Post Job Free

Resume

Sign in

Chevron Phillips Co Ltd

Location:
Sharjah, United Arab Emirates
Posted:
June 30, 2021

Contact this candidate

Resume:

Zoheb M. A. Suvarnadurgakar

Piping Engineer (Site)

- Flat 2909, A-block, Al Qadesia Tiger Building, Al Nahda, Sharjah, U.A.E

+971-********* adngdu@r.postjobfree.com

EDUCATION

BE Mechanical

Finolex Academy of Management &

Technology, University of Mumbai.

Diploma in Mechanical Engg.

Maharashtra State Board of Technical

Education

PG Dip. In Piping Engineering

Suvidya Institute of Technology.

OBJECTIVE

To seek a challenging career in the industry that enables me to utilize my skills and to offer efficient services to my employer while looking to gain exposure in a respectable organization, with great value.

SKILLS

Isometrics

P&ID

AutoCAD

MS Office

SP3D

STRENGTH

Good at hands on jobs, fast learner, flexible, positive attitude, hardworking and a keen observer.

Manage various key operations gaining insightful exposure of overall Piping & Structural Fabrication,

Erection and various site management functions.

Familiar with various piping & structural materials like Stainless steel, Alloy steel, Carbon steel, Low Temperature Carbon Steel etc.

Familiar with application of International Standards for process piping like, ANSI/ASME B31.3, and ASTM

specifications, with basic knowledge of ASME B16.5, ASME B16.9, ASME B16. 11 etc.

Familiar with interpretation of P&I Diagrams, Piping Isometrics and Pipe Support Specifications based on pre-designed Piping Line Classes.

Familiar with FRP/RTR & HDPE piping.

Familiar with structural works.

Able to generate Detailed Structural Drawings for fabrication.

Able to generate Piping Drawings and Isometrics for construction, fabrication and erection.

Able to procure materials required for piping & structural works.

Able to solve construction problems and difficulties arising due to discrepancies in design or material incompatibility.

Assisting Estimation team by conducting site visits & preparing BOQs.

Able to make As-Built drawings for final submission based on the changes made in original IFC.

PERSONAL DETAILS

First Name : Zoheb Mohammed

Father’s Name : Anwar

Last Name : Suvarnadurgakar

Date of Birth : 21st April, 1984.

Gender : Male.

Marital Status : Married.

Nationality : Indian.

Religion : Islam.

Languages : English, Hindi

Passport : T 8974164

Expiry Date : 08th Oct 2029.

Permanent Add : ‘Baitul Safa’

H. No. 72-B,

At Post New Karla,

Ratnagiri,

Maharashtra, India.

Pin – 415612.

HOBBIES

Photography

Travelling

Videography

PROFESSIONAL EXPERIENCE

Over 8 years of experience in the field of Oil & Gas, with over 6 years in Engineering, Fabrication, Execution and assistance in Estimation works in various Refineries and Petrochemical Plants. Arabian Global Sources, KSA. [November 2018 – July 2020 (1 Year, 8 Months)] Piping Engineer

Conduct a site visit to assist the estimation.

Prepare BOQ & estimate the materials, manpower & equipment required for project for bidding purpose.

Oversee timely and effective execution of piping installation / plant modification work within the scope of improvement projects at all facilities.

Preparation of Method statements for Piping

fabrication, execution, hydro testing and/or any

other 3rd party special requirements like painting, insulation, hot tapping, etc.

Prepare and review mechanical installation related documentation including method statements, work

instructions, material approval requests in particular prior to forwarding same for approval.

Preparation of MTO & procuring the materials

required.

Preparation of weld mapping & markup P&ID’s for

fabrication & hydro testing respectively.

Plan and coordinate the activities and resources at the construction site to ensure effective coordination and supervision of construction/modification project works.

Subcontracting third party services like painting, insulation, hot tapping, etc.

Preparation of Red-line drawings of changes made during execution after Clients approval.

Preparation of as-built drawings for final submission.

Assist in project documentation completeness with regards to pre-commissioning, commissioning and

hand over to Client.

Shutdowns

Client: Ma’aden Phosphate. (PAP TRAIN ‘C’ TAM)

Blinding & De-blinding

Removal & reinstallation of vessels for repair.

Replacement & repair of piping at various locations

Removal & reinstallation of various types valves with different sizes for maintenance.

Removal & reinstallation of PSVs for calibration.

Gear box, agitator removal & installation, etc.

Client: Advance Petrochemical Company

(APCC).

Blinding & De-blinding

Removal & re-installation of 36 Ton Kubota

valves for reactor.

Valves & Actuator replacement.

Heat Exchangers hydro jetting & cleaning.

Fin fan hydro jetting & cleaning.

PSV, manual valve & 3-way valve removal &

replacement.

Pipeline inspection & cleaning.

Client: Ibn Rushd (SABIC). (Aromatic Static

Maintenance TA 2019)

Blinding & de-blinding, installation of

ventilation & illumination, opening of

manway/manhole, opening of tray-manway,

internal cleaning, jetting, vacuum out of

contaminated water, power brush cleaning

of welding joints & T-joints, repair as per

inspection recommendations, cleaning &

repair of burners, cleaning & repairing of air &

fuel gas duct, etc. of various columns (17 no),

vessels (8 no), drums (16 no), pit & sump (6 no),

heater (5 no).

Projects

SABIC E&PM Projects

Client: Saudi Kayan (Al Jubail, KSA)

Divert C3 recycles to Ethane Feed. (Piping)

Fabricate & install 3” piping & secondary pipe

supports

Client: Saudi Kayan (Al Jubail, KSA)

Modification of vent lines of EO Scrubber.

