Post Job Free

Resume

Sign in

Exxon Mobil Hydro Power

Location:
Quezon City, Philippines
Posted:
July 05, 2021

Contact this candidate

Resume:

Ronquillo C. David

Email-add: adnjkt@r.postjobfree.com

# **, ******** ***, **** ******** Quezon City, Phil’s.

Contact: # 090******** / 095********

Position applied: GTAW/SMAW, 6G-R, MIG/FCAW, DOWNHILL WELDER,

WELDING FOREMAN/ WELDING SUPERVISOR.

BRIEF SUMMARY OF EXPERIENCE:

Solid work experience in heavy fabrication yard, for onshore/offshore topside structure modules, shipbuilding and dry dock ship repair, gold mining, Jet fuel depot tank, and pipe line, as a GTAW/SMAW, 6G-R, MIG FCAW, DOWNHILL, WELDER, for 25 years both local and overseas like MALTA shipyard, EUROPE, For the FPSO IKDAM, FPSO DIDON FAIRMONT FJORD and FAIRMONT FJELL, conversion and MEDIA BOUY for North Sea project. And BAYU UNDAN joint petroleum development Area (JPDA) OIL and GAS PLANT project, (OFFSHORE) in EAST TIMOR, and EXXONMOBIL PNG LNG main file marine facilities loading and substation platform. and Jetty project, (OFFSHORE) Tank installation/erection/pipeline for aviation fuel tank project. in Papua new guinea, And PHILIPPINES as a welder, welding foreman and welding supervisor, Like industrial structures fabrication yard, gold refinery, power plant, windmill, hydro power plant, geothermal plant, cross country piping, and offshore dredging project, this all jobs complies with the requirement and standard of ASME code section IX (1998) ASME IX boiler and pressure vessel code (2004) and AWS D1.1-2004 structural welding code steel, And standard, part 2, Chapter 4, Section 3, Of ABS rules for steel, Qualified to ABS Q2 And also complies with the requirement of ASME 1X (2007) for classification society of American bureau of shipping ABS and Lloyds Register, Malta office.

PERSONAL INFORMATION

Date of birth: * Dec. 22, 1966

Age: * 53. yrs. Old

Civil status: * Married

Religion: * Roman Catholic

Height: * 5’’4

Weight: * 120lbs.

Citizenship: * Filipino

Name of Spouse: * Madelyn P. David

Name of Children: * Siah Lyn P. David

* Kobe Mark P. David

SSS No: * 33-0742684-7

TIN No: * 166-888-908

Phil health No: * 19-026128322-4

Pag-ibig No: * 080*-******

Passport: * P4464454B

Issued on: * January. 21. 2020

Until: * January. 20. 2030

HIGHEST EDUCATION ATTAIMENT

Two-year College: * International Electronic and Technical Institute

Course: * Electronic Computer Technician

Date Graduated. 1989

TRAINING and SEMINAR:

Basic Occupational Safety and Health (BOSH)

Date, January 13 to 16 2014 Conducted by PEME Consultancy, INC.

Health Safety Security Environment (HSSE) training.

2A-1, 2B-1, 2B-2 course. Conducted by (Site Skill Training Center)

Date, June 19 to 23 and Aug, 12 to 14, 2013

Basic Offshore Safety Induction & Emergency Training (BOSIET)

Hydrogen sulphide awareness training. Conducted by Consolidated Training Center Inc. (CTSI)

Date, April-05, 07, 2010

Basic Welding (SMAW) Conducted by (AG&P)

Date, February 07 to March, 25, 1990

WORKING EXPERIENCE

Name of company. * GIR. inc.

Address. * p4-b1-lot 13 everlasting st. The Glens subd.

Brgy. San antonio. San pedro laguna Phil.

Name of projects. * Lrt line 1. Uppc. And st. Lukes medical center.

Position. * gtaw/smaw welder

Date of employment. * Sept. 09. 2017 up to present

Reason for leaving. * temporary stop

Job Description.

As a wqualified welder im responsible to weld in all positions and different process like Gtaw/smaw for the production weld like. ibeams.pipe support.double ending pipe joints of Cs/ss steel pipe for mechanical piping and industrial plant.building and transport facilities. as worker im responsible to pollow my foreman or supervisor to do my task as per my assignments.

Name of company: * JMB/MHI Services.

Address: * #3136 Gen. Garcia St. Bangkal Makati City.

