Edgardo P. Roque

Objective

To be qualified on your needs as . Qualification

Experienced in pre-commissioning, commissioning, successful start-up and normal operation of the petrochemical plant.

Knowledge in operation of DCS, pumps, compressors, utilities, and other process equipment.

Proficient in PFD’s, PID’s and interpretation of logic diagram.

Familiar in tank farm, polymerization, distillation process, extrusion and utilities operation.

Experienced in ship/shore unloading of petrochemicals product particularly liquid propylene (pressurized and cryogenic).

Experienced in shore side facilities for gas handling, both for pressurized and cryogenic systems.

Knowledge in using SAP system for releasing, confirmation, maintenance notification and timekeeping.

Knowledge in using eDMS for uploading documents.

Efficient in tank calculation.

Knowledge in forklift operation.

Computer literate.

Hardworking, willing to work on rotation basis.

Concern most on manpower and plant safety.

Experience

APR.01,2016 – OCT. 03, 2020

TASNEE Petrochemicals (Saudi Polyolefins Company)

Office: P.O. Box 35576 Jubail 31961 Kingdom of Saudi Arabia Senior Coordinator III (Day Operation)

Job Description:

Responsible in smooth and efficient operations of the plant by assisting the Shift Supervisor in all requirement of the operation. Coordinate and follow-up maintenance activities. Ensure sufficient manpower requirement per shift by planning and scheduling personnel leave. Ensure standard operating procedure were followed and giving work instruction to Shift Supervisor as required. Directly reported and followed instruction from Superintendent. Ensure proper PPE and safety requirement of operation were provided in time.

Duties & Responsibilities:

Smooth and efficient operations of the plant by assisting the Shift Supervisor in all requirement regarding adjustments, verifications, or troubleshooting to be made on operation.

Applied the Work Instructions involved in the operation of the plant.

Ensure successful start-up and normal shutdown of the plant.

Ensure sufficient manpower requirement per shift by planning and scheduling personnel leave.

Coordinate and follow-up maintenance activities.

Coordinates with other section in concern regarding process condition, productivity, product qualities, customer satisfaction

(internal & external) and safety.

Report to Superintendent immediately any abnormalities in operation.

Maintain cleanliness and orderliness on working area.

Act as Communication Coordinator in any fire drill or actual fire and ensure “SAFETY FIRST” at all times.

OCT.01,2005 – APR.01,2016

TASNEE Petrochemicals (Saudi Polyolefin Company)

Office: P.O. Box 35576 Jubail 31961 Kingdom of Saudi Arabia PP Operation Shift Supervisor

Job Description:

To ensure safe, smooth and efficient performance of unit to achieve key performance indicators and objectives as per procedures & instructions.

Duties & Responsibilities:

Supervise, review and monitor all aspects of operations and liaise closely with interfacing departments to ensure smooth and efficient operations and total reliability of the plant.

Verify and review all current procedures for meeting operational objectives and recommend changes in procedures for the safe and efficient running of the plant.

Monitor any deviations in normal operations activities and troubleshoot operational problems in order to generate quick and prompt decisions making solutions to resolve operating problems and meet the shift production targets.

Applied the Work Instructions involved in the operation of the plant.

Ensure successful start-up and normal shutdown of the plant.

Instruct operators regarding adjustments, verifications, or troubleshooting to be made on operation.

Records operating parameters and pertinent information during the shift.

Coordinates with other section in concern regarding process condition, productivity, product qualities, customer satisfaction

(internal & external) and safety.

Report to Superintendent immediately any abnormalities in operation.

Maintain cleanliness and orderliness on working area.

Act as Incident Coordinator in any fire drill or actual fire and ensure “SAFETY FIRST” at all times.

JAN.04,2003 – SEP.30,2005

TASNEE Petrochemicals (Saudi Polyolefins Company)

Office: P.O. Box 35576 Jubail 31961 Kingdom of Saudi Arabia DCS PANEL Operator

Job Description:

Responsible in controlling and monitoring of all operations in the PP plant through DCS PANEL on rotation basis.

Duties & Responsibilities:

Monitoring and controlling process conditions of the plant and utility equipment through the use of DCS on rotation basis.

