Post Job Free

Resume

Sign in

Construction Manager Project

Location:
Ernakulam, Kerala, India
Posted:
June 29, 2021

Contact this candidate

Resume:

RAMANARAYANAN.V

Mob: 009***********/009***********

Email: adne9z@r.postjobfree.com; TC No: 40/248 First Puthen street,

Manacaud P.O., Trivandrum-695009, India.

SYNOPSIS

Construction manager having a total of more than 28 years hands on experience in Oil & Gas, petrochemical, and refinery EPC projects.

Responsibilities includes administering, organizing, delivering and executing different phases of projects from engineering to commissioning. Strong interpersonal and intrapersonal skills, an effective team leader and communicator with excellent relationship management skills and strong analytical, problem solving and organizational abilities.

PERSONAL DETAILS

Present address : Thiruvonam, Orchid Villa, Ashokapuram, Aluva, Kerala

DOB : 06.07.1963

Nationality : Indian

Passport details : NO:R3088041

Date of Issue : 26/07/2017

Valued till : 25/07/2027

PROFESSIONAL QUALIFICATIONS

Bachelor of Engineering in Mechanical Engineering(1985)-From Kerala University (61%)

Pre Degree-(1980) From Gov. Arts college, TVM,Kerala University (82%)

SSLC-(1978)fromGovt. Model High School,TVM,Board of public examination, Kerala(74%)

Additional qualification: AWS (Certified welding inspector)

IT Skills : MS Office, AUTOCAD,MS PROJECTS

PROFESSIONAL EXPERIENCE

Worked for AISTS as Shutdown Block Manager for shutdown job in Abudhabi Ruwais refinery from September 2019 to May 2020

Major jobs executed includes Flare tip replacement including review of rigging study and method statements for client approval, Heat exchanger Tube bundle removal, cleaning and testing of Tubes and Shells, Tanks (Desludging and repair works) Reactors, Columns (Tray removal/dismantling/replacement, cleaning and box up),Drums and Vessels, Valve testing, Scaffolding ect.

Completion of Final Documentation and handover was done for client acceptance as per the Method Statement of each equipemnt

COMPANY : WORLEY PARSONS ARABIAN INDUSTRIES,SULTANATE OF OMAN

PROJECT : GREATER BIRBA EPCC PROJECTS

CLIENT : PETROLEUM DEVELOPMENT OMAN

POSITION HELD : CONSTRUCTION MANAGER

PERIOD : FROM JULY 2015 TO SEP 2017

DUTIES AND RESPONSIBILITES:-

Working as Construction Manager for EPC Projects in Al-noor.Birba,Harweel PDO stations.

Completed two major shutowns in Birba station and Al-noor ANPS on 2016 December & 2017Febrauary succesfully. Projects includes all multi disciplinary works like Piping(CS/SS/CRA), pipelines, equipment erection,structural steel,civilworks,electrical and instrumentation works, In Al-noor Substation building construction was among one of the projects.

From September 2014 to January 2015 I was working for TOCO for various well head piping/Flowline/Pipelines works in Wadiliatham and Safah for OXY.

DUTIES & RESPONSIBILITES AS CONSTRUCTION MANAGER/SITE MANAGER

Manage all onsite construction functions in accordance with established policies, procedures, systems and requirements approved by the company

Function liaison between engineering, procurement and construction.

Manage project close out activities.

Responsible for constructability review from FEED stage upto completion.

Coordinate interface with operations and construction activities to identify, coordinate and mitigate risks associated with SIMOPS.

Lead a multi-disciplined construction team in the execution of the project and development and execution of the project schedule and man-hour and financial budgets.

Coordinate transition to commissioning team ensuring completion of incomplete work lists as designed and approved during MC process.

Provide input for development of construction schedules to planners and review of overall project plan, verifying adequacy of resources and allocating them as and when required.

Coordinating the HSE activities as per the company HSE policies and directives including scheduled audits, weekly, monthly meetings, TBT’s, PTW coordination meetings ect.

Review and approval of monthly progress reports. Monitor and coordinate project deliverables in order to optimize construction efficiency and cost. Ensure that any variance is addressed to and agreed with client and implemented.

