PROFESSIONAL SUMMARY

Over ** years of professional experience encompassing engineering design, analysis, optimization, and plant operations in the Offshore/Onshore Oil and Gas industry. Brown and Green Fields Upstream Development work. Pipeline projects. Handles aspects of engineering from Pre-FEED, FEED & Detailed Engineering.

Process role includes review of project specifications, design instructions, process studies, flow diagrams, and supplier information; communicates and interfaces with other project design and engineering disciplines; HAZOP analysis; good understanding of safe design & operating principles; the development of conceptual designs; PFDs, P&IDs, PSDs development; material and equipment data sheets / specifications. Experienced in the pressure relief valve, control valve, fluid flow pipe, pump head sizing and hydraulic calculations.

AREAS OF EXPERTISE:

Conceptual Studies

FEED

Detailed Design

P&ID Development

Equipment Sizing

Relief System

HAZOP

EXPERIENCE

01/2013–Present: Technical Professional III - Process, Wood Group, Houston, Texas

06/2019-05/2021: CHEVRON – ANCHOR PROJECT – GULF OF MEXICO

Responsibilities included development of equipment, instrumentation data sheets, relief valve sizing in iPRSM, flare system modeling, Relief, Flare and Blowdown report.

03/2018-04/2019: PHILLIPS 66 – GREY OAK PIPILINE PROJECT – TEXAS

Responsibilities included development of PFDs, P&IDs, pump sizing, line sizing.

10/2017-03/2018: ANADARKO PETROLEUM CORPORATION – CONSTITUTION, LUCIUS, HEIDELBERG BROWNFIELDS – GULF OF MEXICO

- Drafting work for Anadarko proposed MOCs on the Constitution Spar.

- Perform follow-up work for Lucius Spar to update drawings to show latest modification offshore and perform MOC/Brownfield modifications as required by Operations.

- Perform as-built support to the latest changes to Heidelberg drawings and perform brownfield MOC work as required.

06/2017-10/2017: KIEWIT OFFSHORE SERVICES LTD – PEREGRINO II – BRAZIL

Peregrino WHP-C Post FEED work for topsides. Responsibilities included development of system descriptions for topsides.

01/2017-06/2017: SAMSUNG HEAVY INDUSTRIES COMPANY LTD – MAD DOG 2 – TEXAS

This scope of work sets forth the design procurement construction integration testing commissioning and transportation of the floating production unit associated with the Mad Dog 2 development. Responsibilities included development of PFDs, safety analysis flow diagrams, material selection diagrams, alarm and set point register, system descriptions and equipment sizing.

10/2016-12/2016: RIO BRAVO PIPELINE COMPANY LLC – RIO BRAVO PIPELINE – TEXAS

Rio Bravo Pipeline System simulation. This work involves the hydraulic simulation of the proposed Rio Bravo Pipeline Project that will supply gas to the Rio Grande LNG terminal.

09/2016-10/2016: HOUSTON SUPPORT FOR IVAR AASEN

Houston support for the MEL project Ivar Aasen.

06/2016-09/2016: HESS CORPORATION – STAMPEDE – GULF OF MEXICO

PSV work

03/2015-03/2016: RASGAS COMPANY LIMITED – RASGAS OSS PROJECT – QATAR

Provide Engineering services for Offshore Sustainability studies for RASGAS existing Gas Fields in Qatar. Studies will provide options to sustain field pressures. Equipment sizing.

02/2015-03/2015: TRANSCANADA KEYSTONE PIPELINE LP – CUSHING FEASIBILITY – TEXAS

High Level Feasibility Study

08/2014-02/2015: TRANSCANADA KEYSTONE PIPELINE LP – MOSS HILLS – TEXAS

Provide design and system cold eyes review scope verification study and specification review.

