Post Job Free

Resume

Sign in

I have graduated as an Electrical Engineer (BSEE)

Location:
Riyadh, Saudi Arabia
Salary:
SAR10000
Posted:
June 26, 2021

Contact this candidate

Resume:

**+ years’ experience in construction industry local and abroad.

• Self-motivated and resourceful who is also a practical hands on operator and has a track record of contributing to the overall growth strategy of an organization.

• Ability to manage a number of projects and initiatives simultaneously.

• Having a proven ability to ensure first class delivery to the customer base.

• Effective time management skills with the ability to priorities.

• Possessing the vision, drive and determination to succeed.

• Flexible approach to working.

• Resilient enthusiastic in all areas.

• Can influence and communicate effectively across multiple sectors,

• Now looking forward to a making a significant contribution in a company that offers a genuine opportunity for progression.

1.

: 2169 Makkah Al Mukarramah Branch Rd, As Sulimaniyah, Riyadh 12621 8047 Project

Owner

Address

Position

2.

Project

Owner

Address

Position

3. Company

Inclusive Date

List of Project Involved:

: RIYADH METRO PROJECT

: High Commission for the Development of Arriyadh (ADA)

: Riyadh, Kingdom of Saudi Arabia

: QA/QC Engineer - Electrical Works

Company : FIRST GULF COMPANY

Address

Position : General Electrical Engineer

Inclusive Date : January 20, 2019 -January 19, 2021 Department : Engineering

Department

R E S U M E

2600 Al Hussien Bin Ali Street,

Al Tawoon District, Riyadh City, K.S.A.

Mobile No. - 055*******

E-Mail Address - adndog@r.postjobfree.com / adndog@r.postjobfree.com WhatsApp: +966*********

FROILAN F. YARANON

: JK ENTERPRISE LTD.

List of Project Involved:

Company

Address

Position

Inclusive Date

Department

Construction and Project Management

: Riyadh, Kingdom of Saudi Arabia

: Electrical Engineer

: May 02, 2016 - June 30,2018

: Engineering

Address

Position

: CORDOBA BOULEVARD PROJECT/AL TAWOON RESIDENTIAL

COMPOUND PROJECTS - RIYADH

: ROYA Real Estate/Al Saedan Real Estate

: Riyadh, Kingdom of Saudi Arabia

: Electrical Engineer

: ABDALLAH ALSAIF & PARTNERS

For Studies & Engineering Consulting

: Riyadh, Kingdom of Saudi Arabia

: Electrical Engineer

: February 01, 2011 – January 31, 2016

: Engineering

Qualification:

Objectives:

Personal Profiles:

Work Experience:

company.

To attain and avail challenging work that allows me to enhance and optimize my potential and capabilities to have a chance for professional enrichment and to comply with a bigger responsibility of the skill acquired through education, training, seminars and work experiences. QA/QC Engineer, Field Engineer and Maintenance Engineer since 1988 up to the present. Added to my work also as Quantity Surveying, Material Estimation, Project Scheduling, and Auto CAD (2D). I have been working as Electrical Engineer, Project In-charge, M&E Site Supervisor, MEPF QC Supervisor, I believed that my dedication in working with chosen career will be the greatest assets to be part of your 4.

5.

a.

b.

c.

d.

e.

Fire Tube Boiler Rectification (Boiler conversion - Oil to Bio Gas fueled) Fire Tube Boiler Rectification (Boiler conversion - Oil to Bio Gas fueled)

: Vietnam Waste Water Treatment Plant and Biogas Production Project

Owner

Address

Position

: VEDAN Veyu Enterprise Co., Ltd.

: An Khe, Gia Lai, Vietnam

: M&E Site Supervisor

Owner : VEDAN Enterprise Corp., Ltd.

List of Project Involved:

(15 storey bldg.)

