Abdelkader Chehboub

Abu Dhabi- +971*********- adnkc0@r.postjobfree.com

Whatsapp+971*********/+971*********)

Thirty years’ experience in supporting the plant operations (Engineering and Project Management/execution/Construction) and out of battery limit wellhead,

interconnexion pipeline systems thru engineering & construction with sound knowledge of international codes, standards (ASTM, API, ASME, TEMA,, ANSI, NFPA, NACE, BS, NF, DIN, ISO, NFPA,OHSAS, HACCP etc.

Hands on experience in developing standard specifications required for designing rotating equipment with sound knowledge of providing technical application support.

strategy development, strategic transformations, capability led transformations, strategy implementation, corporate governance,

Engineering of plants for Natural Gas treatment and liquefaction (dehydration and sweetening, NGL recovery, compression and reinjection units, gathering and treatment of oil and gas from wells, LNG production, mechanical drive and power generation, drainage systems), refinery, chemical, petrochemical, desalination plants (combined cycle and RO), Water and Waste Water treatment.

QHSE risk assessment

Evaluate the risks as to likelihood and consequences, Assess the options for accommodating the risks, Prioritize the risk management efforts

Design/maintenance, turnaround and sustainability technical adjustments for LNG, LPG, Refinery, Fertilizer, Power generation, pipeline, upstream, tank farms and offshore facilities.

Utilization of planning method like critical path and critical chain.

Develop PEP (level 5 project complexity)

Segregating the cost to each cost account in the cost breakdown structure for establishment of the cost control report.

Establish and produce progress and cost control report over site activities.

Risk based work selection matrix implementation

Design and Implementation of Turn around (annual shutdown) planning system in primavera project planner.

Managing of the mechanical manpower for the area & assigning specific responsibilities according to their experiences and skills.

Maintain & Repair Mechanical equipment (Rotary equipment such as Pumps, Gearboxes and Valves). (Maintenance), Design and develop engineering components

Give day to day technical support for breakdown diagnostics & repair, including risk and failure analysis.

Improve & update the maintenance (preventive & predictive) program regularly. Identify, update & continuously improve equipment reliability.

Identify, select & update the required spare part list.

Check & approve Specifications, Data Sheets, and TBT for Approved Material requisition for rotating equipment & monitor delivery from MFR to site. Participation in tests including FAT at vendors’ premises.

Participation in tests including FAT at vendors’ premises.

Assist/Advise HAZOP, 3D Model & Adequacy studies.

Participation in mechanical completion, pre-commissioning and on-the-site commissioning activities

Employment Detailed History

Project Manager ALASAB ; ADNOC EPC CONTRACTOR. UAE 19/12/2019 to date

(Buhasa EPC Wellhead Remote Monitoring and Control and Construction of Oil Network Over Pressure Protection 206 wells)

Manage Implementation "Over Pressure Protection" for all natural Oil Producing wells in BUHASA and Huwaila fields where the WHCIP exceeds the oil network design pressure of 1400 psig so that Existing Inadequate over pressure protections are replaced with proper HIPPS, Qualitative Risk Assessment of "HIGH RISK" state of the current facilities is brought within manageable & acceptable risks, and maintain normal & safe operation of wells where WHCIP >1400psig.

Wellhead Remote Monitoring and Control Implementation to improve hydrocarbon recovery, improve production availability as well as improving the HSE in terms of reducing the exposure.

exposure to the hazardous locations through the following measures:

A. Improve Hydrocarbon Recovery by:

• Improving reservoir management.

• Increasing information and understanding of the performance of secondary and

tertiary recovery projects, (e.g. Water injection/WAG).

B. Improve Production Availability by:

• Receiving immediate alarms from tripped and underperforming wells and therefore

allows quick remedial action to be taken.

• Well rates monitoring and optimization by control room through remote actuated

chokes at wellheads.

