Post Job Free

Resume

Sign in

Pipeline Engineer

Location:
National Institute of Technology, Tamil Nadu, India
Posted:
July 01, 2021

Contact this candidate

Resume:

Page * of *

CURRICULAM VITAE

M.SENTHIL KUMAR

Email id : adng2o@r.postjobfree.com

Mobile : +919********* /+91-957*******

CAREER SUMMARY:

Having 14 years (GCC Exp.9 years) of Experience in Construction Management and Site Engineering in the Industry like Oil& Gas, Petrochemical & Power Plant with Green & Brown field, up, mid & downstream Projects. CAREER OBJECTIVE:

To executive with leading position in Construction field, to work in multidisciplinary challenging and creative environment with strong zeal towards Achievement of Goals.

ACADEMIC DETAILS

1998-2002 Bachelor of Engineering (Mech) Annamalai University, IndiaFirst Class-74.83% 2002-2003 P G Diploma in Thermal Power Plant Engineering @ NPTI, Neyveli. India SOFTPROFICIENCY MS Office 2010 & Windows 07/XP.

PROFESSIONAL HIGLIGHTS:

Sr.No Project Handle Position Client Company

1

RHIP– Wellheads & Station

Piping, Class1 Off plot Pipeline,

Pre Shutdown & Shutdown

work, Harweel, OMAN.

ODC-GB- Producer & Injection

Station Piping, Off-Plot

Pipeline/ GRE Flowline

Sr. Engineer-

Site(Mechanical)

Petroleum

Development

Oman(PDO) &

OGC

AL TASNIM,

OMAN

(Sep 2015 to

Feb2021)5.4yrs

2

Wasit Gas Plant Facilities

Program, PKG#1,Train-300,

Saudi Arabia.

Piping Engineer

Saudi ARAMCO/

S K E&C

Gulf Sky Cranes

Saudi Arabia.

(Jan2014 - Apr

2015)1.3yrs

3

NZLD Utility WWTP & Piping

Project, Equate Petrochemicals,

Kuwait.

Replacement of Mist Eliminator

for Equate Petrochemicals,

Kuwait.(Shut Down)

New Flare Gas recovery Unit

Piping & Structure for KNPC

(Ahamadi Refinery) Kuwait.

Mechanical

Supervisor

Equate

Petrochemicals

L&T (MRU) /

Equate

Petrochemicals

KNPC - MAA

Refinery

Gulf SPIC,

Kuwait

(Jul2011 to

Aug 2013)-

2.2yrs

4

Construction Work for 6 x 135

MW Power Plant at Angul,

Orissa, India.

Construction Work for 9 x 135

MW Power Plant at Jharsuguda,

India.

Erection

Engineer/Junior

Engineer

JSPL Power Plant

Vedanta Alumina

Power Plant

EDAC Engg. Ltd,

Chennai.

(Jan 2008 to

Mar 2011)-

3.2yrs

5

Construction of 2 x 120 TPH

Boilers at Raigarh.

Construction of 4 x 36 TPH

Boilers at Durgapur, India.

Engineer Trainee

Monnet Ispat&

Energy

Sri Ramrupai

Balaji Steels and

Power

Cethar Vessels

Ltd, Trichy.

(Nov2005 to

Nov2007)-2yrs

Page 2 of 6

KEY SKILLS:

Manages Interface and communication processes between Client, Vendor, Sub contractor, Project Manager and Site Team.

Ensure changes to technical specifications are up to date and appropriately captured in engineering and related documentation.

Able to prioritize the work load and to meet deadlines under pressure.

Experienced in FEED, PMC and EPC projects.

Handle different piping materials like CS, CRA, LTCS, SS, LTCS+ Clad, GRE, and Rotoline spools -HDPE.

Good in PTW coordination & Ensure all safety practices as per project safety manual are implemented and take corrective action.

Accept additional responsibilities without previous experience and learning new skills /tasks quickly.

Excellent communication Managerial and Interpersonal skills ability to get along well both individually and part of team.

Ability to work in multi-disciplinary/multi-cultural/multi-national teams and to contribute towards the achievement of team targets.

Multi Skilled and Highly Flexible.

Expert in Executing Structure, Piping and Pipe support fabrication, blasting, painting

& Class1GRE Flow line and CS pipeline installation with HSS Coating application.