Project

Alabang, Muntinlupa City, Philippines 1770

Position

Inclusive Date

Department

: M & E Site Supervisor

: May 5, 2008 – January 19, 2010

: Engineering - Project Site Services

Company

Address

: GLOBAL WATER ENGINEERING

: 6th Flr. Richville Corporate Center,

1314 Commerce Ave. Extension, Madrigal Business Park, List of Project Involved:

Project

Owner

Address

Position

: SUNLIFE FINANCIAL PHILS. HEADQUARTER (15 storey bldg.)

: SUNLIFE FINANCIAL

: Fort Bonifacio, Global City, Taguig, Metro Manila, Philippines

: Project –In charge

Inclusive Date

Department

: ROMAGO INCORPORATED

: 36 Cordillera Street, Mandaluyong City, Philippines

: Electrical Engineer

: January 20, 2010 – January 08, 2011

: Engineering - Operation

Address

Position

: Tabuk City, Tabuk, Kingdom of Saudi Arabia

: Electrical Works–In charge

Company

: Kingdom of Saudi Arabia – Ministry of Health

(Directorate of Projects)

Address

Position

Owner

List of Project Involved:

Project : Psychiatric and Addiction Hospital (200 Beds) Project Project

: Thanh Vu Trading Co., Ltd.

Project : Vietnam Waste Water Treatment Plant and Biogas Production Project

Address

Position

: Binh Phuoc, Vietnam

: M&E Site Supervisor

: M&E Site Supervisor

Owner

Address

Position

Project

Project

: Vinakraft Paper Co.

: Binh Duong, Vietnam

: Daklak, Vietnam

: M&E Site Supervisor

Owner

Address

Position

Project : Vietnam Waste Water Treatment Plant and Biogas Production Client/Owner

Address

Position

: AES Engineering Vietnam LLC/Intemix

: Nghe An, Vietnam

: Electrical Site Supervisor

: Vietnam Waste Water Treatment Plant and Biogas Production Project/

: Vietnam Waste Water Treatment Plant and Biogas Production Project/ f.

g.

6.

JOINT VENTURE

7.

a.

b.

8.

a.

: SAINT LUKE'S MEDICAL CENTER PROJECT

: Rizal Drive corner 5th St., Fort Bonifacio, Global City, Taguig City, Philippines 1637

: MEPF QC Supervisor

: 5/F King’s Court Bldg. 1, 2129 Pasong Tamo,

Makati City

: Quality Control / Quality Assurance Engineer

: July 04, 2005 – September 10, 2007

: Engineering

: Ha Tinh, Vietnam

: M&E Site Supervisor

: MAKATI DEVELOPMENT CORP. – FIRST BALFOUR

: Rizal Drive corner 5th St., Fort Bonifacio, Global City, Taguig, Metro Manila, Philippines 1637

: MEPF QC Supervisor

Project : Casecnan Multi-Purpose Irrigation & Power Project Owner : Municipality of Rizal, Nueva Ecija, Philippines Address : Rizal, Nueva Ecija, Philippines

Position : Project Supervisor

Project : Vietnam Waste Water Treatment Plant and Biogas Production Project

Client/Owner

Project : Vietnam Waste Water Treatment Plant and Biogas Production Project

Owner

Position

Address

Position

: AES Engineering Vietnam LLC/VEAM

: Nghe An, Vietnam

: Electrical Site Supervisor

Position

Department

List of Project Involved:

Project

: Engineering

Address

Position

: VEDAN Enterprise Corp., Ltd.

: SHIMIZU PHILIPPINES CONTRACTORS, INC.

Department

Position

Inclusive Date

Company

Address

Inclusive Date

Company

Address

: September 7, 2007 – May 5, 2008

Address

Address : Laguna International Industrial Park

Mamplasan, Biñan, Laguna, Philippines

Position : Project QA/QC Engineer – Mechanical and Electrical Works List of Project Involved:

Project : Transitions Optical Philippines, Inc. &

Stage 2 New Warehouse Building Project

Owner : Transitions Optical Philippines, Inc.

