Post Job Free

Resume

Sign in

Oil Refining Exxon Mobil

Location:
Cebu City, Philippines
Posted:
July 01, 2021

Contact this candidate

Resume:

Candidate Profile

adngv2@r.postjobfree.com/adngv2@r.postjobfree.com

+639*********/+633********/+639*********

Name Romanito Misa Ferrer

Discipline Piping / Mechanical Superintendent

Nationality Philippines

Language Filipino, English

Education Bachelor of Science in Mechanical Engineering

Graduated – March 1992

University of Cebu, Mandaue Cebu, Philippines

Career Objective

A position which offers opportunity to develop my skills in supervision with emphasis on piping, Start from Fabrication to Construction until Pre-com and Commissioning,materials usage control, shutdown maintenance work leading to a future knowledge with additional responsibilities.

Summary of Experience

More than twenty two (22) years of extensive worked experience in construction works relating to Petrochemical Plant, Oil and Gas, Dry-dock or Ship yard installation of piping works and Steel Structures Well verse in Tie-ins, Piping Supervision in a plant, new plant and On board piping ship repair works. Well verse of Project specification standard plans, piping code of the project, Line checking, Familiarization of the Test Package and witnesses testing (Hydro Test, Pneumatic Test, Gravity Test and Service Test of the pipe line).Prepare (Rfi) and Wetnesses Holiday Test,Blasting,Painting prior to Wrapping of all welding joints.Engage in Pre punch listing activities prior to Hydro Testing stage.Clearing post punch items as per system before and after Pre-com. / Commissioning activities.Participate daily and weekly safety toolbox talk on contruction activities for Do’s and Don’ts in the field area.

Employment History Duration

Company GS Construction Arabia

Client Rabigh Refining and Petrochemical Company (ARAMCO)

Pmc Petro Rabigh Refining Company (PRC) (ARAMCO)

Position Pipng / Mechanical Turn Around Superintendent

Period October 20,2019 up to June 11,2020 = 6 Months.

Project PRC 2020 Turn Around Project (Aramco Project)

November 29, 2018 to October 19, 2019 ---Rest waiting for next assignment.

Company GS Engineering & Construction Co. Ltd.

Client Abu Dhabi Oil Refining Co. ( ADNOC TAKREER )

Pmc Jacobs Engineering Group Inc.

Position Superintendent Piping / Mechanical

Period December 20,2017 up to November 28,2018 = 11 Months.

Project Ruwais Refinery West (RRW) Project Ruwais, Abudhabi, U.A.E.

October 24, 2017 to December 19, 2017 ---Rest waiting for next assignment.

Company GS Engineering and Construction

Client Abu Dhabi Company for Onshore Oil Operations (ADCO)

Pmc Abu Dhabi Company for Onshore Oil Operations (ADCO)

Position Superintendent Piping / Mechanical

Period July27 up to October23, 2017 = 3 Months.

Project Rumaitha Shanayel Phase III NEB Project.Rumaitha,Abu Dhabi,U.A.E.

June 2016 to July 2017 ---Rest waiting for next assignment.

Company JGCS Consortium / GS Engineering and Construction

Client Nghi Son Refinery and PetroChemical Co. ( NSRP )

Pmc Foster Wheeler Co.

Position Superintendent Piping / Mechanical

Period March2014 up to June2016 = 2 Years and 3 Months.

Project Nghi Son Refinery and PetroChemical(NSRP)Nghi SonThanh hoa,Prov,Vietnam.

December 2013 to March 2014 ---Rest waiting for next assignment.

Company GS Engineering & Construction Co. Ltd.

Client Abu Dhabi Oil Refining Co. ( TAKREER )

Pmc Jacobs Engineering Group Inc. / ABS Group Inc.

Position Superintendent Piping / Mechanical

Period November2012 up to December2013 = 1 Year and 1 Month

Project Ruwais Refinery Expansion (RRE#2) SMP 5 Project Ruwais, Abudhabi, U.A.E.

October 2012 to November2012---Rest, hired by another company.

Company Mitsui Engineering & Shipbuilding Co. Ltd.

Client Exxon Mobil Asia Pacific Pte. Ltd.

Pmc Shaw Stone and Webster International Inc.

Position Superintendent Piping / Mechanical

Period June 2012 up to October 2012 = 4 Months

Project Singapore Parallel Train (SPT) Olefins Project,Jurong Island, Singapore

May 2012 to June 2012 --- Rest, hired by another company.

