KARTHIK . G ~ RESUME
Permanent Address Present Address
S/o, Ganesh Babu.E, BEST OIL AND GAS SOLUTIONS LLC
**/**, ****** *****, ** BOX 1632, PC 133,
Mohan Nagar (PO), Al-Khuwair,
Salem – 636030. Muscat,
Tamil Nadu, India. Sultanate Of Oman
adnfyr@r.postjobfree.com adnfyr@r.postjobfree.com
Mob: +91-994******* (INDIA) Mob: +968-******** (OMAN)
CAREER OBJECTIVES
Seeking a challenging position to utilize and deliver my educational & training skills and abilities where there is scope for teamwork and professional growth, constant learning is a part of the day to work and willing to deliver my full effort to grow up along with the organization.
PROFILE
Mechanical Engineering graduate having with 3 years to till now as a foreign experience in the Engineering Contracting and Construction of Oil and Gas projects in Oman.
A result oriented person in execution of fabrication, installation, inspection, testing and commissioning activities.
Having worked experience in installation, alignment, pre-commissioning and commissioning of Pipelines.
Well working experience in Contracting services like engineering, supervision, inspection and regular follow-ups with contractor for completing the projects on schedule.
An effective communication and coordination with Clients.
Experience in drawing review and quantity survey related to pipeline project.
Proficient in managing site related technical issues and queries in consultation with site/HO engineering team.
Applied ANSI / ASME safety standards, Quality requirements at all project activities.
Mechanical Engineering graduate having with 4 years and 3 months of experience in the Engineering Consultant and Construction of City Water Pipelines and pumping stations projects in India.
A result oriented person in execution of fabrication, installation, inspection, testing and commissioning activities.
Having worked experience in installation, alignment, pre-commissioning and commissioning of Pumps.
Well working experience in Consulting services like engineering, supervision, inspection and regular follow-ups with contractor for completing the projects on schedule.
An effective communication and coordination with State Government authorities and contractors
Experience in drawing review and quantity survey related to pipeline project.
Proficient in managing site related technical issues and queries in consultation with site/HO engineering team.
Applied Indian / State Government’s safety standards, Quality requirements at all project activities.
PROFESSIONAL COMPUTER SOFTWARES & TECHNICAL SKILLS
MS Office
Auto CADD from CADD Centre
Pro-E from Kongu Polytechnic College, Erode
CATIA from CADD CENTRE
Advanced Diploma in Computer Application and Java
Diploma in Dot NET from CSC Computer Education, Salem
Post Graduate Diploma in Piping Engineering (PDMS and CAESER II)
Non-Destructive Testing Level II in Ultrasonic Testing (UT), Magnetic Particle testing (MT), Liquid Penetrant Testing (LT), Radiography Testing (RT), Visual Testing (VT)
Course on Revit MEP Essential.
IN-PLANT TRAINING ATTENDED
Shridhan Automation Pvt.Ltd Kumbalagodu, Bangalore during the period from 24-11-2011 to 28-11-2011
Steel Authority of India Limited (SAIL), Salem Steel Plant, Salem during the period from 1-1-2008 to 14-1-2008
Tata Projects Limited, Tirupur on 31-10-2007 at Common Effluent Treatment Plant
PRESENT EMPLOYMENT DETAILS:
M/s BEST OIL AND GAS SOLUTIONS LLC, Oman, as Junior Mechanical Engineer From March 23rd 2018 to Till Date.
A)Project:
ULFA Project in Saiwan, Oman, United Arab Emirates
Client: CC ENERGY DEVELOPMENT SAL, Oman, United Arab Emirates
Roles:-
Prepare, schedule, coordinate and monitor the assigned engineering projects.
Supervising the Projects which includes co-ordination with Engineering, Procurement, Quality control, Erection, Commissioning team
Organizing a meeting with Progress team members on weekly basis to monitor and control all the projects.
Perform quality control of work (Alignment) and report regularly on project status.
Co-ordination with third parties like Client for inspection.
Review engineering deliverables and initiate appropriate corrective actions if any as per site condition and requirement.
Incoming Materials Inspection on site.
Maintain project schedule by monitoring project progress.
Maintain safe and clean working environment by enforcing procedure, rules and regulations.
Following the ASME / ANSI Quality Management System and Maintaining documents as per standards.
Drawings review.
Incoming Materials Inspection / construction / Quality / Safety on site such as A 106 Gr.B 4 inch Sch 80 rotolined painted pipes are welded with E 6010 3.2 mm and 2.5 mm diameter welding electrode for on-plot purposes.
Knowledge in Hydro Testing in Pipelines
Knowledge in Painting and Touch-up activities in on-plot pipes with having the paint thickness of 240 microns.
Involved in the project commissioning works.