Knowledge of all Structure, Supports &Piping Related drawings of Isometrics, P&ID/PEFS,GA, Plot Plan and Vendor Drawings.

Knowledge of all Pipeline/Flow line Routing Diagram-Key plan & Alignment sheets.

Understand all Lifting Schematics and safety procedure & Expert in preparation of Rigging Plan and TRA –Certified NPORS Appointed Person.

Conversant with codes standard and Project Specification.

Good Exposure of Piping Tie in & Shutdown Work.

Knowledge of different type of Piping materials and their specification. ACHIEVEMENTS:

Maintaining a smooth flow of work between the departments and resolving interdepartmental conflicts.

Resource Planning and arranging in time.

Prioritize the work load and to meet deadlines under pressure.

Good Compliance towards HSE while Executing of job.

Proactive and cautious in avoiding rework and delivering Quality output.

Immediate attention and completion of punch points raised by client during daily site visit in time.

Page 3 of 6

DETAILED JOB PROFILES

Previously Worked @ Duration: Sep2015 to Feb 2021 Company : Al TASNIM Enterprises L.L.C.

Site : RHIP, Harweel, Oman.

Designation : Sr. Engineer-Site Construction.

Jobs Handled :

Reviews work schedules/ plans, identifies opportunities to improve performance, reduce costs, maximize use of resources etc.

Follow with daily progress reports with site team and review with project schedule and closely monitor to complete job before deadlines.

Attend and contribute to site and project technical meetings as necessary.

Contract Management, Field Engineering, Data Management, Equipments Management, Manpower Management, Procurement co ordination and Sub- Contractor management for delivering the project in time.

Wellheads and Station (HMPS, RGMS & RIMS) Installation of Structure, Piping & Pipe supports, Pre Fabrication Scope Preparation & Execution follow up of Work includes MTO, fabrication and NDT follow up, Blasting, Painting & Installation follow up .

Preparing Method Statement for various activities with respect to Project Specification and Client procedure.

Scope Identification & Test Pack Preparation for Strength Test & Leak Test.

Pre shutdown piping installation & Shut down Tie-in Preparation and Executing.

Preparation and conducting hydro test as per test pack for on plot piping, Off-plot CS pipeline & GRE flow line.

Insulation & Refractory scope identification and subcontract follow up for personnel protection and heat conservation insulations and refractory installation.

Pre-Commissioning of Mechanical & piping Systems with N2He leak test, Assist Vendor servicemen with their activities.

Off-plot various Class1 Pipeline, GRE flow line work execution and Testing Preparation.

Follow up of Touch up painting, Pipe marking and color coding.

Punch list closeout and preparing for Mechanical completion

Preparation and submission of Red Line Mark Up drawings and Material Reconciliation Reports.

PTW Coordination with PA and PH and Site Follow Up with PA for Execution with Compliance of HSE requirements and Quality Control. Project scope carried out:

Harweel Main Production Station - 1

(New facilities construction and hook up)

Block Valve Station - 1

Remote Gathering Manifold Station - 4

Remote Injection Manifold Station - 3

Deep Water Disposal wells - 2

Sour Gas Injection Well Pads - 18

Oil & Gas Production Well Pads - 29

Page 4 of 6

CS & GRE U/G Class1 Pipe lines - 279 KM approx.

Previously Worked @ Duration: Jan 2014 to Apr 2015 Company : Gulf Sky cranes & Construction Company W.L.L, Site : Wasit Gas Program, PKG#1, TR# 3, KSA.

Designation : Piping Engineer.

Jobs Handled :

Executing erection of AG CS,SS & LTCS Piping, Structure & Pipe supports, Installation of Vessel Stand Piping & Valves.

Hydro Testing, Pre-commissioning, Reinstatement Package Preparation and Punch closing of various piping and pipelines.

Advise on construction methodologies i n coordination with other disciplines/contractors/subcontractors prior to construction. Piping erection/Hydro test/Layup work and Erection of Equipment & Structural Steel &Supports.

Assigning targets and monitoring progress completion of jobs by Supervisors, Foreman and Subcontractors

Previously Worked @ Duration: Jul 2011 to Aug 2013 Company : Gulf Spic Trading & Contracting Company W.L.L, Kuwait Site1 : Equate Petrochemical Company, nZLD Project, Kuwait Site2 : KNPC MAA (Ahamadi Refinery), New Flare Gas Recovery Unit Project, Kuwait

Designation : Mechanical Supervisor-Piping.

