RESUME: MECHANICAL ENGINEER

CURRICULUM VITAE

ANNAMALAI.B

Mobile: +919*********

E-Mail: ************@*****.***

In quest of assignments in Project Planning, Execution Erection & Commissioning,Operation and Maintenance of Thermal Power station or in CHP sector with an organization of high repute .

PROFESSIONAL SNAPSHOT

An astute professional with 7years of valuable experience in Erection & Commissioning, Operations & Maintenance of Mechanical system in Thermal Power Plants.

Skilled at managing maintenance, erection & commissioning activities involving resource planning, in-process inspection and co-ordination with internal / external departments.

Capable of setting priorities, developing a work schedule, monitoring progress towards goals, and tracking details / data / information / activities.

An effective communicator with excellent skills in building relationships; possess strong analytical, problem solving and organizational abilities. OCCUPATIONAL SCAN

Jan-06-2014 to July-25-2014 Ayoki fabrican (P) Ltd H.O- Pune, Maharashtra as (Power Plant Erection Project Company) Asst. Store in charge .Mechanical July-28-2014 to July-15-2020: CREW (P) Ltd under Jhajjar Power Limited 2 X 660 MW Thermal Power Plant, Jhajjar, Haryana as Asst. Engineer Mechanical July-30-2020 to Till Now: CREW (P) Ltd under Karaikal Port PVT.LTD as Engineer Mechanical KEY DELIVERABLES

Maintaining 90% equipment availability and 100% system availability all the time by continues monitoring on Preventive, Predictive & Conditioning Monitoring.

Maintain all the spare inventory for Belt conveyors, Wagon tipplers, Stacker Re claimers, Ship Un loader, Wagon Loading system, Truck Loading system,Crushers, Roller Screen, Plough feeders, ILMS & HTMS, Dust Extraction System, Dust Suppression System, Pumps, Yard Sprinklers and related auxiliaries.

Developing new vendors for the spare and performing inspection jobs of hydraulics, belts and related spare parts and Technical Evaluations of contracts and bidding documents.

Planning and executing modification job related to system for increasing reliability and efficiency.

Analysis of root cause of failure analysis of Equipment’s, Process system & suggesting Corrective and Preventive Actions for the same with implementation of 5-S, quality and safety aspect at workstation

Manpower distribution/Vendor developments/ MIS report Preparation.

Channelizing the smooth functioning of CHP by carrying out all the documentation related work in SAP Software.

ACHIVEMENTS

RESUME: MECHANICAL ENGINEER

Successfully carried out the modification job in Wagon Tippler for unloading of the Bulge wagon.

Successfully carried out the design modification in wagon tippler lean plate to avoid frequent breakdowns

Successfully carried out the modification job in Roller screen to control the bunker feeding Coal Size.

Successfully carried out the Replacement of Stacker/Reclaimer Luffing Hydraulic Cylinder

Successfully carried out the Replacement of Stacker/Reclaimer- Bucket Wheel Hydraulic Drive Motor Making By-Hagguland-CB-480-560 Model

Successfully carried out the modification job in Ship un loader of.

Implementation of 5-S at the CHP system area.

Coordinating with MBE as well as inter departmental operation & maintenance teams.

Providing 90 % equipment availability and 100% system availability all the time by continues monitoring on Preventive, Predictive & Conditioning Monitoring.

Spare inventory maintenance.

Done the day to day problem troubleshooting.

Resource planning for reduction of downtime.

Maintenance of Pumps, Gear boxes, Compressors, Belts, Grinders, Crushers, Vibrating screens and other mechanical & Hydraulic base equipment maintenance. In Project stage

Erection and Commissioning of Coal Handling system Dust Extraction System at Bunker and Dense Fog Dust Suppression & DFS System all through the Conveyor.

Wagon Tippler Dumping Chute Inside Liner Plate Fixing or Increase The System Reliability Purpose

Reduction in downtime by effective industrial maintenance practice. MAJOR ACHIEVEMENTS:

Providing 100 % system & 95% Equipment’s availability.

Build the team of Mechanical Maintenance and motivate them to acquire knowledge and complete the target within given time.

Started Knowledge Sharing activities to maintenance group to minimize errors in Operation & Maintenance.

Preparing the HWA, SPR, QAP, FQP, Method statements, reports and collecting the data, drawings, regarding the site execution works.

Preparing the work orders of the contractor and plan the proper mobilization site.

Preparation of Planning Schedules for the fabrication and erection.

Attending the meetings with the JPL Officials regarding site works.

Preparing the list of drawings released and drawings for approval.

Successfully CHP Area Bunker Floor Conveyor -5A (530 M) Belt replacement.

Successfully CHP Area Bunker Floor Conveyor -4B (430 M) Belt replacement.

Successfully MCHS Unloading 72000 MT in 40 Hrs. (Ship Un Loader)

Successfully SUL Open &close, Trolley, Hold rope replaced in 32 Hrs. GROWTH CHART

JAN – 2014 To JULY-2014 : ASST.STORE INCHARGE (Erection Project Central Main Store) JULY- 2014 To FEB -2016 : JUNIOR ENGINEER

FEB – 2016 To JULY 2020 : ASST. ENGINEER

JULY-2020 To Still : ENGINEER

KEY DELIVERABLES

RESUME: MECHANICAL ENGINEER

As a DET and Engineer at Ayoki fabricon PVT.LTD.

Erection and commissioning of Coal Handling system (1400 TPH, conveyor length 1.5 km), Dust Extraction System at crusher House and Dust Suppression System at Crusher House and all along the Conveyor ).

Preparation of protocols, documents related to the jobs.

Leading the team of Co-Junior Engineer, Operators and technicians for proper running of the system.

Carrying out the preventive maintenance as per schedule.

Ensuring the work quality and safety aspect at workstation.

Knowledge of hydraulic related valves, pump, overhauling & maintenance. Maintenance / Troubleshooting

Implementation of predictive & preventive maintenance schedules for various equipment’s to increase machine up time & equipment reliability.

Implementing maintenance schedules and carrying out periodic checks to ensure performance of various equipment’s and maintaining requisite documents for the same.

Identifying areas of bottlenecks / breakdowns and taking steps to rectify the equipment’s through application of troubleshooting tools like root cause analysis (RCA). EDUCATIONAL SCAN

Exam Institute Board

Year of

Passing

Percentage

DIPLOMA

(MECHANICAL)

MRK POLYTECHNIC

MANAGEMENT & Technology

N.C.T.E A-2013 68.00%

Xth R.C.T.H.S.S S.S.L.C Mar-2009 47.00 %

PERSONAL DOSSIER

Date of Birth : 13.May.1994

Current address : Karaikal port .pvt .ltd Karaikal Permanent Address : Annamalai

S/O –Baskar.K,

282 2nd cross, Sivajothi nagar

Chidambaram-608001

Phone No. : +919*********

Gender : Male

Material Status : Unmarried

Nationality : Indian

PROFESSIONAL REFERENCES

NOTICE PERIOD FOR JOINING : 15 Day

I consider myself familiar with engineering aspects and confident of work in a team with my ability. I hereby declare that the information furnished above is true to the best of my knowledge. I am submitting above bio data for your kind consideration and necessary action .Looking forward for your reply.

DATE :