Applied the Work Instructions involved in the operation of the plant.

Coordinates to the field operator the charging of catalyst, co- catalyst, additives, and other raw materials and chemicals to be needed in the operation.

Assist in troubleshooting process related problems.

Ensure successful start-up and normal shutdown of the plant.

Instruct Field operators regarding adjustments, verifications, or troubleshooting to be made on operation.

Records operating parameters and pertinent information during the shift.

Coordinates with other section in concern regarding process condition, productivity, product qualities, customer satisfaction

(internal & external) and safety.

Report to Shift Supervisor immediately any abnormalities in operation.

Maintain cleanliness and orderliness on working area.

Act as Communication Coordinator Desk in any fire drill or actual fire and ensure “SAFETY FIRST” at all times. JUL.01,2001 – JAN.03,2003

Petrochemicals Corporation of Asia Pacific

Office: 2nd/F Chemphil Bldg. 851 Antonio S. Arnais Ave. Legaspi Village Makati City 1200

Plant: PPDC/PNOC Petrochemical Complex Batangas Dos, Mariveles, Bataan 2105

Production Shift Foreman

Job Description:

Supervises the operation of Tank farm, Polymerization, Extrusion, and Utilities. Responsible in overseeing all process equipment status condition and parameters. Ensure manpower pooling and their safety in the plant.

Duties & Responsibilities:

Implements the Work Instructions involved in the operation of the plant.

Ensures enough manpower during shift.

Supervises the charging of catalyst, co-catalyst, additives, and other raw materials and chemicals to be needed in the operation.

Ensure that the raw materials, chemicals and additives are on specification of the product and no contamination.

Make proper work request / preparation regarding equipment to be work-on by maintenance personnel.

Assist in troubleshooting process related problems.

Ensure successful start-up and normal shutdown of the plant.

Instruct DCS / FIELD operators regarding adjustments, verifications, or troubleshooting to be made on operation.

Review daily log sheet / logbook report of operation.

Records operating parameters and pertinent information during the shift.

Coordinates with other section in concern regarding process condition, productivity, product qualities, customer satisfaction

(internal & external) and safety.

Report to Shift Supervisor immediately any abnormalities in operation.

Maintain cleanliness and orderliness on working area.

Ensure “SAFETY FIRST” at all times.

SEP.09,1998 – JUL.01,2001

Petrochemicals Corporation of Asia Pacific

Office: 2nd/F Chemphil Bldg. 851 Antonio S. Arnais Ave. Legaspi Village Makati City 1200

Plant: PPDC/PNOC Petrochemical Complex Batangas Dos, Mariveles, Bataan 2105

DCS PANEL Operator

Job Description:

Responsible in controlling and monitoring of all operations in the petrochemical plant through DCS PANEL on rotation basis.

Duties & Responsibilities:

Monitoring and controlling process conditions of the plant and utility equipment through the use of DCS on rotation basis.

Applied the Work Instructions involved in the operation of the plant.

Coordinates to the field operator the charging of catalyst, co- catalyst, additives, and other raw materials and chemicals to be needed in the operation.

Coordinates to the field operator regarding equipment to be work-on by maintenance personnel.

Assist in troubleshooting process related problems.

Ensure successful start-up and normal shutdown of the plant.

Instruct Field operators regarding adjustments, verifications, or troubleshooting to be made on operation.

Records operating parameters and pertinent information during the shift.

Coordinates with other section in concern regarding process condition, productivity, product qualities, customer satisfaction

(internal & external) and safety.

Report to Shift Foreman and Shift Supervisor immediately any abnormalities in operation.

Maintain cleanliness and orderliness on working area.

Ensure “SAFETY FIRST” at all times.

SEP.09,1996 – SEP.09,1998

Petrochemicals Corporation of Asia Pacific

Office: 2nd/F Chemphil Bldg. 851 Antonio S. Arnais Ave. Legaspi Village Makati City 1200

Plant: PPDC/PNOC Petrochemical Complex Batangas Dos, Mariveles, Bataan 2105

Process Field Operator

Job Description:

Responsible in controlling and monitoring of all operations in the petrochemical plant through FIELD on rotation basis. Duties & Responsibilities:

Lined-up and carries out effectively start-up and normal shutdown procedures of equipment locally in accordance with the Work Instructions.

