Post Job Free

Resume

Sign in

Sr. Land Surveyor Site Coordinator

Location:
Manama, Capital, Bahrain
Posted:
July 07, 2021

Contact this candidate

Resume:

RESUME

OF

CARLOS M. JUGUILON

Position Applied : Sr. Site Supervisor / any position that fits to my experience.

Address : Block 5,Lot 65,Phase B,Francisco Homes,Barangay Mulawin,San Jose Del Monte City,

Bulacan, Philippines.

Date of Birth: 18 December 1956

Email Address : adnk1d@r.postjobfree.com

Contact No.+639*********

Educational attainment:

Bachelor of Science in Civil engineering /Associate in Geodetic Engineering

Cordillera University (Formerly Baguio Colleges Foundation)

Year : 1975 – 1980

Address : Baguio City, Philippines

Summary :

Basically I have more than 35 years of practical experience in the field of civil engineering

works, involved in surveying, structural supervision and architectural finishing works .

Handled various projects like high-rise building, marine construction,highways, rail transportation

project, tunneling ( TBM ) & micro-tunneling, infrastructure project & other land developments.

Familiar in surveying instrument, Autocad Civil 3D Land Desktop Companion 2009 and Autocad Civil 3D

2016.Also attended a seminar for Conquas & Quality Mark (Q.M.), 7th edition conducted by Building Construction Authority of Singapore . Have actual site experience in Conquas 21 & Quality Mark.

WORK HISTORY

20 July 2012 to 19 July 2021

Project: Northeast Muharraq Trunk Sewer (NETS)

Position Held / Company : Lead Surveyor – Al Hassanain Co. B. S.C. cc – Bahrain.

Duties and responsibilities

Assisted and supervised site surveyors in day to day site activities .

Coordinated w/ site staff for their daily survey request .

Prepared survey data for setting out alignment & levels.

Prepared survey reports prior to site inspection.

Prepared survey data for as built reports.

Attended site inspection w/ consultant & QA / QC.

Liased w/ consultant & main contractor & site staff in day to day site activities.

Attended internal coordination meeting.

Project : Um Al Houl IWPP Power Plant ( Inlet & Outfall Pipeline )

Position Held / Company : Survey Section Head – Al Hassanain Co. B. S. C. cc -Bahrain

Duties and Responsibilities

Assisted & supervised site surveyors in day to day site operation.

Prepared survey data for setting out of alignment and levels.

Prepared survey reports prior to site inspection.

Prepared survey report for weekly & monthly progress reports.

Attended site work inspection w/ consultant and QA/QC.

Liased w/ consultant, main contractor and site staff in day to day site operation.

Attended internal coordination meeting.

Project : East Sitra Housing Project ( 5.6 kms. Flushing Channel Excavation).

Position Held / Company : Sr. Land Surveyor – Al Hassanain Co. B.S. C. cc – Bahrain.

Duties and Responsibilities

Provided as built and topographic survey data.

Provided the alignment and excavation level of the channel.

Checked and monitored the on going channel excavation .

Attended site work inspection .

Liased w/ consultant surveyor for everyday site operation.

Established horizontal & vertical control.

Liased w/ site staff in day to day site operation.

Prepared survey computation.

Project : Land Development, Trimming of Artificial Mountain, Construction of

Temporary road & concrete protection of electrical cable.

Position Held / Company : Site Engineer – Al Hassanain Co. B. S. C. cc – Bahrain.

Duties and Responsibilities

Supervision of work activities on site.

Reported and coordinated to my Project Manager in day to day operation.

Liased w/ consultant prior to site work inspection.

Submit daily progress report to the Project Manager.

Implemented the approved shop drawing and see to it that in conformity w/ the Standard Specification.

Liased w/ Safety Officer for safety matters .

18 June 2007 to 08 March 2009

Project : Proposed Residential Development w/ commercial shop front @

1 Shenton Way (43 & 50 storey ) .

Position Held / Company : Sr. Land Surveyor cum Site Supervisor – Hyundai

Engineering & Const. Co. Ltd.- Singapore.

Duties and Responsibilities

Set out building main grid lines, reference level both in structural & architectural works.

Provided box out opening on the floor slab for verticality of building and for marking of subsequent floor using LASER VERTICAL PLUMMET instrument.

Monitored and checked excavation during the pile capping activities.

Provided the as built pile eccentricity.

Executed the daily settlement monitoring level.

Provided blinding or lean concrete level, pile cap location,casting level and alignment of

column starter bar.