12/2013-08/2014: WOOD GROUP PSN INC. – PSN-HESS OFFSHORE BROWNFIELD – GULF OF MEXICO

Provide Engineering Services to WG PSN for HESS Brownfield projects

01/2013-12/2013: INPEX/SHI - ICHTHYS PROJECT – OFFSHORE GAS FIELD DEVELOPMENT. WESTERN AUSTRALIA

Detail Engineering Phase. The largest semi-submersible facility of its kind. System Engineer of Gas Dehydration and TEG Regeneration Units. The role involved in participating HAZOP, this led to action items, for which we developed resolutions and incorporate into project documents. PFDs, PI&Ds updates, Line List, Line sizing, backcheck of PSV, Control valves, and pumps calculations. Updates of Control Narratives. Review and comments on vendor’s documents. Develop instrumentation data sheets.

08/2008–01/2013:

Senior Process Engineer, WorleyParsons, Houston, Texas

09/2010-01/2013: EXXON MOBIL - HEBRON PROJECT - OFFSHORE FIELD DEVELOPMENT. NEWFOUNDLAND & LABRADOR, CANADA

Process Engineer of Production and Separation Systems for FEED and Detail Engineering Phases, the development of the project includes full topside production and processing facilities for the oil, gas and water. The Topsides production facilities have the capacity to handle for the life of field production, for more than 30 years. The crude oil production rate will be 23,850 Sm3/day (150 KBD) of oil, with a higher total liquid rate of approximately 50,000 Sm3/day (314 KBD) to accommodate the high volumes of produced water. The produced water system will be designed to treat roughly 45,000 Sm3/day (283 KBD) of produced water for overboard disposal as per regulation or possibly re-injection into the sub-surface if feasible.

Responsibilities included development of PFDs, P&IDs, Process Safety Diagrams, Material Selection Diagrams, Line List. Perform equipment, two-phase flowline sizing. Develop equipment, instrumentation data sheets, studies and system descriptions. Participate in HAZOP; this led to action items, for which we developed resolutions and incorporate into project documents. Review and comments on other departments' design documents. Process Data inputs to Instrumentation Data Base (INtools).

01/2009-09/2010: EXXON NEFTEGAS LIMITED – SAKHALIN-1 PROJECT-A-D OFFSHORE FIELD DEVELOPMENT. SAKHALIN, RUSSIA

FEED and Detail Engineering Phases, the project is to provide the main processing and utilities systems for offshore topsides 90 KBPD of oil, 125 KBPD of total liquids, and associated gas production, including 75 MMSCFD of gas lift. Responsibilities included line sizing, PSV sizing, Control valve, RO sizing. Settle-out conditions calculation for LP and HP Compressors, P&ID drawings development, review and comments on the Vendor’s drawings. Line List, PSD (Process Safety Diagram), PFD, Process Data inputs to Instrumentation Data Base (INtools). Review and comments on other departments' design drawings/documents and supplier equipment drawings. Develop and update project master documents/drawings. HAZOP Close-out action items resolutions.

08/2008-01/2009: CONOCOPHILLIPS PROJECT, PRE FEED PHASE. IRAQ

Pre-FEED Engineering Project to increase oil production. Both green and brown field studies were completed. Responsibilities included development of PFDs, process simulation (HYSYS), preparation of Process Data Sheets for heat exchangers, reboilers, air coolers, pumps, compressors, pressure vessels, etc.

07/2007-08/2007: TENGIZCHEVROIL-GAS UTILISATION PROJECT- GAS PROCESSING UNIT, Phase 3 (FEED), TENGIZ, KAZAKHSTAN

P&IDs review, line size calculation. Weekly report on activity progress.

07/2006–08/2008:

Process Engineer, WorleyParsons, Atyrau, Kazakhstan

09/2007-07/2008: TENGIZCHEVROIL-SULFUR EXPANSION PROJECT, Phase 2 (Conceptual Design)

Conceptual Design (Phase 2) of Sulfur Expansion Project (SEP), the objective of SEP is to select, define, and implement systems and facilities that will result in saleable sulfur export mainly as an environmental / pollution abatement project.