Gateway Business Park

Position : QA/QC Engineer – Mechanical and Electrical Works Company : WEL CONTRACTING CORPORATION

Project : INTEL CS Project

Owner : INTEL

Address : Intel Philippines

Address

Position

Inclusive Date

Department

List of Project Involved:

: 1949 Campillo St., Malate, Manila, Philippines

: Project-In-Charge

: Feb. 06, 2004 – July 01, 2005

: Engineering

Javalera, Gen. Trias, Cavite, Philippines

b.

c.

9.

a.

b.

c.

d.

e.

f.

g.

h.

i.

: Assistant Project Engineer – Fire protection system and Plumbing works Owner : Bridgestone Philippines

Address : Cavite Export Processing Zone Authority, Rosario, Cavite, Philippines Position : Site Engineer - Electrical works.

Project : Matsushita Electrical Phil. Corp. Project Owner : Matsushita Electrical Philippines Corporation Address : Laguna Technopark Inc., Sta. Rosa, Laguna, Philippines Position

Project : Bridgestone Phils. Project

Project : Manila Japanese School Project

Owner

Address

Position

: Embassy of Japan - Manila, Philippines

: Fort Bonifacio, Global City, Taguig, Metro Manila, Philippines

: Field Engineer – Electrical Works/Air conditioning and Ventilation System.

Position : Assistant Project Engineer – Mechanical works (Ducting, Plumbing, Compressed Air, Water Supply and Fire Protection Line). Compressed Air and Water Supply Line).

Project : 3-5 Systems Philippines. Inc. Project

Owner

Address

Position

: 3-5 Systems Philippines. Inc.

: Carmelray Industrial Park-2, Tulo Calamba, Laguna, Philippines

: Field Engineer – Electrical works

Address : BSEPZ2, Loacan Rd., Baguio City, Philippines Position : Field Engineer – Electrical and ducting works. Project : Jideco Manufacturing Phils. Inc. Project Owner : Jideco Manufacturing Phils. Inc.

Address : LIMA Technology Center, Lipa City, Batangas, Philippines Position

: Tri-M Manufacturing Corporation Project

: Tri-M Manufacturing Corporation

: Carmelray Industrial Park-2, Tulo Calamba, Laguna, Philippines

: Assistant Project Engineer – Mechanical works (Ducting, Plumbing, Project : Texas Instruments Project

Owner : Texas Instruments

Owner

Address

Position

: Laguna Technopark, Biñan, Laguna, Philippines

: Field Engineer – Electrical Works

Project

Owner

Address

: Nidec Philippines Corporation

Address

Position

: Fujitsu Computer Products Phil. Inc. Project

: Carmelray Industrial Park, Canlubang, Laguna, Philippines

: Field Engineer – Electrical works

: Fujitsu Ltd.

Project : Nidec Phils. Project

Position : Field Engineer

Inclusive Date : Aug. 07, 1997 – Oct. 27, 2003

Department : Engineering Department

List of Project Involved:

Project

Owner

Address : Tabang, Guiguinto, Bulacan, Philippines

Position : Project Supervisor

Company : TAIKISHA PHILIPPINES INCORPORATED

Address : 2nd Floor, Urban Bldg., No. 405 Sen. Gil Puyat Ave.,

: Makati City, Philippines

Owner : Island City Mall

Address : Dao District, Tagbilaran City, Bohol, Philippines Position : Project Supervisor

Project : Ajinomoto Philippines Corp. GC-I Project Owner : Ajinomoto Philippines Corporation

Project : Island City Mall Project

j.

10.

11.

12.

13.

1. As a QA/QC Engineer - Electrical Works at Riyadh Metro Project, I am responsible in preparation of the following documents, namely;

• Method of Statement (MST).

• Material Supporting Documents

• Construction Work Package (CWP)

• Inspection Test Plan (Installation and Material Receiving Checklist)

• During execution of work, I am also responsible in preparation of Inspection Request documents such as, Material Inspection Request (MIR) and Work Inspection Request (WIR). 2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

document will be used for the guidance of the contractors and for progress payments.

