Post Job Free

Resume

Sign in

Plant and Piping Designer

Location:
Houston, TX, 77018
Posted:
July 06, 2021

Contact this candidate

Resume:

JORGE MILLAN

****W **th ST.HOUSTON, TX *****

TEL. (Mobile) 832-***-****, e-mail to:adnkn2@r.postjobfree.com

CAREER OBJECTIVE:

“To enhance my professional skills on asupervisor and/or technical position

with ahigh-growth company, where my proven management, design, and

technicalexperience can be utilized”.

I am wellqualified to make immediate contributions in:

Modeling and Drafting of: General Plant Layouts, Equipment Arrangements, Piping Arrangements, and Piping Isometric extraction. Planning Studies, FEED (Front End Engineering Design) Projects,Bids packages,Piping Material Specs,PipingProject Scheduling, Piping Checking,Site Walk Downs,Measurements and As-built drawings,Architectural Projects, and Spanish/English Translator.

On the following project/plant types: Petrochemical, Oil, Gas& Chemicals, Offshore Platforms,

Transformation, Manufacturing, Nuclear, and Commercial-Residential Buildings.

BRIEF SUMMARY OF QUALIFICATIONS:

Sr. S3D Plant & Piping Designer.Plant &Piping Checker.

Sr. PDS Plant &Piping designer.Plant &Piping Office-Job Site Coordinator.

PDMS Plant &Piping Designer.Piping andMechanical Draftsman.

ArchitecturalBuilding Designer.

EDUCATION:

GED: Houston Community College, Houston TX.

Smart Plant 3D (S3D) and SPR: Bechtel Oil & Chemicals Co. Houston, TX.

PDS Piping Modeling: MW Kellogg (KBR), Houston, TX.

PDMS Plant and Piping Design: Houston Community College, Houston, TX.

ESL: Universidad Nacional Autónoma de México, México City and HCC Houston, TX

Mechanical Engineering Courses: Universidad Nacional Autónoma de México, México City.

Mechanical and PipingDraftsman: Instituto Modelo, Mexico City.

SOFTWARE TRAINING:Smart Plant S3D,PDS,SPR,3D Laser Scanning Software, MicroStation,PDMS,

Pro-Pipe, Pro-Iso, DR(Design Review), Smart Plant, CMAT (Mat-Control), Omni-Pipe,Omni-Iso,AutoCAD, Cad Plus,Excel, PowerPoint, and Microsoft Word Software.

STATUS:American Citizen.

HASC Card, Houston Area Safety Council, Basic Plus & Dow Chemical, Seadrift TX and TWIC Card.

SUMARY OFPROFESSIONAL EXPERIENCE:

32 years as Plant and Piping Designer/Checker.

9 years as Architectural & MEP Building Designer on AutoCAD.

8 years on PDS.

3 years and 6 months on S3D (SP3D).

11 years and 9 months on AutoCAD.

8 years and 6 months making Site Walk Downs and measurements.

COMPANY, address,(date)

PROJECT,

Position and responsibility.

SRS Savannah River Site, Savannah River Nuclear Laboratory. Aiken SC (07/2018 to present)

Nuclear Laboratory Renovation and Expansion.

Sr. PDS / MicroStation Plant and Piping Designer/Checker.

Plot plan arrangements, equipment modeling/drafting, piping modeling/drafting, isometric

generation andchecking, Planning Studies, piping supports modeling/drafting, interferences

detection, StructuralSteel Modeling/drafting,HVAC and CHEX Duct Layouts design/drafting,

Site walk downs and measurements, SPR model review.

BECHTEL, OG&C CO. 3000 Post Oak Houston, TX (05/2018 to 06/2018).

APCILNG Project. Houston, TX.

Sr. S3D Plant and Piping Designer/Checker.

Plot plan arrangements, equipment modeling, piping modeling, isometric generation and

checking, Planning Studies, piping supports modeling, interferences detection, Structural

White Steel Modeling, SPR model review.

FREELANCE COMMERCIAL AND RESIDENTIAL DESIGNER(from 10/2016 to 04/2018).

ArchitecturalBuilding Designer and Project Coordinator.

AutoCAD MEP Designer of projects as Shopping Centers, commercial shops, restaurants, retail spaces, mobile home parks, manufacturing shops, mechanic shops, Day Care Buildings,

Storage Shops, Educational, etc. and residential buildings as single family, duplex, triplex, etc.

