINE – GRÜNWALDS CONSTRUCTION

(INSTRUMENT QUALITY CONTROL INSPECTOR) Mining

Inspection of mining equipment and control systems installation. i.e. Conveyor belts, crushers, screens, dust suppression system, shoots, PLC’s, Profibus Systems, Racking, CCTV’s, Vault doors, sorting machines,etc.

JANUARY 25 – JULY 1998: SALDANHA STEEL PROJECT – BRAND ELECTRICAL

Steel Smelter SOUTH AFRICA SUPERVISOR (Mining)

Supervising the installation of cables from rack room (Multi-core/multi pair),Installation of field instrumentation and JB’s, cable racks and stands according specs and hook up.

MAY 1996 TO APRIL 1997

Employer: Murray & Roberts

PROJECT: INTERSHORE NORTH NDOLA & SOUTH SANHA OIL PRODUCTION PLATFORMS FOR CABINDA OIL FIELD.__ AMEC / MURRAY and ROBERTS/ DORBYL

SYSTEMS COMPLETIONS ENGINEER.

Construction of two Production Platforms in Durban South Africa Compiling System Handover Dossiers for 35 systems each. Define: System Limits by using the latest rev. of piping and instrument diagrams.

Define: Hydro-test pack limits. Work closely with discipline champions to timeously complete their test records for handing over the systems to Operations. Identified systems and subsystems, including process, utility and non-process systems.

Dec 1995 to April 1996

Employer: Caltex Oil Refinery (Cape Town) INSTALLATION AND COMMISSIONING

Project: Upgrading of Pneumatic Systems to Digital and Electronics. Revamping the complete control philosophy from pneumatic to electronic. Installed multi pair, multicore and secondary signal cables. Installed field instrumentation and commission control loops to DCS. Using Yokogawa control systems. Commissioning was mainly “Hot Cut Over”.(Live Plant conditions).

Sept 1995 to Nov 1995

Employer: Mining and Electronic services INSTALLATION AND COMMISSIONING ( Mining)

Project : Iscor In Newcastle South Africa. Steel manufacturing company. Installation and commissioning of instrumentation on small extension project.

July 1995 to August 1995

Employer : Sasol 2 South Africa INSTALLATION AND COMMISSIONING

Project : Instrumentation technician on small instrument projects. Calibration, fault-finding and commissioning of control valves and other field instruments.

October 1994 OVERHAUL AND COMMISSIONING

Project: Oil Rig FA Platform for Mossgas. Worked as instrument Technician on Shutdown

September 1994 OVERHAUL AND COMMISSIONING

Project: Sasol 2 shutdown. (Petrochemical plant). Worked as Instrument Technician.

Jan to April 1994 FAULTFINDING AND COMMISSIONING

Project: Caltex Oil Refinery. Daily instrument maintenance and fault finding of process instruments.

Feb 1993 to March 1993 OVERHAUL AND COMMISSIONING

Project : Caltex Oil Shutdown. Worked as Instrument Technician.

Sept. 1992 OVERHAUL AND COMMISSIONING

Project: Sasol 2 Shutdown. Worked as Instrument Technician.

Jan 1991 to Sept 1992 INSTALLATION AND COMMISSIONING

Project : Instrument Technician at Mobile Refinery Project. Installation and commissioning of Temperature loops. Calibration of valves. Commissioning of differential pressure transmitters mostly Yokogawa and Fuji for flow, pressure, level applications. DCS was Honeywell TDC 2000.

Jan 1990 to October 1990 INSTALLATION AND COMMISSIONING

Project: Mossgas Oil Refinery. Worked as Instrument Technician on the construction of a new oil from gas petrochemical facility on South African East Coast .

Jan 1989 to Nov 1989 FAULTFINDING AND COMMISSIONING

Mining

Project: Jwaneng Diamond Mine in Botswana. Instrument Technician on daily maintenance of control instruments.

Jan 1985 to Sept 1986 INSTALLATION AND COMMISSIONING

Project: Maintenance projects at Sasol 3.Addressed various upgrades at different plants. Worked from work packs and included installation of cables, instrumentation, tubing and its commission. This also including building the loop packs, QC your own work.

March 1984 to Sept 1984 FAULTFINDING AND COMMISSIONING

Project: Koinas Diamond Mine in South Africa. Position as maintenance Instrument Technician.

Jan 1980 to Des 1983 FAULTFINDING AND COMMISSIONING

Project: Sasol 2 Oil from Coal Plant. Maintenance of control instrumentation. Worked off daily job cards doing fault-finding as it arises. Worked closely with process operators to address process faults to obtain stable operating plant conditions. Unplugged impulse lines. Bleed lines to atmosphere. Fill lines with sealing liquid according data sheet. Zero checked D/P Transmitters. Stroke checked valves, and valve travel and compare with DCS. Troubleshooting faults to DCS via System, Marshalling and shutdown (ESD) cabinets. Intrinsic safe input/output barriers. Did risk assessment and completed own permit to work verified and approved by operations.

Personal Details:

Nationality: South African

Birth Date: 19/08/57

Contact: +277********* or +277******** (Mobile) 24 Hours / Whatsup

EMAIL: adnlhv@r.postjobfree.com

Education:

1. Vocational Training: Trade Test Certificate

2. NATIONAL TECHNICAL CERTIFICATE

3. 30years Construction, Maintenance and Documentation Experience.

4. Computer Literacy:

Microsoft Office i.e. Word and Excel,

Complete IT Win (PCS) __A Commissioning and Project Management System.__Flour/Exxon Mobil

Thule Completion System (TCS) __Royal Dutch Shell / Sakhalin Energy (SEIC).

Use of MAXIMO.

City of Departure: CAPE TOWN_