Post Job Free

Resume

Sign in

Snow Hill Civil Engineer

Location:
Sheffield, South Yorkshire, United Kingdom
Posted:
June 30, 2021

Contact this candidate

Resume:

Mohammed Zaman

Contact Telephone: 078**-***-*** Contact Email: adnggv@r.postjobfree.com

Address: London, SE18 5HL

I am an ambitious Civil Engineer who has gained valuable experience and skill whilst working in the Rail and Construction domains. Also a determined individual who would like to progress and attain to project management status.

Educational Qualifications

Sep 2007 – June 2009 BEng (Hons) Civil Engineering University of East London 1st Class

Sep 2005 – June 2007 HND Civil Engineering University of Greenwich

Employment

Feb 2021 – Ongoing Engineer: CRSA (Central Rail System Alliance) – Kings Cross Blockade

October 2020 – Feb 2021 Engineer: Trackwork – Ipswich Yard Depot

Setting up for slab track and ballasted track

March 2020 – October 2020 Engineer: Osborne – Maidstone East Station

Setting levels for digs for drainage, footing, stairs, draw pit, lighting column and slab

Setting out slab edge and level.

Setting out for retaining wall.

Setting out for stairs, door level and walls internally, for footing and for planters

Marking gridline for baseplates for steelworks

September 2020 – October 2020 Engineer: Smarttrax – Mania installation of new timber beam (weekend)

Marking location and baseplate and bolt location for the beam

Lining and level track

November 2019 – March 2020 Engineer: Osborne – Embankment (Brookwood,Ashmead and Epsom stabilisation)

Carrying out daily track monitoring

Setting out for sheet pile

Setting out gabion and reno mattresses

Setting out catch pit, troughing and walkway

Topo Survey and CAD As built

Christmas Platform Track renewal (York)

Feb 2019 – June 2019 Lead Engineer: Cleshar – London Trams 1300m Track Renewal

Carrying out Verification Survey

Producing Relatives prior to the weekend’s renewal

Installing Retro target throughout the site

Using 3D dozing for formation and bottom ballast

Creating ALC file and tamping

Producing As built for digs, bottom ballast and tamping for ITP

July 2018 – Jan 2019 Site Pway Engineer: Trackwork – Engineering cover across UK

NEXUS BLOCKADE – setting 3D dozer for dig, marking for IBJ, Hollow bearer position and using PEMs and LEMS to install modular panel and tamping.

PRIORY LANE – BRIDGE REPLACEMENT CHRISTMAS BLOCKADE - 60mTrack Renewal and 100m tamping

YEE TREE – BRIDGE REPLACEMENT WEEKEND CLOSURE – 80m renewal both line and 200m tamping

FILTON BANK – 3000m tamping on both road

YORK – installing S N C, Slab Track and weekend closure installing Tandem.

Tamping and verification survey throughout various sites

June 2018 – July 2018 Senior Engineer: TXM Rail – Isle of Man

Basic Track renewal, Manual jacking and packing Track.

March 2018 – May 2018 Site Pway Engineer/ Trackback (Mentoring) – ( Worcester Shrub - Hitachi)

Installing Footpath, Troughing and lighting column

Installing UTX, monitoring and inspecting track for any movement

Filling A to G form for Trackback

70m Track renewal

July 2017 – March 2018 Pway Engineer: Track Work (Crossrail – Old Oak Common Depot)

Checking Ballast level prior to installing sleepers

Providing Reference line and respacing sleepers for the Rose Hill crossing

Setting out Concrete Edge Beam for the Rose Hill Crossings

Setting out for cut to suit for IBJ and joints

July 2017 (1-week work) Site Engineer: Stobbart Rail (SNC Alliance - Track Drainage- Manchester)

Provided offsets from back edge of track and chainage for locations of the catchpits

Setting up laser level, providing height and gradient for the track drainage.

September 2016 – May 2017 Pway Engineer: Track Work (Crossrail - Ilford Yard Stabling Project)

Checking Ballast level prior to installing sleepers

Setting out for 21-point ends of which included a scissors unit and 4 double slips

Setting out 2530m of plain line track

Setting out, levelling and gauging 200 m of Edilon embedded rail

Providing centre line for 6 bogie turntables

Setting out for H10 baseplates on pit walls

Creating Geometry and front offset file for tamping

Gauging for tight curves

Producing final As builts which includes joint register, QF 147 S & C inspection document, QF 147 handover ballast formation document and final as built document.

August 2016 – September 2016 Site Engineer: Pod-Trak Ltd (Crossrail - Ilford Yard Stabling Project)

Setting out manholes, catchpits and UTX.

Lining up manholes and catchpits using reference line.

Setting out dig and ballast level using graded laser.

Setting out trough route.

November 2015 – August 2016 Foundation Engineer: Amey Rail (Great Western Electrification)

Installing foundation for the OLE

Carrying out As built analysis of the OLE foundation in readiness for installation of steelwork.

Site survey in preparation for the installation of Piles

Analysis the latest design in conjunction with the current design.

May 2013 – November 2015 Delivery Engineer: Balfour Beatty Rail (Track Partnership)

Embedded into Transport for London 4LM

Analysing designs, survey data and participation at design reviews.

Create programme of works for weekend possessions (includes staging diagram, train matrices and time chainage).

Production of Method Statements, Risk Assessments and Permits to Dig.

Conduct weekend engineering activities Ballast Track Renewal and Points and Crossing works.

Setting up 2D and 3D lasers for dozer.

Carrying out as built for tamper.

Producing as-built documentation.

March 2012 – May 2013 Surveyor: Warner Land Surveys Ltd

Carrying out one man engineering activities during weekend closures - monitoring of Snow Hill Tunnel using sets of angles and ATR with different prism constant and processing the data using Liscad software.

Surveying Viaduct in Newport using Scanner

Surveying Rail Gauge and Datum plates

Traversing and surveying stations for construction of lift and then carrying out scanning

Carrying out platform gauge with Abtus Bar and measuring cant with cant bar.

Using AutoCAD 2D to carry out dimension works.

June 2011- Sept. 2011 Junior Engineer: Birse Metro

` East London Line Phase 2

Marking out chainage with pegs for reference use

Monitoring arch bridge movement after concrete pour

Making profile for dig level, making batter rails to batter the earth’s to the required slope level

Marking out areas that needs to be plied so crushes can be filled for the pilers

Establishing areas that are being sheet piled to allow temporary support for further excavation

Oct 2010 – Feb. 2011 Engineer: Heyrod Construction

Athletes Village Plot N11 (Olympics)

Calculation of concrete volumes.

Making concrete cubes and filling up cube sheets.

setting up laser level for decking, groundwork and level of concrete.

Assisting engineer in setting out ground beam, columns, walls, boxes, slab edge, pipes, manholes, air vents.

Assist engineer with lift shaft plumbing and stair walls.

Use of different grids as the building itself it was not completely squared.

Other Skills

Working knowledge of Microsoft Office (Word, Excel, Access, Outlook PowerPoint)

AutoCAD

ALC File for tamping

Training and Professional Affiliations

Institute of Civil Engineers (ICE) 2006

PTS card 667472

Basic Track Awareness 146964

LU Access 340870/2

London Trams Pink Ticker 8860

Permanent Way Education A Class

Permanent Way Education B Class

OLEC 1

ICI Induction

Trackback Certification

Interests & Activities

Construction news and developments

Reading – particularly the subjects of Theology and astronomy

References available upon request



Contact this candidate