Technical Director Bodlez/Dewco International. Algeria / France 01/07/2015 to 01/12/2019

Manage multiple engineering projects in the field of oil & gas industries (in upstream: onshore, downstream ) LNG, LPG terminals and power plants

Support the operations and engineering services in Plants / profit centers. involved in investments (expansion and brown/green field), upgrades of existing assets, evaluations of operations and maintenance. integrate and develop the existing expertise, set the safety and operating standards, Manage development of guidelines for maintenance and integrity management, manage risks, build specifications, develop and review conceptual design, analyze, review and approve budgets, lead the development of initiatives in the operational field (training, procedures, audits, etc.)

Fire pumping systems, sprinklers and Co2 mitigation for Shelter in place emergency

Terminal LPG BOG compressors

Frame 5 Steam turbines LNG refurbishment

Nox, Sox, CO2 reductions and combustion optimization

CO2 compressor station vibrations mitigation

Pyrolysis implementation for incinerators

Microwave De-polymerization and environmental releases.

HEPA & ULPA filters for CCR aseptic environment

HVAC for cleanroom to conform to ISO 14644

Cleanroom Transition design ISO 8 thru ISO 5 with Temperature and Moisture Control to achieve 240–360 air changes per hour.

Water pumping station design/installation

LNG pumping system renovation

Gas turbine power generation revamp including HRSG

Lab design, airflow patterns and near zero vacuum

Projects Engineer/Manager(Manager/Matrix organization) Qatargas 26/05/12 to 01/06/2015

Manage multiple projects/troubleshooting in the field of oil & gas industries (in upstream: offshore & onshore, downstream ) LNG, LPG plants(details on exposure: refer last page). Responsibilities include, but are not limited to:

Qatar Petroleum Heavy Fuel Oil terminal project

QG2 dry flare replacement 28FL 0805/06

High pressure instrument tubing for offshore NFD, Passive protection ESDVS for offshore NFB

Offshore black start power plant

Waste water treatment plant

Power bridging(portable aero derivative turbines)

QG1 incinerators F0907refurbishment

Service and Instrument air compressor station

Plant Maintenance projects support (as required)

Design and Implementation of Turnaround (annual shutdown) planning system project planner in line with SAP plans.

Managing of the mechanical manpower for the area & assigning specific responsibilities according to their experiences and skills.

Assist Plant to maintain & Repair Mechanical equipment (Rotary equipment such as Pumps, Gearboxes and Valves). Design and develop engineering components

Give day to day technical support for breakdown diagnostics & repair, including risk and failure analysis.

Improve & update the maintenance (preventive & predictive) program regularly. Identify, update & continuously improve equipment reliability.

Identify, select & update the required spare part list.

Head of Engineering Projects

M/s FQS Consultants (Gaz de France: LNG Terminal Fos sur Mer ) 01/2010 to 2012

Manage multiple projects/troubleshooting in the field of oil & gas industries (in upstream: offshore & onshore, downstream ) LNG, LPG plants. Responsibilities include, but are not limited to:

Preparation(as required)of data sheets / specifications, finalize sizing, layout, estimate capacity and power requirement for rotating equipment & systems involving rotating equipment,

Preparation (as required) of data sheets / specifications, finalize sizing, layout, estimate capacity for static equipment & systems involving piping and accessories,

Coordination of technical activities on assigned projects (supervision of fabricators and other sub-contractors, project planning/scheduling)

Coordination and implementation of LNG and LPG plant modification/upgrade jobs in accordance with applicable codes and good engineering practices

Effective and smooth flow of communication/coordination between all disciplines and all other project stakeholders

Evaluate threats, identify risks owners, manage successful criteria at every project phase

Construction management, document management, conflict management

Reporting to Management, steering committee, tender committee

Support troubleshooting & new studies at LNG & LPG plants, BOG systems, loading arms

Maintain LNG, LPG, crude oil tanks

Online LNG tank repairs

Cross reversal machinery alignment

Troubleshoot EBARA LNG pumps

Upgrade pumps, compressors, mechanical seals (API plan) problems

Turbo expanders (Mafitrench US)

MHE bundle support modification

Lead Project (Mechanica)l Engineer QAFCO, Qatar 10/2005 to 12/2009

Engineering, procurement construction & commissioning activities including but not restricted to:

Prepare Design Basis & specifications for Rotating Equipment to be included in Bid document.