Participating and implementing and monitoring adherence to the QA policies and suggests improvements required for continuous development of Quality Management system.

Lead internal quality audits with site QA Manager and verify the adequacy of implementation of QA policies/procedures

Provide regular progress of the project through daily/weekly/monthly/reports with respect to

review of overall project schedule.

Anticipate and resolve problems, bottlenecks/scheduling conflicts to achieve on time/earlier deliveries to keep project on schedule.

Develop a cost report per month that details costs and expenditure for the period, forecasts the completion of the project with an aim of minimizing the variance. Manage Project indirect overhead budgets .

Monitor sub contractors performance throughout the duration of the project and ensure full records are maintained for claims/change orders executed. Chair the meetings with sub contractors and drive a proactive and inclusive approach on all issues.

Ensure any change in project schedule on the part of customer/vendor/Contractor are captured commercially and contractually.

Plan and manage all projects temporary facilities.

COMPANY : M/SGALFAR ENGINEERING &CONTRACTING SAOG,SULTANTE OF OMAN.

PROJECT : GREATER TALIAH PROJECTS/NIMR-G & KARIM WEST WATER TREATMENT /SHUTDOWN IN SOHAR REFINERY

CLIENT : PETROLEUM DEVELOPMENT OMAN/ORPIC

POSITION HELD : CONSTRUCTION MANAGER/PROJECT MANAGER

PERIOD : FROM 2012 MAY TO APRIL 2014

DUTIES AND RESPOSIBILITIES :-

Worked as Project Manager in Lekhwair Greater Taliyah(40Km GRE pipeline/132 KV OHL lines/flowlines/wellheads/RMS pad/Inconel piping/FARS water 6Km pipeline/LPS onplot piping replacement projects. Involved in conceptualisation and constructability input feed back starting from FEED stage upto commissioning with engineering and procurment team in HO and discussion with PDO regarding the issues associated.

Executed Sohar Refinery Major shutdown job successfully in March 2013.

Worked as Construction manager handling EPC project for the FWKO Double wall Tank in Nimr-G projects at PDO Nimr.

EMPLOYER : CLEVELAND BRIDGE ENGG.CO. (PVT) LTD., DUBAI,U.A.E.

PROJECT : ALUMINA SILO PROJECT

CLIENT : DUBAI ALUMINIUM (SNC LAVLIN)

PERIOD : FROM 2010 MAY TO 2011 JULY

POSITION HELD : SITE MANAGER

DUTIES AND RESPONSIBILITIES

Working as site manager for Dubai Aluminum Company in Jebelali which involves the construction of Alumina storage silo and associated conveyors, structural steel work. (EPC project)

EMPLOYER : QATAR ENGINEERING AND CONSTRUCTION COMPANY WLL.

PROJECT : CLSCSEF PROJECT

CLIENT : DOLPHIN ENERGY LIMITED

PERIOD : FROM 2008 JAN TO JAN 2010

POSITION HELD: CONSTRUCTION MANAGER

DUTIES AND RESPONSIBILITIES

Worked as construction manager for 770 million USD project (EPC contract) which includes construction of 88.5m dia x 22m high 2nos. of double deck condensate storage floating roof tanks and one 77m dia x 22m high floating roof tank, 44m dia 22mt high fire water dome roof tank, and foam tank with associated civil, equipments, piping, electrical and instrumentation works of total project.

Planning methodology and execution of air rising of dome roof was done by self. Roof frames were assembled on ground inside the tank to facilitate faster completion of roof plate assembly, underneath seal welding and painting activities.

EMPLOYER : PADMA TANKS& VESSELS

COMPANY : TRAVANCORE TITANIUM PRODUCTS LTD

PERIOD : FROM JANUARY 2001 TO 2007 AUGUST

POSITION HELD : PROJECT MANAGER

DUTIES AND RESPONSIBILITIES

Worked as one of the contracting firms for the various projects involved in stainless steel piping and carbon steel piping and tankages jobs in Travancore titanium limited, including maintenance works.

Ensure safe and efficient execution of projects with set targets and schedules.

Liaison with client senior management and troubleshooting any areas of conflict in order to ensure smooth execution and continuing working relationship.

PROJECT : OLEFINS III PROJECT, PETROKEMYA.