Company Samsung Engineering Co. Ltd. / Sungchang E&C

Client Abu Dhabi Oil Refining Co. ( TAKREER )

Pmc Mott Mac Donald

Position Supervisor Piping / Mechanical

Period January2011 up to May2012 = 1 Year and 4 Months

Project Ruwais Refinery Expansion (RRE#3) U & O Project Ruwais,

Abudhabi, U.A.E.

December 2010 to January 2011 --- Rest, hired by another company.

Company Qatar Engineering & Construction Co.

Client Ras Gas and Oryx GTL

Position Supervisor Piping / Mechanical Shutdown Maintenance.

Period December2009 up to December2010 = 1 Year

Project Oryx Gtl, Rasgas Train 1,2,5, & 6 Shutdown Maint. Project Ras laffan, Qatar

November 2009 to December 2009 --- Rest, hired by another company.

Company Samsung Engineering Co Ltd.

Client Saudi Arabian Basic Industries Company (SABIC)

Pmc Flour Daniels Co.

Position Supervisor Piping / Mechanical

Period January2008 up to November2009 = 1 Year and 10 Months

Project Saudi Kayan Poly Propylene Plant. Jubail, Kingdom of Saudi Arabia.

December 2007 to January 2008 --- Rest, hired by another company.

Company Hyundai Engineering / Sejong Emirates Co.

Client Dubai Electricity & Water Authority (DEWA)

Pmc Dubai Electricity & Water Authority (DEWA)

Position Supervisor Piping / Mechanical

Period January2005 up to December2007 = 2 Years and 11 Months

Project ‘’L’’ Station Phase II, Dubai Electricity&Water Authority (DEWA)Power Plant

. Jebel Ali, Dubai, United Arab Emirates

November 2004 to January 2005 --- Rest, hired by another company.

Company Olayan Descon Industrial Co. Ltd.

Position Piping Foreman (Site & Fabrication)

Period November2002 To November2004 = 2 Years

Project Saudi Methanol Plant, Jubail K.S.A.

September 2002 to November 2002 --- Rest, hired by another company.

Company Al Rushaid Construction Co. Ltd./Aramco

Positon Foreman Piping

Period September2001 To September2002 = 1 Year

Project Berri Gas Plant, Jubail Kingdom of Saudi Arabia.

August 2001 to September 2001 --- Rest, hired by another company.

Company Daelim Industrial Company Ltd.

Position Foreman Piping

Period February1999 To August2001 = 2 Years and 6 Months

Project Formosa Petro Chemical Company,

Taiwan, Republic Of China.

January 1999 to February 1999 --- Rest, hired by another company.

Company Chiyoda Petrostar Limited

Position Pipe fitter / Fabricator

Period October1997 To January1999 = 1 Year and 3 Months

Project Aromatics Project (Say)

Yanbu Al Sinayah, Kingdom of Saudi Arabia.

September 1997 to October 1997 --- Rest, hired by another company.

Company Sanko Engineering Co.

Position Pipe fitter / Fabricator

Period January1996 To September1997 = 1 Year and 8 Months

Project QGL Plant Project, Ras Laffan, State Of Qatar

December 1995 to January 1996 --- Rest, hired by another company.

Company Apo Cement Corporation

Project Pipe fitter / Fabricator

Period December1994 To December1995 = 1 Year

Project Utility Water Pipeline and Air Lines for Pnuematic Tools Equipment,Apo Cement Plant

Tinaan Naga, Cebu, Philippines

Brief of Work Description

. Carried out Turn Around Site inspection all equipments and connection nozzles pipelines in preparation for Shutdown activies. . . Carried out Shutdown activities by executing scope of work mentioned as per work permit system.

. Familiar with GTP Operation (Great Tools Piping), Such as, GTP JC

(Joint Contact),GTP AS Manager (Auto Spool),GTP Macon(Material Control),GTP ST(Spool

Tracking).

●Conduct Walk through Necessary to all Sub Contractor’s Managers and Staff.

●Conduct Meeting Obviously eveyday to all the Sub Contractor’s Supervisor’s.

●If necessary there is a problem report immediately to my Superintendent.

●Can Read & Interpret Plot Plan, Isometric Drawings & Specifications.