Jobs Handled :

Executed prefabrication activities of Structural, Piping and Pipe Supports.

PTW Receiver from Client and Site Follow Up for Execution with Compliance of HSE requirements and Quality Control.

Monitoring erection of ISBL Piping, above ground & Underground Piping works from WWT plant to WWRP Building w.r.t G.A, Plot Plan, Spool sheet and Isometric drawings.

Pre shut down piping installation & Shut down Tie-in preparation and Executing.

Erection and Alignment of Piping Structure steels.

Mechanical completion of Hydro test packages, liquidating the punches and turning over System wise.

Coordinating with Client for Shut down, Tie-in and Pre-commissioning Activities.

Advise on construction methodologies in coordination with other disciplines/contractors/ subcontractors prior to construction

Providing full and extensive job instruction (Plan, Execute, Inspection arrangement, Material arrangement & Reconciliation) to my team.

Executed the works according to the latest approved revision of drawings and /or instruction of authorized authorities.

Follow up of progress planning and arranging all its requirements.

Monitoring of Subcontractor’s performance

Previously Worked @ Duration: Jan 2008 to Mar 2011 Company : EDAC Engineering Ltd, Chennai

Site: 1 : JSPL 6 x 135 MW Power Plant at Angul, Orissa, India. Designation : Erection Engineer

Jobs Handled:

Planning & executing Piping erection activities and monitoring day to day progress Page 5 of 6

Site 2:Vedanta AluminaLtd, 9 x 135 MW Power Plant at Jharsaguda, Orissa. Designation : Junior Engineer

Jobs Handled :

Following Erection & Alignment of Interconnecting Piping works in Boilers, Feed water piping and Steam piping

Actively involved in timely completion of the Boiler Drum Lifting by strand jacks.

Successfully achieved maximum Unit tonnage per day and month compare to other units.

Bagged the cash incentives / awards for achieving set target on erection tonnage.

Resource availability in time, Getting Clearance for the completed activity/ next activity to start from QA/QC Department and from the

Client side. Arranged necessary Data’s and Document to Contractor from the Planning and Materials Department.

Maintaining a smooth flow of work between the departments and resolving interdepartmental conflicts.

Previously Worked @ Duration: Nov 2005 to Nov 2007 Company : Cethar Vessel Ltd, Trichy, India.

Site: 1.Monnet Ispat& Energy Ltd, Raigarh, Chhattisgarh, India. 2. Sri Ram RupaiBalaji Steels & Power Ltd, Durgapur, W.B. Designation : Engineer Trainee

Jobs Handled:

Erection and alignment of boiler and interconnecting piping, steam & feed water piping Installation.

Supervision of Site erection activities by adhere to Safety and Quality requirements

Conducting Hydraulic Test for Pressure parts.

Previously Worked @ Duration: Aug 2004 to Nov 2005 Company : Avant Garde Engineer & Consultant (P) Ltd, Chennai, India. Designation : Engineer Trainee

Jobs Handled:

Assisting in Preparing Tender documents for Balance of Plant packages and Evaluating all offer for qualifying suitable vendor.

Follow up for timely supply and delivery of packages to client from vendor.

Previously Worked @ Duration: Dec 2003 to Aug 2004 Company : SPB Projects & Consultant Ltd, Chennai, India. Designation : Apprentice Engineer

Jobs Handled:

Assisting in Preparing Tender documents for WHRB, TG & Balance of Plant packages and Evaluating all offer for qualifying suitable vendor.

Follow up for timely supply and delivery of packages to client from vendor. Page 6 of 6

OTHER PERSONAL DETAILS:

Date of Birth : 10 .08.1980

Age : 40 Years

Nationality : INDIAN

Passport Details : K5069046, Valid up to: 12/09/2022 Permanent Address : 17B, Thiruvengada Nagar, Trichy-620013, Tamilnadu, India.

Languages Known : English & Tamil– (Read, Write & speak) & Hindi (Speak). DECLARATION

I hereby declare that the information furnished above is true and correct to the best of my knowledge.

Date:

Place: Signature

(M.SENTHIL KUMAR)



Contact this candidate