Monitor and ensure process conditions of the plant and utility equipment in the field are running smoothly and properly.

Coordinates to the DCS Panel operator regarding the charging of catalyst, co-catalyst, additives, and other raw materials and chemicals to be needed in the operation.

Coordinates to the DCS Panel operator regarding equipment to be work-on by maintenance personnel. Isolates process units prior to maintenance work.

Assist in troubleshooting process related problems.

Coordinates with DCS Panel operators regarding adjustments, verifications, or troubleshooting to be made on operation.

Records operating parameters and pertinent information during the shift.

Coordinates with other section in concern regarding process condition, productivity, product qualities, customer satisfaction

(internal & external) and safety.

Report immediately any abnormalities in operation to DCS Panel operator or to Shift Foreman / Shift Supervisor.

Maintain cleanliness and orderliness on working area.

Ensure “SAFETY FIRST” at all times.

JUN.15,1994 – JUN.15,1996

Al-Fayhaa Bottled Water Factory

Office: Mohammad Abdullaziz Al-Rajhi Establishment Riyadh, Kingdom of Saudi Arabia

Plant: Unizah Qassim, Kingdom of Saudi Arabia

Machine Operator

Job Description:

Responsible in controlling and monitoring of all operations in blow molding, injection, filler, and caser machine on rotation basis. Also include all utility equipment like Instrument Air Compressor, Reverse Osmosis, Ozonator, and conveying system. Ensure good quality of bottled drinking water and produce to the maximum of production by minimizing time loss.

Duties & Responsibilities:

Operate blow molding, injection, filler, and caser machine on rotation basis.

Monitor and ensure process conditions of the plant and utility equipment are running smoothly and properly.

Check all machine parameters and record all system status on log sheet.

Ensure adequate supply of raw materials for continues flow of production.

Response immediately on off-specs of production to make necessary adjustment or changes.

Coordinate with Laboratory Personnel for water analytical quality test.

Maintain cleanliness and orderliness on working area.

Ensure “SAFETY FIRST” at all times.

FEB.01,1991 – MAY.15,1994

Best Chemicals and Plastics Incorporated

Office: 27B Rufino Pacific Plaza, Ayala Avenue corner Herrera St., Makati City

Plant: Barrio Maduya, Carmona, Cavite

Production Shift Foreman

Job Description:

Oversees production area including raw material, extrusion, winder, utilities, and primary slitter on shift basis. Maintain operational smoothly at the highest production rate. Responsible in best quality of the product and manpower / plant safety.

Duties & Responsibilities:

Implements the Work Instructions involved in the operation of the plant.

Ensure that the raw materials, chemicals and additives are on specification of the product and no contamination.

Make proper work request / preparation regarding equipment to be work-on by maintenance personnel.

Assist in troubleshooting process related problems.

Ensure successful start-up and normal shutdown of the plant.

Instruct operators regarding adjustments, verifications, or troubleshooting to be made on operation.

Review daily log sheet / logbook report of operation.

Records operating parameters and pertinent information during the shift.

Coordinates with other section in concern regarding process condition, productivity, product qualities, customer satisfaction

(internal & external) and safety.

Report to Shift Supervisor immediately any abnormalities in operation.

Maintain cleanliness and orderliness on working area.

Ensure “SAFETY FIRST” at all times.

NOV.24,1988 – SEP.07,1990

HYUNDAI Engineering & Construction Co., Ltd.

Head Office: 140-2 Kye-Dong, Jongro-Ku, Seoul, Korea Site Plant: ADB Building Guadix Drive cor. Edsa, Mandaluyong, MetroManila

Material Expediter

Job Description:

Ensure adequate supplies of raw materials and equipment or to coordinate the flow of materials, tools, parts and processed goods within the plant.

Duties & Responsibilities:

Ensure adequate supplies of raw materials and equipment.

Make daily / monthly inventory report.

Check and inspect material quality and quantity received or issued.