Verify the design integrity of work carried out by engineering contractors to ensure that the proposed solutions are technically sound and meet reliability, operability and maintainability requirements.

Comment on EPC contractor deliverables during detail engineering (Data sheets, Specifications, P&ID’s, etc.) & monitor the Preparation of RFQ Technical (and commercial) bid evaluations of rotating equipment (pumps, compressors, etc.).

Coordination with and supervision of Stakeholders

Guidance to and review of work done by Engineers with respect to HSE codes, standards and good practices

Fertilizer Sustainability leader: (~500 MUSD per year)

Co-Gen unit for QAFCO 5 integration (Technip, France & Technip UAE)

Desalination Plant 7 (SIDEM, Paris, France), QAFCO Urea anti caking system (RKR, Hanover, Germany), QAFCO 2 CO2 removal system (Godrej, Bombay, India)

QAFCO 1 compressor house intercoolers,(DKG EAST, Budapest, Hungary)

Urea 2 revamp : CO2 stripping system,(Stamicarbon: Netherlands)

Other Online & Shut down Projects( Primary reformer revamp, ammonia converter revamp, New PG cooler, Syngas. loop cooler, Urea 2 revamp, new strippers, New CO2 compressor(240bars), New 180T/h auxiliary boiler, Waste heat boilers, ammonia pumps, Installation/Decommissioning of Ammonia tanks, Reactors, Plate/Shell & tube heat exchangers. HVAC, Separators, filters,

Troubleshoot/maintain Urea granulation units(conveyors, screens, motors, instrumentation and controls) and prill towers.

Environmental Projects as Project Manager

New H2S Removal Plant ( 84 MUSD)(CB&I, Houston Texas - Sundyne, Denver, Colorado- CPC, Toronto, Canada-

SCR, Nox reduction(<55 mg/l) Project using urea, HRSG (Steuler, Frankfort, Germany)

SNCR, Nox reduction (<55 mg/l) Project (Hamworthy, UK), Nox reduction Project using Aqueous Ammonia(YARA, Brussels)

Conduct, Elaborate/Review/ approve, Plot plan, Unit layout, Equipment layout (including Hazop), drawings

Elaborate/Review Safety and environment risk assessment, identify the threats of the project, update risk register, control the risk

Manage, enquiry/purchase requisition, bid evaluation and finalization of TQ / TBA

Review of Vendor's qualifications / documents, Manage of Manhour estimate change orders ;

Conduct regular meetings with staff & contractors, material inspection, FAT, SAT

Supervise Operations in trouble shooting plant (project) problem recommending optimal corrective measures.

Ensure that the work permit is signed in accordance with the SJA and all the safeguards are effectively applied to maintain the “0” accident KPI. Accordingly ensure that daily work assignments, control/signature of work permits, material requisitions are in compliance with company instructions & procedures.

Elaborate/review Method statement, Safety Job Analysis and implement the corrective actions

Conduct /audit toolbox meeting, Audit the medium risk projects at all phases (Scope of work/Contract against FIDIC and PMI codes of ethics and professional conduct, Feed, Basic& Detail engineering, procurement and construction.

Senior/Lead Mechanical Engineer(rotating/static/piping), Engineering, Engineers India Ltd/ Sonatrach Arzew-Algeria, 01/1991 To 10/2005

Preparation / reviews of design work concerned with multi-disciplinary projects, Inspection, modifications and alternations to existing systems, or the installation of new equipments and systems. Studies and analysis of complex or recurring problems relating to process, utilities, storage and other systems, and recommend appropriate solutions.

Works with other specialist discipline engineers in the maintenance and updating of engineering drawings, standards, specifications, manuals, and data books. Providing expert technical advice to management and other departments/divisions as required.

Maintain and update list of suppliers for equipment/materials to assist the customers

Review and /or update of Vendor list proposed by bidders based on Proven Track Records).