COMPANY : SAUDI PETROKEMYA (SABIC)

POSITION HELD : MECANICAL INSPECTION ENGINEER

PERIOD : FROM 1998 OCTOBER TO 2001 JANUARY.

DUTIES AND RESPONSIBILITIES

Responsible for the inspection of all storage tanks including double wall cryogenic tanks for ethylene and propylene, horizontal sphere, BTX tank(cone roof with internal floating roof) nitrogen tank with internal diaphragm, De-mineralized water tank and other tanks.

Reviewing WPS/PQR for the project and reviewing radiographic films. Responsible for inspection of columns / vessels / exchangers / air fin coolers / demineralized skid units / pumps / compressors etc.

Also responsible for the inspection of piping for the main plant including carbon steel/stainless steel/alloy steel, piping etc.

Reviewing the procedures erection, Hydro testing, flushing, pressure testing, radiographic testing, magnetic particle testing and dye penetrant testing, oil penetrant testing of tanks and piping.

Identifying the non-conformities during the execution and resolving them.

Verifying field engineering decisions with respect to general engineering standards / specifications / code requirements.

Punch listing for final acceptance coordinating, conducting QC meeting with Contractors and sub vendors

PROJECT : SULPHER RECOVERY UNIT, BPCL REFINERY UNIT, MUMBAI./ENRON,B173 OFFSHORE PLATFORMS

COMPANY : LARSEN & TOUBRO LIMITED

POSITION HELD : ASSISTANT MANAGER

PERIOD : FROM 1996 FEBRUARY TO 1998 OCTOBER.

DUTIES AND RESPONSIBILITIES:

Assigned in Head Office for reviewing bid documents and provide necessary constructability inputs required for each project at the bidding stage like resource allocation,manpower planning, histograms,rigging study of any heavy lifts,HSE requirements ect.for L&T Hydrocarbon Group. For latter part of the duration, I was responsible for the overall construction management of SRU project which was done by SIRITEC NIGI and L&T jointly.

Coordination with engineering office to resolve the outstanding issues related to construction.

Reviewing the rigging study off all columns and exchangers, progress monitoring, reviewing and reporting to the project management at Vadodara about the concerns /bottlenecks affecting the progress and take necessary actions to arrange infrastructural facilities for speedy implementation of the project.

Responsible for the erection and Hydro testing of piping and equipment for ENRON oil platform and B73 oil platformexecuted at L&T Hazira workshop including assembly and testing of cranes.

COMPANY : CHIYODA CORPORATION, ABUDHABI

CLIENT : ABHUDHABI NATIONAL OIL COMPANY

PROJECT : GUP PROJECT, RUWAIS REFINERY.

PERIOD : FROM 1995 FEB TO OCT 1995.

POSITION HELD : TANK ENGINEER

DUTIES AND RESPONSIBILITES:

Responsible for the fabrication and erection of storage tanks (4nos.) & desalination unit Evaporator associated erection & welding of piping and Evaporator including Cu-Ni, Cu-Ni clad, carbon steel and stainless steel piping, brine recirculation pumps. Ejectorsetc. Coordination with construction contractor and progress monitoring.

COMPANY : AGAP ARAB LIMITED

CLIENT : FLOUR DANIEL ARBIA LIMITED

POSITION HELD : MECHANICAL QAIQC INSPECTOR

PERIOD : FROM JUNE 1993 TO SEPTEMBER 1994

PROJECT : GAS & OIL SEPERATION PLANT SAFANIYA

DUTIES AND RESPONSIBILITIES:

Inspection of degasser tanks, vertical pumps, Desalter trains, process pumps, desalination unit, package boiler, plate heat exchangers, flare stack, fin fan coolers, oily water Separator and associated piping at Safaniya GOSP of SAUDI ARAMCO

PROJECT : AL-GHUBHRA POWER & DESALINATION PLANT,

PHASEIII,EXPANSIONPROJECT

COMPANY : DODSAL PTE.LTD, SULTANATE OF OMAN,

CLIENT : HITACHI ZOSEN CORPORATION, JAPAN.

POSITION HELD : EQUIPMENT ERECTION ENGINEER.

PERIOD : FROM 1991 OCT TO 1992 DEC.