Supervised the shuttering, rebar and concreting activities.

Arranged rebar inspection prior to concreting.

Prepared units for CONQUAS and QUALITY MARK inspection.

Coordination w/ other trades and Consultant.

01 August 2005 to 30 June 2007

Project : Proposed 36 – Storey Executive Condominium(Cosmopolitan).

Position Held / Company : Land Surveyor- Poh Lian Construction Pte. Ltd.- Singapore.

Duties and Responsibilities

Set out main building grid lines, reference level both in structural & architectural works.

Provided box opening on the floor slab for verticality of building and for marking of

subsequent floor using LASER VERTICAL PLUMMET instrument.

Monitored and checked excavation during the pile capping activities.

Provided as built pile eccentricity.

Executed the daily settlement monitoring level.

Provided blinding or lean concrete level, pile cap location, casting level and alignment

of column starter bar.

Coordination w/ other trades and Consultant

May 2003 to 19 July 2005

Project : Proposed 5 - Blocks, 4-Storey Gleen Trees Executive Condominium.

Position Held / Company : Land Surveyor cum Architectural Foreman –

Nakano Singapore Pte. Ltd. – Singapore.

Duties and Responsibilities

Set out main building grid lines, reference level both in structural and architectural works.

Provided and checked excavation during the pile capping activities.

Provided as built pile eccentricity.

Provided blinding or lean concrete level, pile cap location,casting level & alignment of column starter bar.

Supervised the sub - Contractor for finishing activities.

Prepared condo. units prior to Conquas & Quality Mark inspection.

Arranged Building Construction Authority Inspector for Quality Mark Inspection.

Coordination w/ other trades and Consultant.

January 2003 to 25 May 2003

Project : 1.7 Kilometers Senoko Transmission Line Tunneling ( TBM ).

Position Held / Company : Tunnel Surveyor – Wisescan Engineering Services.- Sigapore.

Duties and Responsibilities

Provided the alignment and level of Tunnel Boring Machine (T B M ).

Executed surface settlement monitoring survey .

Executed as built survey of TBM actual location (in case of break-down ) .

Provided as built survey for the completed precast erected.

25 June to 16 December 2002

Project : Proposed Executive Condominium @ EC -4 Lilydale.

Position Held / Company : Land Surveyor – D. B. Corporation Industries Pte. Ltd.- Singapore.

Duties & Responsibilities

Set out building main grid lines, reference level both in structural and architectural works .

Monitored and checked excavation during the pile capping activities.

Provided as built for pile eccentricity.

Provided blinding or lean concrete level and marked pile cap location,casting level and alignment of column starter bar.

Executed daily settlement monitoring .

Executed as built survey of finished structure.

24 August 2000 to February 2002

Project : Proposed 32- Storey Maybank Headquarters Building and 24-Storey

Parkview Office Tower.

Position Held / Company : Sr. Site Coordinator- Permasteelisa Pacific Holdings Ltd.

Singapore.

Duties and Responsibilities

Assisted the Sr. Project Manager in day to day operation.

Supervised site crew and curtain wall installation.

Liased w/ Consultant prior to site work inspection.

Ensured and maintained the quality of workmanship such as grid marking, bracket anchoring

panel handling and erection.

Coordinated w/ our Company supplier.

Coordinated w/ our Company for the delivery of scheduled panel, etc.

08 August 2000 to 16 December 2001

Project : Proposed 69- Storey Posbank Capital Tower Headquarters Building.

Position Held / Company : Site Engineer (Architectural )-Ssangyong Engineering

& Construction Co. Ltd.- Singapore.

Duties & Responsibilities

Assisted the Project Manager in day to day operation.

Coordinated and liased w/ the sub – Contractor w/ their daily activities of panel installation.

Attended site work inspection w/ sub – Contractor & Consultant.

Checked on site the installed panel if they maintained standard quality of works.

Checked also the Approved Method of Statement of installation by sub – Contractor.

Liased w/ Consultant prior to the scheduling of work inspection.

Submitted the daily progress reports to Sr. Engineer.

16 February to 05 March 1999

Project : Singapore Kranji Racecourse

Position Held / Company : Civil Supervisor – C. & S. Construction Pte. Ltd.

Singapore.

Duties & Responsibilities

Supervised the work activities in Horse & Service Tunnel such as:

1.Excavation

2.Shuttering & Rebar works

3.Concreting

4.Attending Inspection

5.Liased w/ Main Contractor

6.And submit daily progress and monthly progress to the Sr. Engineer.