Prepares and provide all detailed drawings (coordinated services drawings) which will be used as guidance during implementation of the project and make further processing on every deviation on the project design. Responsible in ensuring Quality Assurance and Control are complied with the general specification and standards and shall issue a Non Conformance report if the contractor deviates from the approved design and QA/QC guide lines. standards and also to deal the quality issues and meet the expectation of the client. Prepares and provide to the contractor detailed construction program, overall project schedule (time schedule), showing major milestone, leading to completion of the works by the date required and S-Curve” - showing the construction schedule on top and a percentage reading of work completed at the bottom. This measurement as per progress claim.

Responsible for site inspection and coordination with Project Engineer, QC and Client regarding material specification, and Material on Site as per progress claim from sub-con.

Responsible for Site progress photo on site

Review all the RFI’s if there is any cost implication. Regularly inspects the works during construction to see to it that the approved design, specification and materials are followed and implemented. Responsible in monitoring and ensuring that all workmanship, material used and Other duties and responsibilities - Study the type and scope of works presented in each bid in relation to time required for performance.

Check the bid packages, drawings and specification to eliminate overlapping of jurisdictions, scope omission of different contractors. Review all contract documents to ensure general requirements. Review drawings and specifications for possible materials alternates, local availability of materials and cost implications.

Process of the preparation of subcontractor's payment recommendations and site testing performed are complying with the approved design, specifications and

: HYUNDAI ENGINEERING & CONSTRUCTION CO. LTD.

: 66 Jeokseon-ong, Chongno-ku, 110-052, Seoul, South Korea

: Electrical Maintenance Staff

: April 01, 1988 – April 30, 1989

: Hydraulic & Mechanical

: Asian Development Bank – New Headquarters Bldg. Project Company

Address

Position

Inclusive Date

Department

Project

Company : INTERPOLYMER CORPORATION

: Doneza Street, Malabo, Maysan, Valenzuela City, Philippines

: Electrical Engineering Maintenance Staff

: August 01, 1989 – July 15, 1995

: Electrical Department

Address

Position

Inclusive Date

Department

: Saint Dominic St., ITC Compound, Bagbaguin, Valenzuela City, Philippines

Position : Production/Maintenance Staff

Inclusive Date : January 02, 1996 – June 12, 1996

Department : Manufacturing

Position : Plant Engineer

Inclusive Date : June 30, 1996 – June 15, 1997

Department : Manufacturing

Company : CABLE PLUS INDUSTRIAL CORP.

Address

Address : People’s Technology Complex, Carmona, Cavite, Philippines Position : Assistant Project Engineer – Electrical Works, Airconditioning System, Exhaust and Supply Air System.

Company : MACO ELECTROPOWER ENTERPRISES

Address : 2110 Gen. T. De Leon St., Karuhatan, Valenzuela City, Philippines Project : Rohm Electronics Phil. Inc. Project

Owner : Rohm Electronics Philippines Incorporated

DUTIES AND RESPONSBILITIES:

15.

16.

17.

18.

19.

20.

21.

22.

23.

24.

25.

26.

27.

28.

29.

30.

31.

32.

33.

34.

a. Schedule of activities

b. Manpower requirement

c. Material requirements

d. Status and problems with the project

35.

Regularly checks number of manpower to monitor target completion date of specific phase Supervised testing, commissioning and pre-startup of any Electrical/Mechanical machine Renders assistance to the Commissioning Engineer for the final testing and commissioning Gen. Trias, Cavite.

March 22 – 24, 2006

Basic Occupational Safety and Health Course

World Safety Organization

Region IV Center, Governor Drive,

Gen. Trias, Cavite.

September 25 - 29, 2006

First Aid Training ( For Industrial Employees )

The Philippine National Red Cross

World Safety Organization

Region IV Center, Governor Drive,

of the project.

Provides the Project Manager/Engineering-in-charge of the client’s status report of the project.

Engineer in – charge and client.

Coordinates with Purchasing Department regarding purchase and delivery of materials and equipment needed for the project.

