CAREER OBJECTIVE:
Seeking a position that will utilize my interpersonal skills, and I am seeking for a civil foreman job that will suit my knowledge, extensive experience and capabilities on one hand and to donate my whole experience in the benefit of the company progress on the other hand .
GULF EXPERINCE- 10, YEARS
2009 TO 2019
WORK EXPERINCE
1. Company: - Arab land contracting llc. [U.A.E]
Project: - EXPO 2020,Damac hill, Damac2 akoya Oxygen, [Gate house,cluster C, cluster D, cluster E]
Duration: - from DEC. 2017 to DEC. 2019.
Position: - Civil Foreman.
Project description: Early works project for Expo 2020, Damac hill,&Damacakoya oxygen2, which includes site preparation and gradation, construction of underground utilities like Hard Scape & land Scape swimming pool, ducking sloping works, kid pool, play equipment, dry way, footpath, bus,car parking green wall, water futures wall, planting,and structures.
2. Company: - Al Muhaidib contracting company (K.S.A)
Project: - SADARA (ARAMCO) King Fahad Industrial Port (Jubail)
Duration: - from June. 2013to Jan. 2016.
Position: - Civil Foreman.
Project description: Early works project for sadara port facilities inside king fahadindustrial port, Jubail, which includes site preparation and gradation, construction of underground utilities like FRP firefighting water line between 150dia. To 500dia. construction of pipe racks, storm water ditches, grated and open as well, and valve chambers and construction of flexible pavement roads.
2. Company: - Al Muhaidib contracting company (K.S.A)
Project: - the King Abdullah Sports City project (Jeddah)
Duration: - from Dec. 2012 to June. 2013
Position: - Civil Foreman.
Project description: Construction of sports city which includes outdoor games stadium spectators’ capacity of 25000, indoor games stadium, VIP stands, dressing rooms, landscaping and flash flood system and car parking
3. Company: - Manwa trading & contracting company (K.S.A)
Project: - Construction of Internal Roads Inside King Khaled University Campus, Abha.
Duration: - from Aug. 2010 to Sep. 2011
Position: - Civil Foreman.
Project description:-
Construction of internal roads which includes embankment of 1.5mto 4m by rock fill and soft material alternatively and construction of road structure which includes subgrade, sub base, asphalt base course and wearing course. Approximately the length was about 14km. The network was designed as an express way ring road three lanes either side of total road width 50m and branch roads two lanes either side of total road width of 30m and construction of RCC box culverts of single vent to 5 vents.
3. Company: - Manwa trading & contracting company (K.S.A)
Project: -Construction of Sports City inside King Khaled University Campus, Abha, KSA.
Duration: -form July 2009 to July 2010
Position: - Civil Foreman.
Project description: Construction of sports city which includes outdoor games stadium spectators’ capacity of 10000, indoor games stadium, VIP stands, dressing rooms, landscaping and flash flood system and car parking yard.
PERSONAL DETAIL:-
Date Birth: - 30-06-1986
Nationality: - Indian
Language: - English, Arabic, And Hindi
EDUCATIONAL PROFILE:-
Bachelor of Arts (B.A) From M.D.S. University
ITI Diploma in Civil Surveying (Jaipur)
Diploma in Draughtsman ( Auto Cad 2D ) (Jaipur)
Diploma in Computer Education (Software & Hardware)
Secondary School Certificate form Ajmer board
PROFESSIONAL SKILLS:-
Well known to usage of
LAICA, NICON,TOPCON,AUTO LEVEL,
AutoCAD 2D+Isometric.
Adobe Photoshop& PDF Editor.
Microsoft Office (MS Word, MS Excel, MS Power Point, MS Outlook)
Duties Skilled Background
* Assignment of Activities to workers [Tradesman, Charge hand & Labors] who have the required skill to accomplish the job within tolerances.
* Coordination with, engineers, safety department etc.
* Organizing required material, tools & equipment to the workplace.
* To examine and and monitor work progress, materials and construction site to assure safety and make sure that specifications are matching with real works to issue invoices.
* Planning of daily activities according to the instructions of engineer, project engineer and the availability of resources.
* Collecting all the required information &explaining these to subordinates.
* Assigning & motivating manpower to achieve the goal efficiently.
* Calculating the resource required to accomplish the job.
* Monitoring of structural settling of buildings and other structures.
* Verifying the Verticality of the structure.
* Sitting out columns, beams and other structures in civil works.
* Computing required data from layout approved drawings..
* Performing regular checks of the Contractor setting out to verify proper execution and accuracy.
* Checking completed work for conformance to the line and grade required by the project plans in coordination with the Inspector assigned in the work
DECLARATION - I believe and have confident that I exhibit maturity and stability and I am eager to make a positive contribution for the parallel growth of your organization and my own carrier graph. I hereby declare that the above mentioned information is correct to the best of my knowledge and I bear the responsibility for the correctness of the above mentioned particulars.
ASLAM KHAN DATE –
CIVIL FOREMAN