●Raised up (SI) Site Instruction or Work Orders for Additional Scope of Work.

●Supervised and Coordinates Work Plans and Scope of Work.

●Reinforce safe acts&correct unsafe acts using the principles of behaviors based on safety.

●Listen and Respond to employees concerns regarding workplace unsafe conditions.

●Familiarized in line checking, Test Packages and Pressure testing of lines.

●Witness the items to be clear for acceptance of the line.

●Familiarized in isometric drawings for mechanical pipings.

●Coordinate with client and other main contractor in interface works, from existing plant.

●Supervised piping installations, tie in and revamping activities.

●Provide work permits for Hot & Cold works inside the entire plant.

●Supervised Piping fabrication,Site Installation and Erection activities.

●Supervised Pipng works for Tie in connection on live existing plant.

●Supervised on AG, UG and Around the Equipment Piping installation works.

●Supervised on Hydro Testing,Pneumatic Testing,Air blowing&Water flushing of Pipeline

●Supervised on Valves & Filters removal,Repair some Trays damage inside the Vessels,Furnace and Execute Hydro Jetting activities for Shutdown Maintenance works.

●Supervised on Pre fabrication of spools and installation at site for preparation of Pre-com.

●Supervised on Water flushing, Dewatering and Air blowing for Pre-comm activities.

●Supervised Pre-com & Commissioning works base on given Test packs & work plans.

Jobs Experience

Construction Management (EPCM)

●Main Contractor Representative.

●Project monitoring Implementation of the Specification and standard in place procedure.

●Approved and enforcing Risk Management control and Job safety risk assessment (JSRA),Job safety analysis (JSA) and Job safety evaluation (JSE).

●Enforcing project Safety Procedure, Rules and Regulation, Promoting behavioral safe working practices in maintaining an injury incident free culture.

●QA/QC coordination checking tolerances for welding gap, pipe beveling, squareness,plumbness of pipe and check most important the correct dimension of spools and the exact orientation of piping fabrication.

●Knowledge in HSE system and policies for Piping and Mechanical works and other related discipline.

●Knowledgeable & well experienced with General arrangement plans, P&ID, isometric drawings for piping, mechanical and structural disciplines.

●Familiar with both practical and theoretical applications of international codes and standards for pressure vessels, tank (API) and piping (ASME B31)

●Familiar with Amec, Foster wheeler, Bechtel, Exxon Mobil,Worley Parson,Sabic & Aramco Standards and Specifications.

●Enforcing Project Safety Procedure,Rules and Regulation,Promoting behavioural Safe Working Practices in Maintaining an Injury & Incident free culture.

●Excellent interpersonal, communication and leadership skills. Self starter, team player, sense of responsibility and highly trainable goal oriented person.

●Knowledge in Microsoft office such as Ms Word, Excel, Power Point and Outlook.

.

Project Management

●Owner / Client Representative.

●Review Contracts,Project Specification,Standard Procedures and Deliverables.

●Process Conceptual Development,Civil,Structural,Mechanical Equipment and Piping Design P&ID,Plant layout,and Pipe sizing and Syupports,and Material specification requirements.

●Review Vendor / Manufacturer / Supplier specification, Data,Manua,Installation procedures.

●Review scope of work,listing activities/ project data, quantity estimating BOM/BOQ and out-sourcing suppliers/ contractor.

●Developed PEP-project execution plan, procedures and project installation /method of statement, PQP-project quality plan and ITP-inspection and test plan.

●Interface discipline to developed project Milestone schedule.

●Process piping layout and design, pipe-support and material specification selection.

●Verification of Mechanical Equipments,Pressure Vessels /Pipe Spools Fabrication and Installation.

●Site Inspection and Puch listing system packages/ piping line checking and complition. Pneumatic and Hydro pressure testing as per system package.

●System walkdown prior to system handover Transfer of Care, Custody and Control to client.

●Performed Pre-Commissioning and commissioning activities under the supervision by manufacturer/vendor’s specialist, Client Engineers and Owner Stakeholder/Plant operators.

PERSONAL DATA :

BIRTH DATE : September 15, 1970

BIRTH PLACE : Naga, Cebu, Philippines

CIVIL STATUS : Married

CITIZENSHIP : Filipino

RELIGION : Roman Catholic

HEIGHT : 5’6”

WEIGHT : 120 lbs.