DUTIES AND RESPONSIBILITIES:-

Responsible for the erection of equipments and storage tanks including dome roof tank D.M. Water tank of 60000cu.m.capacity,fuel oil tank, Overhead cranes, Sea water screening units/Gates, Lime conveyors, Evaporator chemical skids, Chlorination units etc. including piping in evaporator unit. (Cu-Ni, Cu-Ni clad piping)

Rigging study for the heavy lifts and sea water intake pump assembly was also done by me.

PROJECT : BIO GAS EXPANSION PROJECT

COMPANY : VAM ORGANIC CHEMICLS LTD,

GAJRUALA, UTTAR PRADESH.

POSITION HELD : SENIOR ENGINEER (PROJECT)

PERIOD : FROM 1991 JAN TO 1991 OCT

DUTIES AND RESPONSIBILITIES:

Erection & supervision of 2 biogas storage tanks, parallel plate separators, plate heat exchangers and associated piping works at Gajruala plant. Responsibilities include evaluation of the contractor bids, Laisoning with contractors, progress monitoring, invoicing etc.

.

PROJECT : BASRA REFINERY PROJECT, BASRAH, IRAQ

CLIENT : NIIGATTA ENGINEERING COMPANY, JAPAN

COMPANY : DODSAL PTE LTD.,

POSITION HELD. : ENGINEER (JM II)

PERIOD : SEPTEMBER 1989 TO OCT 1990

DUTIES AND RESPONSIBILITIES:

Responsible for the erection, assembly, alignment and welding of furnaces, cooling tower, columns, exchangers, vessels compressors, pumps etc at Basra refining complex located at Basra, Iraq. Assembly of trays inside columns and other equipments was part of my job.

Being a resumption project, I was involved with overhauling of all compressors turbines, pumps, heat exchangers and other associated equipment.

Also involved in pre-commissioning activities like catalyst loading in reactors.

other responsibilities handled includes internals/ tray installation in columns, preparation of rigging study of heavy lifts,bolted tank construction, erection of equipment & piping in water treatment plant etc.

COMPANY : DODSAL LIMITED

POSITION HELD : ENGINEER (JM 11)

COMPANY : KRIBHCO, GUJARAT.(HAZIRA AMMONIUM EXPANSION PROJECT)

PERIOD : FROM 1988 JUNE TO 1989 SEPTEMBER

DUTIES AND RESPONSIBILITIES:

Responsible for the erection/ alignment of heavy duty compressors, pumps, columns, heat exchangers, vessels, towers at Hazira ammonium extension project. Solely responsible for the 5000

tons tons of equipment erection. In charge of compressor house comprising 13 compressors of make KOBE, KAWASAKI, MAN GHH, BHEL & K.G. KHOSLA etc.

COMPANY : DODSAL LIMITED

POSITION HELD : ENGINEER (JM 11) ASSISTANTENGINEER,

PROJECT : INDOGULFFERTILIZERS CORPORATION PROJECT

PERIOD : FROM 1987 JUNE TO 1988 SEPTEMBER,

DUTIES AND RESPONSIBILITIES:

Responsible for piping in ammonia plant including alloy steel. stainless and carbon steel piping and alignment of turbo compressors and associated steel structure of Indo Gulf Fertilizers Corporation project,Jagdishpur and Hazira Ammonium Extension project.

COMPANY : VISHAL ENTERPRISES, MUMBAI

PROJECT : BHARAT PETROLUM CORPORATION L.T.D.

POSITION HELD : JUNIOR ENGINEER

PERIOD : FROM 1986 MAY TO1987 JUNE

DUTIES AND RESPONSIBILITES :

Site management and supervision of fabrication and erection of storage tanks at BPCL GWALIOR depot.Over all coordination with engineering and client on various engineering issues.Laisoning& negotiating with sub-contractor included in responsibilities.

For the latter half of this tenure I was responsible for the estimation and tendering of tank fabrication at head office in Mumbai. Negotiation with contractors, evaluation of the tenders etc. also was included in my job.

DECLARATION

I hereby declare that the above information is correct up to my knowledge and I bear the responsibility for the correctness of the particulars.

Date: Ramanarayanan. V.



Contact this candidate