Progress Monitoring (for MR & PR PO) Reporting, Coordination of procurement activities relating to pre-qualification of bidders.

Obtaining Drawings/documents, manufacturing schedule and bar chart from supplier, Coordinate with all groups, review, supplement the inputs to EPC tenders, feasibility reports/ study reports and finalize the same

Assistance in trouble-shooting to LNG & LPG plants and reliability, maintenance, inspection, testing procurement, installation, supervision of static /rotating equipments and piping with background of the controls, constraints, and limits applied to systems to ensure safe operation while maximizing equipment output and potential capacity.

Feasibility Studies of various options pertaining to Rotating /Static Equipments & Piping including controls related to plant modifications. Analysis of existing or proposed process, utilities, storage and other support systems for the offshore production facilities, onshore plant and infrastructures.

Review/update capital spares database(SAP) for rotating equipment and other critical items to secure that optimum levels are maintained and to liaise with supply department for orders replacement as per 5-year business plan.

Review nozzle load analysis against API, Finite Element Analysis (FEA), combustion studies

Engineering, procurement and installation of Rotating Equipment for LPG & LNG Plants. Sound knowledge of international codes and standards

LNG Plants (Senior/Rotating Equipment engineer)

●Project: .4.5 MMt/y LNG train along with associated LPG and condensate. Gas turbine driven LNG Mega train-SKIKDA-ALGERIA.

●Revamp Projects(APCI): LNG1 & LNG2 with Bechtel & Kellogg (Each plant capacity is: 10 billion m3 of natural gas treated and liquefied per year): upgrade steam header, install 400t/h steam boiler, upgrade steam turbine (including centrifuge), install new seawater pumps, seawater intake suction lines, plate exchangers, change the JT valve with expander generator (12 MW)

●GASSI TOUIL/ARZEW Integrated LNG project (2003-2006) REPSOL: a standard production-sharing. It provides for development: the drilling of 52 development wells, the recovery of 16 existing wells, construction of surface facilities for treating (extraction of condensate and LPG, decarburization) 22 million m3/day of raw gas, the construction of new transmission capacity of 6.5 billion of m3/year gas sales, building a new plant liquefaction of a nominal capacity of 04 MT/ year extendible to 8 MT/ year.

Refinery : (Senior / mechanical engineer)

●Topping condensate-Refinery –Project (Skikda/Algeria(2003-2005) Sonatrcah/Saipem: this project to allow the recovery of condensate through the production of finished products, including butane, naphtha and distillates (JET A1, light diesel and heavy oil) to mix with distillate produced by the refinery of Skikda RA1K. Improve the quality of distillates (diesel & kerosene) produced by the refinery

Adrar Oil Refinery Project, Algeria (2001-2004) Soralchin: a $350m refinery near the town of Adrar, 1,500 km south-west of Algiers, to process 600,000 t/y of crude oil and produce 20,500 t/y of propane and 323,000 t/y of butane. This is a grass root refinery involving conventional process units. The Equipment involved are Gas / Steam Turbines, Hydraulic Power Recovery Turbines, Centrifugal Compressors, Reciprocating Compressors, fans blowers, Diesel Engines, Centrifugal Pumps

Compressor/Power /Pumping Stations(Senior/mechanical engineer)

●Desalination plant (BLACK & VEATCH/SONATRACH/SONELGAZ) Arzew Algeria(1999-2005): combined cycle (Electricity/Water)delivering 90000m3/day and upto 330 MW to the national grid

●CUVILLY & PITGAM COMPRESSOR GAS STATION, FRANCE for Norwich group of North sea pipeline up to FOS SUR MER Terminal – (GDF / STATOIL)(1994-1995).

●LPG Project, (KANAGHAZ/SONATRACH) IN Amenas, Algeria (1991-1992): 42” cross-field LPG pipeline and pumping station project of Algeria (Sahara desert under ~50 C).

●Water re-injection Project (KANAGHAZ/SONATRACH) ALRAR, Algeria (1992-1993): The major equipment handled are piping, vertical and horizontal centrifugal Water Injection Pumps.