OTHER DATA :

PASSPORT NUMBER : EB 7595804

DATE ISSUED : March 08, 2013

DATE EXPIRED : March 07, 2018

SEAMAN’S BOOK # : BO 476175

DATE ISSUED : October 1, 2007

DATE EXPIRED : September 29, 2012

EMPLOYMENT PASS # : G5306916P

EDUCATIONAL BACKGROUND:

YEAR

GRADUATED;

ELEMENTARY : Naga Central Elementary School 1981-1982:

SECONDARY : Naga Provincial High School 1986 -1987:

COLLEGE : University of the Visayas 1990-1991:

COURSE : Bachelor of Science in Marine Engineering

VOCATIONAL : Technical Educational Skills & Development Authority (TESDA)

Formerly National Manpower and Youth Council. (NMYC)

COURSE : Shielded Metal Arc Welding (SMAW) April 1992-1993:

:Pipefitting Fabrication October 1993-1994:

TRAINING : University of Cebu-Maritime Educational and Training Center

(UC-METC) September 10 to 18, 2007:

COURSE : Basic Safety Training (BST) w/ Four Modules

1. Personal Survival Techniques

2. Fire Prevention and Fire Fighting

3. Elementary First Ai

PERSONAL DATA :

BIRTH DATE : September 15, 1970

BIRTH PLACE : Naga, Cebu, Philippines

CIVIL STATUS : Married

CITIZENSHIP : Filipino

RELIGION : Roman Catholic

HEIGHT : 5’6”

WEIGHT : 120 lbs.

OTHER DATA :

PASSPORT NUMBER : EB 7595804

DATE ISSUED : March 08, 2013

DATE EXPIRED : March 07, 2018

SEAMAN’S BOOK # : BO 476175

DATE ISSUED : October 1, 2007

DATE EXPIRED : September 29, 2012

EMPLOYMENT PASS # : G5306916P

EDUCATIONAL BACKGROUND:

YEAR

GRADUATED;

ELEMENTARY : Naga Central Elementary School 1981-1982:

SECONDARY : Naga Provincial High School 1986 -1987:

COLLEGE : University of the Visayas 1990-1991:

COURSE : Bachelor of Science in Marine Engineering

VOCATIONAL : Technical Educational Skills & Development Authority (TESDA)

Formerly National Manpower and Youth Council. (NMYC)

COURSE : Shielded Metal Arc Welding (SMAW) April 1992-1993:

:Pipefitting Fabrication October 1993-1994:

TRAINING : University of Cebu-Maritime Educational and Training Center

(UC-METC) September 10 to 18, 2007:

COURSE : Basic Safety Training (BST) w/ Four Modules

1. Personal Survival Techniques

2. Fire Prevention and Fire Fighting

3. Elementary First Ai

PERSONAL DATA :

BIRTH DATE : September 15, 1970

BIRTH PLACE : Naga, Cebu, Philippines

CIVIL STATUS : Married

CITIZENSHIP : Filipino

RELIGION : Roman Catholic

HEIGHT : 5’6”

WEIGHT : 120 lbs.

OTHER DATA :

PASSPORT NUMBER : P6077352B

DATE ISSUED : April 13, 2021

DATE EXPIRED : April 12, 2031

SEAMAN’S BOOK # : BO 476175

DATE ISSUED : October 1, 2007

DATE EXPIRED : September 29, 2012

SINGAPORE EMPLOYMENT PASS # : G5306916P

EDUCATIONAL BACKGROUND:

YEAR GRADUATED;

ELEMENTARY : Naga Central Elementary School 1981-1982:

SECONDARY : Naga Provincial High School 1986 -1987:

COLLEGE : University of Cebu 1991-1992:

COURSE : Bachelor of Science in Mechanical Engineering

VOCATIONAL : Technical Educational Skills & Development Authority (TESDA)

Formerly National Manpower and Youth Council. (NMYC)

COURSE : Shielded Metal Arc Welding (SMAW) April 1992-1993:

:Pipefitting Fabrication October 1993-1994:

TRAINING : University of Cebu-Maritime Educational and Training Center

(UC-METC) September 10 to 18, 2007:

COURSE : Basic Safety Training (BST) w/ Four Modules

1. Personal Survival Techniques

2. Fire Prevention and Fire Fighting

3. Elementary First Aid

4. Personal Safety and Social Responsibilities



Contact this candidate