Monitor and controls materials delivered/allocated for the project. following:

Performs other tasks that may be assigned/required by superior from time to time. Attends meeting with Client, General Contractor and Sub-contractor for coordination of the Prepares weekly/daily project schedule of activities for guidance of the Project Manager/ and equipment before and after installation.

Presides and conducts daily/weekly meeting with sub-contractors QA/QC in-charge and daily toolbox meeting.

Responsible in implementing safety and security rules and regulations onsite so that the contractor shall acquaint himself and will adhere on all procedures imposed by the company as well as the client regarding safety and security issues. Perform duties as an official Safety Officer.

of all mechanical and electrical works for start up and final hand over of the project. Prepare checklist, test and inspection plan for documentation. To calibrate all sub-contractors QA/QC in charge on how to deal the quality issues and meet the expectation of the client as far as Quality Control and Assurance is concerned and be familiar to the clients guidelines.

To eliminate wrong practices and repeated acts that lead to poor workmanship, poor material quality and failed testing.

design, specification and materials are followed and implemented. Project monitoring on actual project progress, inspect and approve all requests for inspection of the contractors on the different stages of the project. Electrical and Mechanical machine, equipment and devices including instruments before final Testing and Commissioning works prior to final handover of the project.

Regularly reports to Project Manager.

Responsible in checking/inspecting all materials delivered and fabricated including material mobilization for compliance with client’s specification. Prepare checklist, test inspection plan and methodologies in every equipments and materials before and after installation for documentation. Regularly inspects the works during construction to see to it that the approved Responsible for the supervision of testing, pre-commissioning and pre-startup of all TRAINING / SEMINARS ATTENDED:

Conference Room B, Meralco Foundation Inc. Bldg.

June 02-09, 1993

Meralco Foundation

Clean Room Technology

Taiki-Sha Ltd.

In-House – Taikisha Phils., Inc.

Head Office

14-Oct-02

Total Preventive Maintenance Seminar

System Training & Resources Technology Inc.

December 18-19, 1995

Effective Maintenance Management for First-Line Supervisor Schneider Electric

Eagle Ridge Golf & Country Club, Gen. Trias, Cavite Meralco Foundation

5-Aug-05

Technical Seminars on Electrical Distribution and Industrial Automation Automatic Control Devices

Yamatake Phils., Inc.

In-House – Taikisha Phils. Inc.

Head Office

July 01-02, 2003

SHI Training Room, V.V. Soliven Bldg.

EDSA Greenhills, San Juan, M.M.

9-Jul-05

Hazard Communication

Safety House, Inc.

SHI Training Room, V.V. Soliven Bldg.

EDSA Greenhills, San Juan, M.M.

16-Jul-05

9-Jul-05

Thermoplastic Awareness Class for Joining and Handling Procedure Control of Hazardous Energies

Safety House, Inc.

SHI Training Room, V.V. Soliven Bldg.

EDSA Greenhills, San Juan, M.M.

9-Jul-05

Fall Protection & Ladder Safety

Safety House, Inc.

Spears® Manufacturing Company

JACA Construction and Management Corp. Office

Green Breeze VI, South Avenue, Brgy. Biclatan,

Gen. Trias, Cavite.

29-Sep-05

Basic and Advanced Electrical Safety

Safety House Inc.

SHI Training Room, V.V. Soliven Bldg.

EDSA Greenhills, San Juan, M.M.

Basic Life Support ( Adult CPR Training for Lay Rescuers ) The Philippine National Red Cross

World Safety Organization

Region IV Center, Governor Drive,

Gen. Trias, Cavite.

March 22 – 24, 2006

FROILAN F. YARANON

Guthrie-Jensen Consultants to Management

Leadership Appreciation Workshop

Guthrie-Jensen Consultants to Management

In-House – Interpolymer Corporation

November 06-08, 1992

Supervision

In-House – Interpolymer Corporation

October 06-08, 1992

Applicant



Contact this candidate