Coordinate with plant engineers for scheduling of all materials, tools, parts needed in the project.

Expedite all materials, tools, and parts that are needed.

Coordinate with the entire supplier.

Maintain cleanliness and orderliness on working area.

Ensure “SAFETY FIRST” at all times.

Personal Data Date of Birth: February 28, 1967

Place of Birth: Tondo, Manila

Civil Status: Married

Nationality: Filipino

Height: 162.5cm.

Weight: 82.0kgs.

Religion: Christian

Sex: Male

Educational

Attainment

1985 – 1987 PATS College of Aeronautics Pasay City, Philippines

Bachelor of Science in Aeronautical Engineering

Undergraduate

Seminars /

Training

MS Excel 2016 Level 2 & 3

Nov. 19-Nov. 21, 2017 conducted by Al Khallej Training & Education

Forklift Operator (Refresher Session)

Dec. 07, 2015 conducted by TuV NORD Saudi Arabia

Honeywell Training Course (EXP-12R430 – TPS Operation) Aug. 21-24, 2015 conducted by Honeywell

Training Coordinator Workshop

Jun. 7-Jun. 8, 2015 conducted by AZtech

MS Project 2010 (Level 1 & 2)

Jun. 2-Jun. 4, 2015 conducted by Al Khaleej Training and Education

Root Cause Analysis

May 24-May 28, 2015 conducted by Reliability & Integrity

(TASNEE)

Competency Based Interview & PMS

May 10-May 11, 2015 conducted by AZtech

Distillation Columns Operation and Maintenance

Mar. 29-Mar. 31, 2015 conducted by PetroLab Engineering

Business & Report Writing

Mar. 2-Mar. 4, 2014 conducted by AZtech

Incident Command - Basic

Dec. 8-Dec. 12, 2013 conducted by FSA (Fire Science Academy)

Supervisory Skills Essential (Level 1 & 2)

Oct. 30-Nov. 3, 2010 conducted by Marcus Evans

Hazmat Training

Oct. 16-20, 2010 conducted by TSTC Terengganu Safety Training

Fire Fighting Level III

May 21-23, 2010 conducted by TSTC Terengganu Safety Training

Accident and Incident Investigation

Jan. 30-31, 2010 conducted by MEIRC Saudi Arabia Training Center

Leadership Development

July 01-06, 2008 conducted by MSTC Millennium Solutions Training Center

Motivating, Managing & Leading Teams: Making Teams Work Nov.04-08, 2006 conducted by EuroMaTech

Fire Fighter – Level II

June 17-21, 2006 conducted by SFTC Sabic Fire Training Center

First Aid / CPR Class

Feb. 27, 2005 conducted by AGH Al-Mana General Hospital

Fire Fighter – Level I

Sept. 13-17, 2003 conducted by SFTC Sabic Fire Training Center

First Aid – Level I

Aug. 30-31, 2003 conducted by SFTC Sabic Fire Training Center

Novolen Polypropylene Process (4 weeks training course) Feb.-May 2003 conducted by Novolen Technology

WEAVE – Work Effectiveness Thru Attitudes & Values Enhancement

Sep. 21-22, 1999 conducted by CAREER MATCH, INC.

Teambuilding Workshop

Dec. 9-10, 1998 conducted by TIME Training Institute for Managerial Excellence

BAYANIHAN: Teamwork Beyond Expectations

Oct. 5-12, 1996 conducted by SHEPHERD Philippines

Corporation

Radiation Safety

Mar. 24-Apr. 1,1993 conducted by Radiation Health & Safety / BCPI

References

Vicente P. Teriote - Staff Specialist (PP Maintenance) TASNEE Petrochemicals

adnhmh@r.postjobfree.com / +966*********

Jessie A. Tanagon

Abu Dhabi Polymers Co. Ltd.

adnhmh@r.postjobfree.com / +971*********

Joel G. Tobias – Sr. Planning Engineer

BOROUGE

adnhmh@r.postjobfree.com / +971*********

This is to certify that the above statement is true and correct upon the best of my knowledge and belief

Respectfully yours,

EDGARDO P. ROQUE