Timely completion of all the Projects.
Coordinating with Client on daily basis for Engineering clarifications.
B)Project:
ULFA-PWRI Project in Saiwan, Oman, United Arab Emirates
Client: CC ENERGY DEVELOPMENT SAL, Oman, United Arab Emirates
Roles:-
Prepare, schedule, coordinate and monitor the assigned engineering projects.
Supervising the Projects which includes co-ordination with Engineering, Procurement, Quality control, Erection, Commissioning team
Organizing a meeting with Progress team members on weekly basis to monitor and control all the projects.
Perform quality control of work (Alignment) and report regularly on project status.
Co-ordination with third parties like Client for inspection.
Review engineering deliverables and initiate appropriate corrective actions if any as per site condition and requirement.
Incoming Materials Inspection on site.
Maintain project schedule by monitoring project progress.
Maintain safe and clean working environment by enforcing procedure, rules and regulations.
Following the ASME / ANSI Quality Management System and Maintaining documents as per standards.
Drawings review.
Incoming Materials Inspection / construction / Quality / Safety on site such as A 106 Gr.B 4 inch Sch 80 rotolined painted pipes are welded with E 6010 3.2 mm and 2.5 mm diameter welding electrode for on-plot purposes.
Incoming Materials Inspection / Construction / Quality / Safety on site such as Goose Neck with API 5L Grade bended inch Pipe Sch 160 painted are used for on-plot and non-painted are used for off-plot purposes. They are being welded with 2.4 mm diameter ER 70S2 grade TIG Filler Wire Rod with the classification under AWS 5.18.
Incoming Materials Inspection / Construction / Quality / Safety on Site such as 4 inch 100 mm Nominal Diameter with PE 100 Grade High Density Poly Ethylene (HDPE) Pipes are used for off-plot purposes.
Knowledge in Hydro Testing in Pipelines.
Knowledge in Painting and Touch-up activities in on-plot pipes with having the paint thickness of 240 microns.
Involved in the project commissioning works.
Timely completion of all the Projects.
Coordinating with Client on daily basis for Engineering clarifications.
C)Project:
Water Injection Line Projects in Saiwan and Farha, Oman, United Arab Emirates
Client: CC ENERGY DEVELOPMENT SAL, Oman, United Arab Emirates
Roles:-
Prepare, schedule, coordinate and monitor the assigned engineering projects.
Supervising the Projects which includes co-ordination with Engineering, Procurement, Quality control, Erection, Commissioning team
Organizing a meeting with Progress team members on daily / weekly basis to monitor and control all the projects.
Perform quality control of work (Alignment) and report regularly on project status.
Co-ordination with third parties like Client for inspection.
Review engineering deliverables and initiate appropriate corrective actions if any as per site condition and requirement.
Incoming Materials Inspection / construction / Quality / Safety on site such as A 106 Gr.B 4 inch Sch 80 rotolined painted pipes with E 6010 3.2 mm and E 7018 2.5 mm diameter welding rods are used for on-plot purposes and also API 5L Grade pipes with E 6010 3.2 mm, 4 mm diameter welding rods are used for off-plot Purposes.
Incoming Materials Inspection / Construction / Quality / Safety on site such as Goose Neck with API 5L Grade bended inch Pipe Sch 160 painted are used for on-plot and non-painted are used for off-plot purposes. They are being welded with 2.4 mm diameter ER 70S2 grade TIG Filler Wire Rod with the classification under AWS 5.18.
Incoming Materials Inspection / Construction / Quality / Safety on Site such as 4 inch 100 mm Nominal Diameter with PE 100 Grade High Density Poly Ethylene (HDPE) Pipes are used for off-plot purposes.
Maintain project schedule by monitoring project progress.
Maintain safe and clean working environment by enforcing procedure, rules and regulations.
Following the ASME / ANSI Quality Management System and Maintaining documents as per standards.
Drawings review.
Knowledge in Hydro Testing in Pipelines in on-plot and off-plot areas.
Knowledge in Painting and Touch-up activities in on-plot pipes with having the paint thickness of 240 microns.
Involved in the project commissioning works.
Timely completion of all the Projects.
D) Project:
Oil Producer Line Projects in Saiwan and Farha, Oman, United Arab Emirates
Client: CC ENERGY DEVELOPMENT SAL, Oman, United Arab Emirates
Roles:-
Prepare, schedule, coordinate and monitor the assigned engineering projects.
Supervising the Projects which includes co-ordination with Engineering, Procurement, Quality control, Erection, Commissioning team
Organizing a meeting with Progress team members on daily / weekly basis to monitor and control all the projects.
Perform quality control of work (Alignment) and report regularly on project status.
Co-ordination with third parties like Client for inspection.
Review engineering deliverables and initiate appropriate corrective actions if any as per site condition and requirement.
