I am an ambitious Civil Engineer who has gained valuable experience and skill whilst working in the Rail and Construction domains. Also a determined individual who would like to progress and attain to project management status.
Educational Qualifications
Sep 2007 – June 2009 BEng (Hons) Civil Engineering University of East London 1st Class
Sep 2005 – June 2007 HND Civil Engineering University of Greenwich
Employment
Feb 2021 – Ongoing Engineer: CRSA (Central Rail System Alliance) – Kings Cross Blockade
October 2020 – Feb 2021 Engineer: Trackwork – Ipswich Yard Depot
Setting up for slab track and ballasted track
March 2020 – October 2020 Engineer: Osborne – Maidstone East Station
Setting levels for digs for drainage, footing, stairs, draw pit, lighting column and slab
Setting out slab edge and level.
Setting out for retaining wall.
Setting out for stairs, door level and walls internally, for footing and for planters
Marking gridline for baseplates for steelworks
September 2020 – October 2020 Engineer: Smarttrax – Mania installation of new timber beam (weekend)
Marking location and baseplate and bolt location for the beam
Lining and level track
November 2019 – March 2020 Engineer: Osborne – Embankment (Brookwood,Ashmead and Epsom stabilisation)
Carrying out daily track monitoring
Setting out for sheet pile
Setting out gabion and reno mattresses
Setting out catch pit, troughing and walkway
Topo Survey and CAD As built
Christmas Platform Track renewal (York)
Feb 2019 – June 2019 Lead Engineer: Cleshar – London Trams 1300m Track Renewal
Carrying out Verification Survey
Producing Relatives prior to the weekend’s renewal
Installing Retro target throughout the site
Using 3D dozing for formation and bottom ballast
Creating ALC file and tamping
Producing As built for digs, bottom ballast and tamping for ITP
July 2018 – Jan 2019 Site Pway Engineer: Trackwork – Engineering cover across UK
NEXUS BLOCKADE – setting 3D dozer for dig, marking for IBJ, Hollow bearer position and using PEMs and LEMS to install modular panel and tamping.
PRIORY LANE – BRIDGE REPLACEMENT CHRISTMAS BLOCKADE - 60mTrack Renewal and 100m tamping
YEE TREE – BRIDGE REPLACEMENT WEEKEND CLOSURE – 80m renewal both line and 200m tamping
FILTON BANK – 3000m tamping on both road
YORK – installing S N C, Slab Track and weekend closure installing Tandem.
Tamping and verification survey throughout various sites
June 2018 – July 2018 Senior Engineer: TXM Rail – Isle of Man
Basic Track renewal, Manual jacking and packing Track.
March 2018 – May 2018 Site Pway Engineer/ Trackback (Mentoring) – ( Worcester Shrub - Hitachi)
Installing Footpath, Troughing and lighting column
Installing UTX, monitoring and inspecting track for any movement
Filling A to G form for Trackback
70m Track renewal
July 2017 – March 2018 Pway Engineer: Track Work (Crossrail – Old Oak Common Depot)
Checking Ballast level prior to installing sleepers
Providing Reference line and respacing sleepers for the Rose Hill crossing
Setting out Concrete Edge Beam for the Rose Hill Crossings
Setting out for cut to suit for IBJ and joints
July 2017 (1-week work) Site Engineer: Stobbart Rail (SNC Alliance - Track Drainage- Manchester)
Provided offsets from back edge of track and chainage for locations of the catchpits
Setting up laser level, providing height and gradient for the track drainage.
September 2016 – May 2017 Pway Engineer: Track Work (Crossrail - Ilford Yard Stabling Project)
Checking Ballast level prior to installing sleepers
Setting out for 21-point ends of which included a scissors unit and 4 double slips
Setting out 2530m of plain line track
Setting out, levelling and gauging 200 m of Edilon embedded rail
Providing centre line for 6 bogie turntables
Setting out for H10 baseplates on pit walls
Creating Geometry and front offset file for tamping
Gauging for tight curves
Producing final As builts which includes joint register, QF 147 S & C inspection document, QF 147 handover ballast formation document and final as built document.
August 2016 – September 2016 Site Engineer: Pod-Trak Ltd (Crossrail - Ilford Yard Stabling Project)
Setting out manholes, catchpits and UTX.
Lining up manholes and catchpits using reference line.
Setting out dig and ballast level using graded laser.
Setting out trough route.
November 2015 – August 2016 Foundation Engineer: Amey Rail (Great Western Electrification)
Installing foundation for the OLE
Carrying out As built analysis of the OLE foundation in readiness for installation of steelwork.
Site survey in preparation for the installation of Piles
Analysis the latest design in conjunction with the current design.
May 2013 – November 2015 Delivery Engineer: Balfour Beatty Rail (Track Partnership)
Embedded into Transport for London 4LM
Analysing designs, survey data and participation at design reviews.
Create programme of works for weekend possessions (includes staging diagram, train matrices and time chainage).
Production of Method Statements, Risk Assessments and Permits to Dig.
Conduct weekend engineering activities Ballast Track Renewal and Points and Crossing works.
Setting up 2D and 3D lasers for dozer.
Carrying out as built for tamper.
Producing as-built documentation.
March 2012 – May 2013 Surveyor: Warner Land Surveys Ltd
Carrying out one man engineering activities during weekend closures - monitoring of Snow Hill Tunnel using sets of angles and ATR with different prism constant and processing the data using Liscad software.
Surveying Viaduct in Newport using Scanner
Surveying Rail Gauge and Datum plates
Traversing and surveying stations for construction of lift and then carrying out scanning
Carrying out platform gauge with Abtus Bar and measuring cant with cant bar.
Using AutoCAD 2D to carry out dimension works.
June 2011- Sept. 2011 Junior Engineer: Birse Metro
` East London Line Phase 2
Marking out chainage with pegs for reference use
Monitoring arch bridge movement after concrete pour
Making profile for dig level, making batter rails to batter the earth’s to the required slope level
Marking out areas that needs to be plied so crushes can be filled for the pilers
Establishing areas that are being sheet piled to allow temporary support for further excavation
Oct 2010 – Feb. 2011 Engineer: Heyrod Construction
Athletes Village Plot N11 (Olympics)
Calculation of concrete volumes.
Making concrete cubes and filling up cube sheets.
setting up laser level for decking, groundwork and level of concrete.
Assisting engineer in setting out ground beam, columns, walls, boxes, slab edge, pipes, manholes, air vents.
Assist engineer with lift shaft plumbing and stair walls.
Use of different grids as the building itself it was not completely squared.
Other Skills
Working knowledge of Microsoft Office (Word, Excel, Access, Outlook PowerPoint)
AutoCAD
ALC File for tamping
Training and Professional Affiliations
Institute of Civil Engineers (ICE) 2006
PTS card 667472
Basic Track Awareness 146964
LU Access 340870/2
London Trams Pink Ticker 8860
Permanent Way Education A Class
Permanent Way Education B Class
OLEC 1
ICI Induction
Trackback Certification
Interests & Activities
Construction news and developments
Reading – particularly the subjects of Theology and astronomy
References available upon request