Name of project: * SM/Keppel Podium.

Position: * Mechanical/Welding supervisor.

Date of Employment: * Dec. 05, 2016 up to Aug. 20, 2017

Reason for leaving: * Finish project

Job description:

Monitoring and supervising of fabrication and installation of fuel tank, fuel line pipe support, erection of 20’ inch. Carbon steel pipe and all welding works for Genset exhaust pipe for SM/Keppel Podium high rise building. Also making daily accomplishment and manpower report submitted to the office and to the admin office.

Name of company: * Management Resources Solution (MRS) (under Orion)

Address: * Six Mile Port Moresby Papua New Guinea.

Name of project: * JET Fuel Tank Depot

Position: * SMAW/FCAW Pipe Welder (uphill/downhill)

Date of Employment: * January 07, 2015 to May 08, 2016

Reason for Leaving: * Finish project.

Job description:

Us a qualified welder I’m performing my job to full welding of jet fuel tank and pipe line using ER6010 and ER7016 / ER7018 electrodes for root pass and capping both downhill and uphill process, for pipe and plates, all entire joint had 100% X-ray and 1.2 filler wire for FCAW process. We also check the right consumable material and thickness of plate using for the tanks and pipeline. Like flange, elbow, weldolet, reducer etc.

Name of company: * JLE Electromechanical New Zealand/SPWF South

Pacific Work Force

Address: * Napa Napa and Lihir Island Port Moresby Papua

New Guinea

Name of Project: * PUMA Refinery and New Crest Gold Mining (shutdown)

Position: * GTAW/SMAW Welder

Date of Employment: * Sept. 27, 2014 to January 05, 2015

Reason for leaving: * Finish project.

Job description:

Us a coded welder I’m qualified to full welding of double ending butt joint and elbow of 6’0 inch chrome 6 pipe using ER80s-B6 filler wire for root pass and E8015-B6 electrodes for filling and capping GTAW/SMAW Process, for PUMA Refinery radiant tube coil project. This entire joint is 100% X-ray. We also perform as qualified welder for the repair of primary crusher, Jaw crusher, bull mill and conveyors for gold mining shutdown.

Name of Company: * Clough Curtain joint venture (CCJV)

Under Orion group services Ltd.

Address: * Tari High land Papua New Guinea

Name of Project: * EXXON Mobil PNG LNG Project.

Position: * Pipeline Welder.

Date of Employment: * Sept. 18, 2013 to Dec. 16, 2013.

Reason for leaving: * Finish Project.

Job description:

Production full welding of 2, 10, 22 inch. Carbon steel pipe sched, 40 and 80 using 6010 electrodes for root pass and 9016 electrodes for filling and capping. For pipe line from well pad B supply to conditioning plant. Without any defect for visual and quality control (Q, C) acceptance, this entire joint had 100% x-ray

Name of Company: * Dyna-mac engr.pte.ltd.

Address: * Keppel Subic Zambales Phil.

Name of Project: * Shell Philippines Exploration BV. (SPEX)

Malampaya Phase, 2/3 project.

Position: * Welding Foreman.

Date of Employment: * Feb. 13, 2013 to Sept. 09, 2013

Reason for leaving: * Finish Contract.

Job description:

Monitoring all welding works for the fabrication of topside structure for the OIL&GAS project like air cooler (AC) A/B, compressor A/B, local equipment room (LER) modules, and piping works, provide welders consumables and tools, like filler wire, electrodes, mixed gas, argon etc. monitoring of heat temperature from 110 to 150 Celsius to ensure that the heat required and welders follows the WPS, check the right gap and root paste, assign the welders there respected assignment, conduct take 5 before start working, impose safety and housekeeping rules, make a daily plan for welding works to ensure that all welders perform effectively here jobs, make daily report submitted to the welding engr. or supervisor, coordinate to the high personnel like Q, A/Q, C inspector, vendor and client.

Name of Company: * Bam/Clough JV (under Orion group service Ltd)

Address: * Port Moresby Papua New Guinea

Name of Project: * EXXON MOBIL/PNG LNG Main File Marine Facilities

Project (offshore)

Position: * FCAW/SMAW Welder

Date of Employment: * Dec. 22, 2011 to July 06, 2012

Reason for Leaving: * Finish Project.