Carried out developing of Conceptual Design of the Sulfur Degassing Unit, reviewed licensor’s data and drawings; Developed Water Treatment Unit Philosophy; Evaluate Boiler Conception, determine requirements; Specified Sulfur Granulation Facility and other brown field modifications. Site visit and interaction with the Client’s operations and process engineering personnel

12/2006-07/2007: TENGIZCHEVROIL-CRUDE TANK FARM PROJECT – Phase 4 (Detail Engineering)

Detailed Engineering (Phase 4) of Crude Tank Farm, the project comprises the installation of equipment and systems to provide import, storage and export facilities for TCO (Tengiz Chevroil) crude at the Tengiz site.

Responsibilities included: Checked equipment specifications, line sizing, preparation of Equipment Datasheets, development of Piping Material Specification Datasheets, management reporting, complete and revise CAD drawings and manual sketches. Check, back check, and correct manual/computer results. Reviewed and commented on other departments' design drawings/documents and supplier equipment drawings. Developed and updated project master documents/drawings. Weekly report on activity progress.

11/2006 – 04/2007: TENGIZCHEVROIL-WASTE WATER SOLIDS REMOVAL–Phase 4 (Detail Engineering)

Detailed Engineering (Phase 4) of Waste Water Solids Removal, the project is to remove solids from contaminated surface water waste water that is injected into disposal wells.

Responsibilities have included: Review and comment on other departments' design drawings/documents and supplier equipment drawings. Perform and issue process diagrams (P&IDs, PFDs) using process standards and specifications; interfacing with other project design and engineering disciplines; weekly report on activity progress.

Performed Line List, Equipment List and Deliverable List.

Field assignment: investigation and survey of existing facility

08/2006-07/2007: TENGIZCHEVROIL-UNIT-600 WATER TREATMENT & DISPOSAL PROJECT Phase 4 (Detail Engineering)

Detailed engineering (Phase 4) of Water Treatment and Disposal, the project is to collect, treat and dispose of all runoff (acidic) water from Sulfur Pads, Chemical Injection Packages.

Responsible for updating and revising CAD drawings (PFDs, P&IDs) and documentation. Develop the Chemical Injection Package, includes line and pump sizing, provides Process data inputs to Instrument and Mechanical. pH chemical injection package sizing calculation report, development of Piping Material Specification Datasheets. Weekly reports on activity progress.

Performed Line List, Equipment List and Deliverable List. Review and comment on other departments' design drawings/documents and supplier equipment drawings.

04/2002–07/2006

6th grade Plant Operator, Tengizchevroil LLP, Gas Plant, Tengiz, Kazakhstan

The job involves monitoring the process flow, maintenance, service of process equipment and process instrumentation. Involved in Plant Turnarounds.

EDUCATION

2002-2003: Master Degree in Petroleum Chemistry, Atyrau Oil and Gas Institute. 2003

1993-1998 BSc Degree in Chemical Technology of Fuels and Hydrocarbons Materials (Process Engineering), department of Technology, Atyrau Oil & Gas Institute, Atyrau, Kazakhstan, 1998

Attended many First Aid, Fire Fighting, Safety Courses and practical training.

PERSONAL STRENGTHS:

Responsibility;

Good Team Builder and Player/Effective Communicator;

High learning capability.

SPECIFIC TECHNICAL EXPERTISE/SPECIALIST COURSES/ LANGUAGE

Well versant and hands on experience with the computer softwares utilized in Engineering Companies for Process Engineering activities – following are the few ones

Microsoft Software/VISIO

KORF (Hydraulics Simulation)

LineSize501L

Aspen HYSYS / FLARENET

iPRSM

PIPEPHASE

PIPESIM

AFT Fathom

Sulcol (Sulzer Software)

SmartPlant Intrumentation (InTools)

CAXperts PID DataManager (Line List, Software program)

Languages: Kazakh; English; Russian.