16 February 1997 to 15 February 1998

Project : Singapore Kranji Racecourse

Position Held / Company : Land Surveyor cum Site Supervisor – Ssangyong – Guan Ho Joint Venture – Singapore.

Duties & Responsibilities

Site supervision, Land Surveying and coordination of works.

Provided the alignment of racetrack

Monitored and checked the on going excavation @ racetrack, horse and service tunnel.

Attended site work inspection.

Supervised the shuttering and concreting activities.

28 August 1995 to 15 February 1997

Project : Proposed 45 – Storey Office Tower Building w/ Retail Podium

( Suntec City Package 5 )

Position Held / Company : Building Surveyor cum Site Supervisor-Ssangyong

Engineering & Const. Co. Ltd.- Singapore.

Duties & Responsibilities

Set out building main grid lines, reference level both in structural and architectural works.

Provided box out opening on the slab for verticality of building and for marking of subsequent

floor using LASER VERTICAL PLUMMET instrument.

Monitored and checked excavation during the pile capping activities.

Provided as built of pile eccentricity.

Executed the daily settlement monitoring.

Provided blinding or lean concrete level and marked pile cap, casting level and alignment of column starter bar.

Supervised the rebar installation concreting activities.

Provided as built survey of finished structure.

In charge of internal cladding @ retail podium.

Prepared units for Conquas and Quality Mark inspection.

18 October 1994 to 23 August 1995

Project : Construction of Container Berths @ Ports of Singapore

Position Held / Company : Land Surveyor – Wing Construction ( S ) Pte. Ltd. –

Singapore.

Duties & Responsibilities

Executed survey for superstructure @ Container Berths.

Set out pile location prior to boring activities.

Checked & monitored excavation.

Marked pile cut off level of piles.

Did as built survey for pile eccentricity of piles.

Provided alignment of gantry rail, level of sole plate, buffer stop .

Joint survey w/ the Clerk of Works.

Did as built survey of finished structure.

20 February 1993 to 07 October 1994

Project : Construction of M R T C, C-618 ( From Yishun station to Marsiling station

w/ 4- station and 1- Bus – Interchange @ Woodlands Station ).

Position Held / Company : Land Surveyor –Hyundai Engineering & Construction

Co. Ltd. – Singapore.

Duties & Responsibilities

Executed topographic and as built survey of the proposed route of the project.

Set out hoardings boundary and borehole location.

Set out pile location prior to pile driving.

Monitored and checked pile cap excavation level and marked the pile cut – off level.

Checked and monitored the verticality of pier column during concrete casting.

Set out pier head metal formworks alignment and levels.

Set out the box out for bearing location and starter bar prior to concreting.

Set out the alignment and level of bearing location prior to installation.

Provided as built for the installed bearing prior to precast viaduct launching.

Provided as built for pier column and pier head structure .

Provided alignment and level of parapet wall.

Set out reference alignment and level of rail prior to installation.

Attended site work inspection w/ the Clerk of Works

09 November 1991 to 10 December 1992

Project : North – South Inter – Urban Tolls Expressway – Johor, Malaysia

Position Held / Company : Highway Surveyor – Hyundai Engineering &

Construction Co. Ltd. – Malaysia

Duties & Responsibilities

Did the topographic and as built survey along the proposed route .

Set out reference peg for alignment and level for road center line,

right and left hand side of the proposed road.

Set out the location and level pedestrian box culverts and drainage culverts.

Set out alignment and level of state road .

Set out pile location ( vertical and rake pile )

Marked the cut off level of pile.

Pile eccentricity survey.

Did as built for finished road structure.

November 1989 to 0ctober 1991

Project : Cadastral, Tax Mapping and Isolated Land Survey.

Position Held / Company : Draftsman and Instrument - man – N.M. Villaluna

Surveying & Associates – Philippines

January 1984 to December 1988

Project : Cadastral, Tax Mapping and Isolated Land Survey.

Position Held / Company : Draftsman and Instrument – man – N. M. Villaluna

Surveying & Associates - Philippines

Duties & Responsibilities

Conducted site survey assigned by Project Manager.

Did the survey computation and drafting of lot plan,subdivision,re-location plan and

cadastral map.

Did topographic and detailed survey.

I hereby certify that the above mentioned information is true and correct to the best of my

Knowledge and beliefs.

Yours truly,

Carlos M. Juguilon

Lead Surveyor



Contact this candidate