Site walk downs and measurements

Calculation and drafting in preparation of: Site Plans, Storm Drainage and Mitigation Plans, Water Distribution Plans, Piping Sewer Plans, Gas Distribution Plans, Paving Plans, Foundation Plans, Traffic Control Plans, Architectural Plans, Structural Plans, AC Mechanical Plans, Electrical Plans, Plumbing Plans, Equipment Layout Plans, Piping Plans,

Storm Water Prevention Pollution Plans.

M Intelligent Design LLC, 11500 Northwest Fwy. Houston, TX (from 01/2016 to09/2016).

Architectural Building Designer and Project Coordinator.

AutoCADMEP Designer of projects as ShoppingCenters, commercial shops, restaurants,

retail spaces,mobile home parks, manufacturing shops, mechanic shops, Day Care Buildings,

Storage Shops, Educational, etc. and residential buildings as single family, duplex, triplex, etc.

Site walk downs and measurements

Calculation and drafting in preparation of: Site Plans, Storm Drainage and Mitigation Plans, Water Distribution Plans, Piping Sewer Plans, Gas Distribution Plans,Paving Plans, Foundation Plans, Traffic Control Plans, Architectural Plans, Structural Plans, AC Mechanical Plans, Electrical Plans, Plumbing Plans, Equipment Layout Plans, Piping Plans,

Storm Water Prevention Pollution Plans.

BECHTEL, OG&C CO. (G.A.S.U.)3000 Post Oak Houston, TX (07/2015 to 11/2015).

BP TRINIDAD & TOBAGO LLC, (FEED)Trinidad Onshore Compression Project.

Sr. PDS Plant and Piping Designer/Checker.

CORPUS CHRISTI LIQUEFACTION LNG PROJECT. Corpus Christi, TX.

Sr.S3D Plant and Piping Designer/Checker.

Plot plan arrangements, equipment modeling, piping modeling, isometric generation and

checking, Planning Studies, piping supports modeling, interferences detection, Structural

WhiteSteel Modeling,SPR model review.

AMEC FOSTER WHEELER CO.(YEZAC T. S.) 585 N Dairy Ashford, Houston, TX (from 09/2014 to 05/2015).

VALERO ENERGY CO.ST. CHARLES REFINERY, METHANOL UNIT.(FEED).

Sr. PDS Plant and Piping Designer. Area Leader: Responsible of Gas Compression Area.

DOW CHEMICAL, POLYETHYLENE PLANT, Seadrift TX.

Sr. PDS Plant and Piping Designer. Area Leader: Responsible of Pelletizing Area:

Plot plan arrangements, equipment modeling, piping modeling, isometric generation and

checking,Planning Studies, piping supports modeling, interferences detection, structural

WhiteSteel Modeling,SPRmodel review, 3D Laser Scanning Software, Site walk downs and

measurements.

BECHTEL, OG&C CO. (TALASCEND)3000 Post Oak Houston, TX (from 06/2011 to 08/2014).

MOZAMBIQUE LNG MILESTONES DEVELOPMENT (FEED), Anadarko Petroleum Co.

Sr. S3D Plant and Piping Designer. Area Leader: Responsible of Pipe Rack area.

WHEATSTONE LNG PLANT Liquefied Natural Gas, Ashburton, Australia.

Sr. S3D Plant and Piping Designer/Checker. Area Leader: Responsible ofDebutanizer Area

and Methane Cold Box and Pipe Rack:

Plot plan arrangements, equipment modeling, piping modeling, isometric generation and

checking,Planning Studies, piping supports modeling, interferences detection, Structural

WhiteSteelModeling,SPRmodel review.

M Intelligent Design LLC, 11500 NorthwestFreeway. Houston, TX (from 05/2010 to05/2011).

AutoCADArchitectural Building Designer and Project Coordinator.

BECHTEL, OG&CCO. (EPC GLOBAL) 3000 Post Oak Houston, TX (from 01/2007 to 05/2010).

ANGOLA LNG PROJECT, natural gas liquefaction, Soyo, Angola.

Sr. PDS Plant and Piping Designer. Area Leader: Responsible of Cold Box Area.

CEP Crude Expansion Project, Port Arthur Refinery, Port Arthur, TX.

Sr.PDSPlant and Piping Designer. Area Leader: Responsible ofSulphur Recovery Area& Pipe Rack area:Plot plan arrangements, equipment modeling, Piping modeling, isometric

generation, Pipingsupportsmodeling, interferences detection, Smart Plan design review,

piping planning studies, and equipment, nozzles and piping reports.