Incoming Materials Inspection / construction / Quality / Safety on site such as A 106 Gr.B 4 inch Sch 80 painted pipes with E 6010 3.2 mm and E 7018 2.5 mm diameter welding rods are used for on-plot purposes and also API 5L Grade pipes with E 6010 3.2 mm, 4 mm diameter welding rods are used for off-plot Purposes.
Maintain project schedule by monitoring project progress.
Maintain safe and clean working environment by enforcing procedure, rules and regulations.
Following the ASME / ANSI Quality Management System and Maintaining documents as per standards.
Drawings review.
Knowledge in Hydro Testing in Pipelines on-plot and off-plot areas.
Knowledge in Painting and Touch-up activities in on-plot pipes with having the paint thickness of 240 microns.
Involved in the project commissioning works.
Timely completion of all the Projects.
Coordinating with Client on daily basis for Engineering clarifications.
PREVIOUS EMPLOYMENT DETAILS
M/s SHAH TECHNICAL CONSULTANTS PVT.LTD, Mumbai, as Site Engineer (Mechanical) From November 3rd 2015 to January 15th 2018.
A)Project: Period from Dec 1st 2017 to Jan 15th 2018 (Intermittent Basics)
SOUNNI YOGANA Project in Ahmadabad, Gujarat, India
Client: Narmada Water Resources and Conserve Limited
Roles:-
Inspection and Verification of Quality control / Quality Assurance
B)Project: Period from Nov 1st 2017 to Nov 30th 2017
Testing and Commissioning of 500 MLD Water Treatment Plant at Parvati in Pune, Maharashtra, India
Client: Pune Municipal Corporation, Pune, Maharashtra, India
Roles:-
Testing of Valves, Gates, Pressure Switches, Level Sensors & Level Transmitters etc.
C)Project: Period from May 2nd 2017 to Oct 25th 2017 (Intermittent Basics)
Construction of main transmission pipeline Diameter of 1300mm for 24 KMS and 6 Nos of water storage tanks (reservoirs), Water treatment plant and Raw water pumping Station
Client:-Assam Urban Infrastructure Investment Program at Guwahati, Assam, India
Roles:-
Working as an Inspector of Works for the entire pipeline construction, stringing, laying, installation, welding, alignment, testing and commissioning
Quality inspections carried out as per approved quality plan requirement
Hydro test of water pipeline 1st phase of 0.990 kilometres has been successfully completed
Tackling all mechanical related site related issues as per standard.
Organising & attending weekly meeting with Client and Contractor
Coordinating with Client, Superiors, Contractors and other departments
Monitoring contractor progress on daily basis and maintaining daily logs
Reviewing engineering drawings with respect to site conditions.
D)Projects: Period from 1st November 2015 to 30th April 2017
1.New Water Treatment Plant at Parvati, Pune, Maharashtra, India with having 500 MLD Capacity.
2.New Water Treatment Plant at Wadgaon Badruk, Pune, Maharashtra, India with having 125 MLD Capacity.
3.New Raw Water Pumping Station at Wadgaon, Pune, Maharashtra, India with having 125 MLD Capacity.
4.Kadakwasala Jackwell Pumping Station at Kadakwasala, Pune, Maharashtra, India with having 500MLD Capacity.
5.Mundhuwa Jackwell Pumping Station at Mundhuwa, Pune, Maharashtra, India with having 125 MLD Capacity.
6.Construction of Water pipeline project (2500 mm diameter) of 13 Km from Kadakwasala Dam to Start Pointing of Parvati.
7.Construction of Water pipeline project (2500 mm diameter) of 3.15 Km from Mundhuwa Jackwell Pumping Station to Baby Canal located at Mundhuwa.
Client: Pune Municipal Corporation, Pune, Maharashtra, India
Roles & Responsibilities in details:
Prepare, schedule, coordinate and monitor the assigned engineering projects.
Supervising the Projects which includes co-ordination with Engineering, Procurement, Quality control, Erection, Commissioning team
Organizing a meeting with Progress team members on weekly basis to monitor and control all the projects.
Perform quality control of work (Blue Matching, Alignment and Performance Guarantee) and report regularly on project status.
Co-ordination with third parties like Client & Contractor for inspection.
Review engineering deliverables and initiate appropriate corrective actions if any as per site condition and requirement.
Incoming Materials Inspection on site.
Maintain project schedule by monitoring project progress.
Maintain safe and clean working environment by enforcing procedure, rules and regulations.
Following the ISO 9001 Quality Management System and Maintaining documents as per ISO standards.
Drawings review.
Knowledge in Hydro Testing & Head Loss Calculation in Pipelines
Involved in the project commissioning works.
Contractor bills verification and certification based on the executed works.