Job description:

As a coded welder I’m qualified to weld, a range of materials thickness is 10-50mm, carbon steel pipe double ending and single vie joint 10,12,18,24,30,36, inch, for jetty head stock file, and shear key ring for confined space at loading and substation main file marine facilities platform also I’m qualified to full welding legs, monofile, jacket, telescopic, navigation light and more, using E7016/E7018 electrodes for root pass/fill capping, and 1.0/1.2 filler wire for FCAW process. By complies with the requirements of ASME lX.

Name of company: * Enerthrust Inc.

Address: * G/F Perla Comse Bldg., # 26 Stanford St, Cubao Q, C

Name of project: * Zuellig Bldg. Chilled Water piping.

Position: * Welding Foreman such as Welder (CODED)

Date of employment: * March 17, 2011 to Nov. 28, 2011

Reason for Leaving: * Finish Project.

Job description

Organize and monitoring welders leading them to a safe work place, monitoring welders defects encountered and implements preventive measures to eliminated welding repairs, maintain proper documentation of daily welding consumables issuance and welding production report, carried visual inspection of completed joint, Production full welding of double ending joint of carbon steel pipe, flange, elbow, tee joint and pipe support, With diameter of 1’0, 2’0, 3’0, 4’0, 6’0, 8’0, 10, 12’0, 14’ 16’0, 18’0, 20’0, 24’0, Using E6011 electrodes for root pass and E7018 electrodes for filling and capping, all joint had good quality and past to air and hydro test, with acceptance of Q,C inspector and ASME 1X complies.

Name of company: * Seung Jin Const, Corp, Phil’s (Ltd)

Address: * Berthaphil III, Clark Freeport Zone Pampanga.

Name of Project: * Phoenix Semiconductor Phil’s Corp, (PSPC) Plant.

Position: * GTAW/SMAW Welder (CODED)

Date of employment: * November 03, 2010 to December 30, 2010

Reason for leaving: * Finish project.

Job description:

Productions full welding of double ending joint, flange, and elbow. Of carbon and stainless pipe with size and different diameter from ’3’4’1’2’4’6’8’10’12’14’20’24’36’

Inch, Schedule 30’40’60’ using ER308L filler wire for GTAW and E7018 electrodes for SMAW process, this pipeline installation from cooling tower to machine room, pump room, utility building and office / process building for centralize air-condition and production supply For the Phoenix Semiconductor Philippines Corporation, (PSPC) plant.

Name of company: * Clough/Amec, Service Ltd, Phil branch.

Address: * Level 22, Tower 1 Insular Life Corp, center,

Cor, Commerce Ave, Filinvest Corp, City, ala, mun, city.

Name of Project: * Bayu Undan Shutdown (Offshore) in Joint Petroleum

Development Area, (JPDA) in East Timor

Position: * GTAW/SMAW Welder (CODED)

Date of employment: * March 15, 2010 to May 25, 2010

Reason for leaving: * Finish Contract.

Job description:

As a coded welder I’m qualified to perform full welding of double ending joint of carbon steel / stainless steel and duplex pipe, and with different size 1, 2’4’6’8’10’16’ inch & different thickness, from small boar to heavy whole. this joint is 100% X-ray for oil and Gas, Propane, and LPG, processing and production pipeline. Using 80s filler metal for carbon, and 316L filler metal for stainless all GTAW process, And E7016 electrodes for SMAW process. We also weld pipe support and Stephener, and other welding works in the platform. By complies with the requirement of ASME IX 2007.

Name of company: * Aqua trade industrial & development corp. under

Baggerwerken decloedt EN zoon, Of (Belgium)

Address: * B2, L9, Caroline st. san Pedro 4, tandang sora, Q, C Phil.

Name of Project: * Pasig river rehabilitation dredging proj.

Position: * Welding supervisor.

Date of employment: * July 11, 2009 to Dec. 05, 2009

Reason for leaving: * Finish Contract.

Job description:

Monitoring welders leading them to a safe work place and environment/ monitoring welders defects encountered and implements preventive measures to eliminated welding repairs/ update records of welders daily performance, compute man-hours per dia-inch of each welders/ maintain proper documentation of daily consumables issuance and welding production record all these record are transmitted daily to construction engr./ carried visual inspection of complete joint./ coordinate directly with inspection company for any NDT works such as RT,DP,PMI,X-RAY./ review and scrutinize inspection report prior to hydro testing. Lead and organize welders at all times, supervise all production welding to ensure on time finish, liaise and coordinate with internal and external parties including vendors, owners and surveyor pertaining to project requirement. In Fabrication yard/ Onshore/offshore Like installation of engine cooling system pipe line, repair of pilot & accommodation house, installation of Bullard, anchor base, repair of port and starboard side, installation of fuel pipeline, spud stopper frame, winch base, for the pontoons and self-propelled split hopper barge, conduct toolbox talk every day and enforce safety.