M Intelligent Design LLC, 11500 Northwest Fwy. Houston (from 04/2002to 12/2006).

Architectural Building Designer and Project Coordinator, Responsible of:

Residential and Commercial architectural planning and design; included:

development, architectural, structural, electrical, A/C mechanical &plumbing plans,

constructionbuilding permits, job site supervisor, Site walk downs and measurements.

CENTRAL ARCHITECTURAL STONE CO. Houston, TX (from 02/2001 to 03/2002).

AutoCADArchitectural Designer and Project Coordinator. Responsible of:

Architectural projects, estimates, support to construction, Supervision of Manufacturing

and installation of cast stone, and cultured stone. Site walk downs and measurements.

TEXAS STEEL CONVERSION CO. Houston, TX(from 08/1999 to01/2001).

API Piping QC inspector.

KBR, Houston, TX –Tamp, Mexico, (from 12/1995 to 07/1999).

PECTEN POLYESTER MANUFACTURAS PROJECT. Altamira, Tamps. México.

Sr. PDS Plant and Piping Designer. Area Leader, Design Review and site Coordinator,

Site walk downs andmeasurements.

BUFETE INDUSTRIAL DISEÑOS Y PROYECTOS S.A.MéxicoCity (from08/87 to11/1995).

POLYPROPYLENE UNIT (EXXON), Baton Rouge LA.

MEXICANA DE COBRE, S.A. DE C.V, Gold and silver refinery, Nacozari Sonora, México.

Offshore Platform ABK-D, POL-A and 36” subsea oil-gas piping PEMEX, Cd. Carmen, México.

PEMEX Fractionator Plant, Nuevo PEMEX, Tabasco, México.(FEED).

PEMEX Drilling Platforms, Cd. Del Carmen, Campeche, México.

PEMEX CCR Refinery Plant, Salina Cruz Oaxaca, México. (FEED & PROJECT)

CELANESE MEXICANA,Acrylic Acid Plant, Cangrejera, Ver. México.

COMISION FEDERAL DE ELECTRICIDAD, Steam Power Plant II, Coahuila, México.

CELANESE MEXICANA,Cooling Tower and Fire Prevention Systems.Cangrejera, Veracruz, México.

POLIMEROS, Polymer Plant, Tlaxcala, Puebla. México.

PEMEX,Gas Sweetening Offshore Platform. Tampico, Tamaulipas, México.(FEED& PROJECT).

DUPONT,Lead Tetraethyl Expansión Plant, Pajaritos, Ver. México.

DUPONT, Paint ExpansionPlant, Naucalpan, Estado de México.

DUPONT, Halocarbon Expansion Plant, Ecatepec, Estado de México.

REMIMEX DUPONT, Sodium Cyanide Plant. Puebla, Puebla, México.(FEED & PROJECT).

Sr. Plant and Piping Designer. Area Leader, Piping Checker, Model Review and site Coordinator, Site walk downs andmeasurements.

ULTRA INGENIERIA S.C.México, City (from 11/1985 to 07/1987).

NUCLEAR-ELECTRICAL PLANT,Comisión Federal De Electricidad, Laguna Verde,México.

Job leader, Plant and Piping designer, Plan Checker, and Site Coordinator,

Site walk downs andmeasurements.

FOSTER WHEELER S.A. Mexico, City (from 01/1985 to 10/1985)

FERTIMEX SA,Fertilizer Production Plant. Puebla, Mexico.

Plant and Piping Designer. Area Leader,Site walk downs andmeasurements.

PROYECTOS MARINOS SA de CV. México, City (from07/1980 to 12/1984).

PEMEX, Offshore Platforms, Campeche Bay, México.

PEMEX,Subsea Piping for Interconnecting Platforms Campeche Bay, México.

PEMEX, Water Recovery and Injection. Comalcalco, Tabasco México.(FEED & PROJECT).

Plant and Piping Designer.

PULLMAN SWINDELL MEXICANA SA. Mexico, City (from 10/1979 to 06/1980).

EUZCADY, Tile Plant. La Presa, Estado de México.

EUZCADY, Rubber Belt Plant. La Presa, Estado de México.

HILSA, Blast Furnace. Monterrey N. L. México.

HILSA, Blast Furnace Cooling System. Puebla, Puebla, México.

Plant and Piping Designer, Site walk downs andmeasurements.

ICSA, Glass Plant.Mexico City, (from 01/1978 to9/1979).

Plant, Piping and Mechanical Draftsman, Site walk downs andmeasurements.



Contact this candidate