Timely completion of all the Projects.
Coordinating with Client on daily basis for Engineering clarifications, Inspection/Dispatch clearance.
Organizing meeting headed by Project Manager with Sub contractors / vendors & preparing minutes of meeting (MOM), attending weekly project review meeting with Client / Consultant.
M/s Electro-Mechanical Enterprises, Salem, as Site Support Engineer
From June 1ST 2013 to October 31ST 2015
A)Project:-
Construction of Water Treatment Plant (125 MLD) & Pumping station at Mettur Cauvery River Bed to transfer river water to Salem City Corporation, Tamil Nadu
Client:-Salem Municipal Corporation, Salem, Tamil Nadu, India
Roles & Responsibilities:-
Supervision of the Erection, alignment, testing and commissioning of Vertical pumps, Chlorination tank, Alum Tank, Scrubber & its mechanism, Sand Gravity Filtration, Sludge Removal system, Chemical injection units, Clear Water Storage tanks and pumping house as per approved for Construction drawings.
Conducted and inspected every activities based on approved Quality inspection plan
Day to day activity planning and manpower allocation
Carried out the Materials receipt inspection on time upon receipt with Client
Coordination with Site Manager for the resources requirements to achieve daily target
Maintained good relationship with Client / Subcontractor and support department.
Pre-commissioning, testing & commissioning of Pumping station & water treatment plant as per commissioning procedure
Attending weekly progress meeting with client and subcontractor
PROJECT WORKS DONE DURING MY EDUCATIONAL CAREER:
I)During DIPLOMA IN MECHANICAL ENGG:-
Project Name: Fabrication of hovercraft
A Hovercraft is a vehicle that glides over a smooth surface by hovering upon an air cushion. It is otherwise known as Air Cushion Vehicle (ACV).Hovercraft use fans or propellers to generate two streams of air, one for forward thrust and one for lift. Lift air is contained under the craft by a Flexible Skit, enabling the hovercraft to lift clear of the surface. Our project were AWARDED as the best project work during the year 2008-2009
II)During B.E IN MECHANICAL
a.MINI PROJECTS INVOLVED
Project Name: Fabrication of Unconventional Air Compressor
Energy is important factor in today’s world whatever it may be done without energy will be important one. It can be used as a turbo charger when it is fed into air intake of the combustion engine.
b.MAIN PROJECTS INVOLVED
Project Name: Experimental Investigation on TIG Welding Using Austenitic Stainless Steel
This Project has been successfully completed at M/s Steel Authority of India Limited (SAIL), (A Govt. Of India Undertaking), Salem Steel Plant, Salem – 636013, Salem, Tamil Nadu, India
This Project has been chosen as a Best Project and secured 100%
In this TIG Welding we have welded eight samples of Austenitic Stainless Steel of 304 grades out of which first four are welded with filler rod using 308 grades and second four are welded without using filler rod 308 grade under various temperatures such as 40, 50, 60 and 70 respectively. These samples are being tested in the CRM-MECHANICAL lab in Salem Steel Plant, Salem. The various tests such as:
Tensile Test: From this we have concluded that without using filler rod in the Austenitic Stainless Steel the breakage takes place only in the welded portion. So we have chosen only usage of filler rod in the Austenitic Stainless Steel.
Bend Test: From this we have concluded that without using filler rod in the Austenitic Stainless Steel the bended takes place only in the welded portion. So we have chosen only usage of filler rod in the Austenitic Stainless Steel.
Microscopic test: From this we concluded that the grains having the uniform spread over in the sheet by giving the adequate current in the eight samples of Austenitic Stainless Steel.
EDUCATIONAL QUALIFICATION
Name of the course
Name of the institutions
University / Board
Year of passing
Marks Secured
BE in Mechanical Engg
The Kavery Engineering College, Mecheri, Salem
Anna University Chennai
2013
67.66%
Diploma in Mechanical Engg
Kongu Polytechnic College, Perundurai, Erode-638 052
Directorate of Technical Education, Tamil Nadu
2009
60%
SSLC
Sri Vidhya Mandir Matric Hr. Sec School Salem Steel Plant, Salem-636030.
Matriculation Board, Tamil Nadu
2006
67%
PERSONAL DETAILS
Name : Karthik.G
Date of Birth : 24-05-1990
Father’s Name : Ganesh Babu.E
Gender : Male
Marital Status : Un-Married
Passport Details : J1514803 Valid From: 02-11-2011 Valid up to: 01-11-2021
Passport Place of Issue : Coimbatore
PAN Card Number : BPXPK3237E
Languages Known : English, Tamil, Hindi and Sowrastra
DECLARATION
I hereby declare that the information furnished above is true to the best of my knowledge and belief.
Place : Salem
Date : Karthik.G