Name of company: * Power manufacturing & marine Works (P.M.M)

Address: * Rsti, Comp, Ala, zapote, Rd, Las, City Phil.

Name of project: * P2324x power plant proj. pilmenira Masbate

Position: * GTAW/SMAW Welder (CODED)

Date of employment: * Oct. 28, 2008 to Dec. 16, 2008

Reason for leaving: * Finish project.

Job description:

Production full welding of double ending joint of carbon steel pipe, flange, elbow, tee joint using ER 70S2 filler metal for root pass and hot pass, And E7018 electrodes for filling and capping. For GTAW/SMAW process, with diameter of 02’04’06’08-inch, schedule 40’ & 60’ this entire joint has 100% x-ray by complies of ASME IX code of standard, for the power plant and gold refinery project.

Name of company: * Malta Shipyard LTD. (M, S, L,)

Address: * P, O, box, 581, Valletta, Malta Europe.

Name of project: * FPSO, Ikdam & Fairmont Fjord & Fairmont Fjell.

Conversion and media buoy for North Sea project.

Position: * GTAW/SMAW 6-GR/MIG FCAW Welder (CODED)

Date of employment: * Aug. 16, 2006 to Sept, 21, 2008

Reason for leaving: * Finish Contract.

Job description:

As a coded welder I’m qualified to production full welding of different size of pipe like carbon steel, Stainless steel, boiler, and copper tube w/ diameter of 1/2'3/4’0’6’08’10’14’16’18’20’ 24’30’36’ inch, For the FPSO oil and gas pipe line, oil rig, ship building & repair, yacht repair, Using ER308, 316L filler metal for stainless, & E70S2 filler for carbon, All GTAW process & E7016 & E7018 electrodes for SMAW and 6-GR process. I’m also qualified to perform MIG/FCAW welding w/ backing ceramic for ABS Q2 all steel standard, for high pressure vessels and tank. This plate is for RT and ultra-sonic test (UT) and 100% x-ray for pipe. In accordance to standard ASME code section IX, and ASME IX boiler and pressure vessel code, (2004) and AWS D1.1-2004 structural welding code of steel, with complies of ABS and Lloyds’ Register

Malta office.

Name of company: * G, E, Fabmik Inc.

Address: * 29/flr, city land bldg. Pasong tamo st, Makati Phil.

Name of project: * Irawan 15 M.W. modular power plant, 25 M.W.

Calapan modular power plant & 45 M.W north

Wind power plant proj. Bangui ilocos Norte

Position * GTAW/SMAW pipe welder

Date of employment: * Feb. 24, 2004 to Sept, 30, 2005

Reason for leaving: * Finish project.

Job description:

full welding of 2’4’6’8-inch, carbon steel pipe, flange, elbow, tee join, pipe support, for diesel pipe line supply to generator using ER 70S2 filler metal and E7018 electrodes for roots pass and fill and capping, GTAW/SMAW process, For the generated power, plant & wind mill plant project, can also perform us welding fabricator for the repair of hydraulic and mechanical crane. Trucks, back hoe blade, installation of check valve, butterfly valve, & flow meter, tightening of bolt, this job had good quality and Q, A,Q,C acceptance.

Name of company: * Meralco industrial engineering, Srves. (MIESCOR)

Address: * 5/flr, Renaissance tower Meralco ave, Ortega’s Pasig city.

Name of Project: * PGI-TIWI geothermal power plant, Maintenance Proj.

Position: * SMAW Pipeline Welder (CODED)

Date of employment: * Oct. 25, 2003 to Nov. 21, 2003

Reason for leaving: * Finish project.

Job description:

Production full welding of double ending joint of different size of carbon steel pipe for the main steam line, of cross country piping, W/diameter of 20’24’30’36’45

Inch, Using E6011 & E6010 electrodes for root pass, And E7018 electrodes for filling and capping all SMAW process, this entire joint w/ 100% x-ray, for the acceptance standard of ASME IX code.