Hands on experience:

(Only some equipment are listed below )

Rotating Equipment: (design and maintenance)

Gas turbines(GE frame 5, 6, 7EA, &F & 9) ( API 616),

ELLIOT Centrifugal Compressors (Multi Component Refrigerant (-35 C) (API 617),

DRESSER Propane Centrifugal Compressor (-35 C)(30MW)(API 617),

Fuel gas Centrifugal compressor (-34 C) (30MW) (API 617), Steam turbines(GE)(API 612),

Rotary Compressors (INGERSOLL-RAND Screw type (Helium application)),

Natural Gas Regeneration Reciprocating Compressors (Burton Corblin 40 bar) (API 618),

Packaged Integrally Geared Centrifugal air compressor (1MW) (API 672),

ROTOFLOW Expander Compressors (API 617), ID/FD fans (API 673),

Multistage Centrifugal Pumps (up to 4MW) (API 610), Sealless Pumps (API 685)

Positive Displacement Pumps -Rotary(API 676)

Positive Displacement reciprocating Pumps -Rotary(API 674)

Diesel Engines & Diesel Power Generating Sets (up to 2MW) (ISO Std 8528) etc.

EOT cranes,

Modify seal plans as per operations change requirement

Static Equipment: (As Static Equipment Engineer for 2 years)

Main LNG Exchanger(M CR/LNG, temp -69 to -152 C)(TEMA, ASME SEC VIII),

Heat Exchangers, Chillers, Columns, LNG & LPG tanks(API 620/BS 7777),

Carbon Dioxide Removal systems(4 bars/38 ),

Dryers (6 bars/118 ), Boilers. (MHI & ABB 400 T/h)(ASME SEC I)

Reformers, reactors, waste heat/auxiliary boilers, Regenerators, Reboilers., accumulators, HVAC systems(, cleanroomspositive & Negative pressure), material handling

Piping:

Elaboration of Piping Material Specification (PMS)and Valves Material Specification(VMS)

Preparation of Design Basis & Technical Requirements / Review of PDS and P&IDs / Technical

Evaluation of Bids / Vendor Drawing / Data Review Approval of Purchase

Specifications/Preparation of PR / Defining Contractor’s Scope of supply & work .

Calculate flexibility of pipes (stress calculation) / Site plans, plot plans and layouts / Piping general and piping material specifications/Insulation, fittings.

Education:

Mechanical Engineering Degree (Energy): University Of Technology Algeria 1991

Master Degree(Energy): WES Toronto, Canada 2010

Doctorate Researcher Tribology/Tornados California University/Algeria 2014-2022

Language skills: English: Fluent/ French: Fluent/ Arabic: Native

Professional Development/Membership Institutions:

· H2S training, Qatargas 2015

· IIF(Incident Injury Free) training, Qatargas 2015

· Confined Space & Hole Watcher training, Qatargas 2015

· PTW(Permit to Work) training, Qatargas 2015

· Defensive Driving training, Qatargas 2015

APMP Certified Project Management, APM 2014

· Project Management Certification Workshop,Shell, APM accredited 2014

· Integrated (IPMS)Project Management System, Qatargas 2014

· Qatargas Management System, Qatargas 2014

· Project Management(Essentials), Shell 2014

· Project Management(Planning, Cost &Controls), Exxon Mobil 2014

Risk management, Explosive mill powders & prills, UHDE fertilizers 2014

· HVAC Cleanroom Design/Management, Mecart, Canada 2014

HACCP Gate stage Management, TUV 2014

· ISO 14644 Environment Management, TUV 2014

· Risk management & Project Control System (maintenance support) 2008

· ISO 14001:2004 Environment Management Awareness course, TUV 2006

· Internal auditor (ISO 9000-2004) QCM 2004

Software: CMMS, ERP, PeopleSoft, SAP, AutoCAD, PDMS/PDS, Microstation, Idhamer, Triflex, Cesar II, PVelite, Delphi, Fisher, HVAC simscale, Chemshare, Hisys, Msoffice, Msproject, Primavera