Post Job Free

Resume

Sign in

Power Plant Thermal

Location:
Ahmedabad, Gujarat, India
Salary:
480000
Posted:
July 05, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

GajendrasinghRathore PermanentAddress

Mobile:966*******,635*******, Village: Thukrawa

E-Mail:adnjxk@r.postjobfree.com Tehsil &Dist:

Sanghi Cement, Chittorgarh (Raj)

Sanghipuram,abdasa,Kutch(Guj.). PIN:312001

Professional Profile

Proven abilities to enhance the process operation optimize resource and capacity utilization escalates productivity & operational efficiencies. While curtailing the cost

/expenses. Adept at supervision, co-ordination and managing day to day and around clock operation and maintenance of all power plant & Desalination plant control and field instruments.

• JobExperience:

Total 5 Year Experience with68*2 MW Thermal Power plant(Sanghi Cement Plant) and 25 2MW and 23MW TPP (UltraTech Cement) and Coal milland raw mill in WonderCement.

Presently working in Sanghi Cement Plant Ltd. 68*2 MW (An Sanghi Cement Plant) from Dec2020 to tilldate.

Previous Company Wonder Cement Ltd. Coal mill and Rawmill

• JobResponsibilities:

Over all responsibilities for the 73 MW Thermal Power Plantfrom Instrumentation site asShift.

Planning & execution of preventive and Shut downmaintenance.

• JobDetails:

DCS/PLC Knowledge: ABB DCS and MAX DNA for BHEL Turbine & Wood ward 505 & Bentley Nevada (Vibration System) 3500.

Operation & Maintenance of fieldInstruments(Pressure,Level,Temperature, Flow Transmitters, control Valve, Valve Positioner, I/PConverter.

Calibration of (Pressure, Level, Flow, TemperatureTransmitters).

Operation of VFD(ABB)

Trouble shooting, Loop checking and Calibration of SmartTransmitters, Switches, RTD, Thermocuople, Control Valveetc.

Ash Handling System of Densveyer Conveying system checking & maintenance.

Sox,Nox Analyzer O2,CO,SPM,SWAS Analyzer system generalchecking andmaintenance

Individual troubleshooting and preventive maintenance of CHP andLime stone circuit from Instrumentationsite.

DM plant ETP,RO,UF Coolingtower

• PlantDetail

73MW (25*2MW) and (23*1MW), Thysen Krupp andBHEL

68*2MW Thermal PowerPlant

CFBC Boiler 101Bar,540 C temp.& 135 TPH Steam flow makeThysen

AFBC Boiler 60 TPH makeBHEL

Ash handling Plant MakeMACAWBER

CHP and Lime stoneCircuit

• OtherActivities

Spares & Materialhousekeeping

ISO Documentation and Calibrationrecord

• Educational Qualification:

Standard Board/University Year Percentage

S.S.C. Board of Sec.Edu.Rajasthan 2009 48.50

H.S.C. Board of Sec.Edu.Rajasthan 2011 59.31

Diploma

(Electrical)

Mewar University Chittorgarh

Rajasthan

2014 55

• PersonalInformation

DateofBirth : 31/08/1994

MarritalStatus : Married

Language : Hindi, English

Nationality : Indian

ComputerKnowledge : Windows, MSOffice,

Declaration : I here declare that above details are true andfair to the best of my Knowledge

Signature:



Contact this candidate