Name of company: * Shiloh international corp.

Address: * 210 Alpap 2 bldg. trade st, Madrigal Business Park

Ayala Alabang mun, City, Phil’s

Name of Project: * Phil, associated smelting & refining corp. (PASAR)

Waste heat boiler proj, Isabel Leyte & stainless steel

Sea pipeline Mauban power plant Quezon prov. Phil

Position: * GTAW/SMAW Boiler Tube Welder (CODED)

Date of employment: * Oct. 26, 2002 to Feb. 17, 2003

Reason for leaving: * Finish project.

Job description:

Production full welding of double ending joint of waste heat boiler pipe and tube W/ diameter of 1/2'3/4’01’02 inch, Using SA 213 T22 material, for copper nickel and gold refinery plant, can also perform full welding of stainless steel pipe all GTAW process, For the replacement of sea water pipe line for Mauban power plant project This entire joint is 100% X-ray, by complies of ASME code section IX 1998 Edition.

Name of company: * G.P.E. builders Inc.

Address: * # 32 Christine st, parkway villages, San Francisco

Del Monte Quezon City Phil’s.

Name of Project: * Park & Ride Lawton Manila, Project.

Position: * Welding foreman

Date of employment: * May 25, 2001 to Oct. 21, 2001

Reason for leaving: * Finish project.

Job description:

As a welding foreman I’m responsible handle and carrying welder to give here respective assignment to perform here job, One by one. And I’m responsible to make delay production report, and welders performance report, submitted to the office, And we also check here welding works of activities inside the job site.

Name of company: * U-CON Builders Inc.

Address: * # 950-956 Espeleta st, Sta Cruz Manila.

Name of Project: * Fabrication shop, Mecauayan Bulacan.

Position: * Coded Welder

Date of employment: * Feb. 16, 2000 to Oct. 19, 2000

Reason for Leaving: * Finish Project.

Job description:

As a coded welder I’m qualified to production welding of buck’s columns and I-beams, Girder and other welding work, Using E7018 electrodes w/ultra-sonic test quality. I’m also performed welding fabricator for heavy equipment repair like back hoe, pay loader, bulldozer, tower crane, and trucks.

Name of Company: * Meralco Industrial Engr, Corp, (MIESCOR)

Address: * 5/Floor Renaissance Tower, Meralco Ave.

Ortega’s Center Pasig City, M, M, Phil’s

Name of Project: * Leyte Geothermal Power Plant Project.

Position: * SMAW Pipe Line Welder (CODED)

Date of Employment: * Jan. 28, 1997 to Aug. 19, 1997

Reason for leaving: * Finish project.

Job description:

Production full welding of double ending joint of carbon steel pipe, Flange, elbows

using E7018 electrode, SMAW process for the main stream pipeline, of cross country piping, Supply to the power plant turbine w/ diameter of.10, 18, 20, 24,30,36,40, 45, inch.all joint w/ 100% X-ray, For the complies of ASME IX code.

Name of company: * Tierra International cons.corp. (TICC) Address: * 2/flr.tierra bldg.1351.angono st. Mkati city. Phil’s

Name of Project: * Upper mahiao geothermal power plant, Project.

Kananga Leyte Phil’s

Position: * SMAW Pipe Welder (CODED)

Date of employment: * Sept. 04, 1995 to April 22, 1996

Reason for leaving: * Finish project.

Job description:

Production full welding of double ending joint of carbon steel pipe, flange, elbow, tie joint & pipe support for power plant main steam line piping W/ dia, 10’20’24’30’36’ 45 inch, E7018 electrodes for filling capping SMAW process, all joint 100% X-ray, and R, T & U, T for good quality and customer acceptance with the complies of ASME IX code of standard.

Name of company: * Diamant boarth Phil’s.inc.

Address: * # 345, south super hi-way, Paranaque, M, M, Phil’s

Name of Project: * P, N, O, C, silencer for geothermal power plant proj.

Position: * SMAW pipe welder

Date of employment: * Feb. 20, 1995 to July 31, 1995

Reason for leaving: * Finish project.

Job description:

Full welding of carbon steel pipe w/diameter of 4’6’8’10’inch, using E6010 electrodes for root pass and E7018 electrodes for filling capping, We also full welding of silencer tanks/hard pacing type of weld, flange, elbow, tee joint and more, All SMAW process. All this by complies of ASME IX code of standard.



Contact this candidate