(Piping & Structural)

Fabricate & install structure, 3” & 6” piping &

pipe supports

Client: Saudi Kayan (Al Jubail, KSA)

Installation of 5 Flow Meters on All Elevated

Flare Lines of U&O Plant

Fabricate & install 2” piping.

AYTB Co Ltd, Jubail, KSA [May 2014 – January 2018 (3 Year, 8 Months)] Piping Engineer

Oversee timely and effective execution of piping installation / plant modification work within the scope of improvement projects at all facilities.

Preparation of Method statements for Piping

fabrication, execution, hydro testing and/or any

other special requirements like painting, insulation, hot tapping, etc.

Prepare and review mechanical installation related documentation including method statements, work

instructions, material approval requests in particular prior to forwarding same for approval.

Ensure the works are carried out in accordance with project specifications, relevant policies and

procedures, method statements and project

schedules.

Preparation of weld mapping & markup P&ID’s for

fabrication & hydro testing respectively.

Preparation of MTO & procuring the materials

required.

Plan and coordinate the activities and resources at the construction site to ensure effective coordination and supervision of construction/modification project works.

Preparation of packages for pipe spool & support fabrication.

Subcontracting third party services like painting, insulation, hot tapping, etc.

Interface and coordinate closely with sub-

contractors to monitor effective progress of third party activities like painting, insulation, hot tapping, etc.

Preparation of Red-line drawings of changes made during execution after Clients approval.

Preparation of as-built drawings for submittal.

Participate in regular Site Progress Meetings with contractors to review progress and performance.

Assist in project documentation completeness with regards to pre-commissioning, commissioning and

hand over to Operations.

Shutdowns

Perform various Tie-In activities for the above

mentioned projects (S-Chem T/A 2016).

Perform Tie-In activities for Standby Charcoal

Filter Project.

Demolish, fabricate & install the inlet & outlet SS piping of the sight glass located at various

columns & equipment. (Total 124)

Projects

Parallel Ethane Line

Client: Saudi Chevron Phillips (Al Jubail, KSA)

Fabricate & Install 20” Parallel Ethane Line on the pipe rack.

Totally Enclosed Ground Flare

Client: Saudi Chevron Phillips (Al Jubail, KSA)

Phase 1- Erection of the Ground Flares & Piping

works associated with it

Phase 2- Procure, Fabricate & Install all the

structural & piping works on the pipe rack

connecting from the Ground Flares to the Existing

Lines.

Ethane feed Pressure Control Valve Project

Client: Saudi Chevron Phillips

Fabricate & Install 12” Ethane Feed By -Pass Line

on the newly erected pipe rack.

Auxiliary Boilers Project

Client: Saudi Chevron Phillips (Al Jubail, KSA)

Erect the two auxiliary boilers.

Procure, Fabricate & Install of all the piping &

structural works associated with the boilers.

Ethane to Propane Jumper Project

Client: Saudi Chevron Phillips (Al Jubail, KSA)

Fabricate & Install 12” piping over the new pipe

rack.

Off-Spec Ethylene to Flare Project

Client: Saudi Chevron Phillips (Al Jubail, KSA)

Fabricate & Install 12” piping over the pipe rack

& carry out the hot-tapping operation along with

the hot-tap contractor.

Dense Phase Water Removal Project

Client: Saudi Chevron Phillips (Al Jubail, KSA)

Fabricate & Install 12” SS piping over the pipe rack from/to KO Drum to/from 20” header.

Standby Charcoal Filter Project

Client: Saudi Chevron Phillips (Al Jubail, KSA)

Erection of the Charcoal Filter. Fabricate & install 6” CS piping from the Filter to the headers

including one hot tapping.

Polished Condensate Pump Project

Client: Saudi Chevron Phillips (Al Jubail, KSA)

Installation of the pump for Polished Condensate

Tank. Fabricate & install 8” & 10” CS piping to &

from the pump. The inlet & outlet of the pump

connects to the header with two hot tapping.

Hind Geophysical Services Pvt. Ltd. [April 2012 – March 2014 (1 Year, 11 Months)] Source Mechanic

Worked on-board the seismic survey vessel, R/V Geo Hindsagar (formerly Geo Baltic) as a Seismic Source Mechanic.

Responsible for proper operation of Sercel G-guns (150cu.in, 250cu.in and Mini G-guns) and LMF High Pressure Air Compressors (LMF 31/138-207D (CAT 3508 prime mover)).

Responsible for proper maintenance of piping system for Seismic Guns and Hydraulic Equipment.

Work includes deployment & recovery of the gun arrays, wide tow doors (Baro -vane) and other in-sea it

Accent Technosolutions [October 2011 – April 2012 (06 Months)] Piping Engineer (Isometric Checker)

Checking & inspecting all the isometrics before issuing for construction.

Checking all the instruments on isometric from P&ID.

Checking the routing of the lines from plot plan & also from the 3D model on Naviswork. AYTB Co Ltd, Jubail, KSA [July 2010 – July 2011 (1 Year)] Junior Engineer (Piping)

Review P&ID, Isometrics.

Final Material take-off from IFC drawing.

Review all references such as approved construction drawings, layout, location, coordinates and interpretation of Codes, Specification & Standards.

Weld mapping and spooling using Acorn Pipe System Software.

Prepare fabrication drawing based on the IFC drawing.

Review and check fabrication drawings in reference to dimension and material specifications.

Prepare As-Built Drawings.

Review and check As-Built Drawings



Contact this candidate