Experienced Positions (in PTB)
30 years’ Experience in LNG Plant
Retired From Badak LNG Since 2017,May
Utilities Manager 2016
Process LNG & Utilities Manager 2015
Shift Coordinator 2014
Specialist Operation 2011
Commissioning & Start up specialist Operation in Yemen LNG 2010
Utilities Day & Shutdown Superintendent
Process Train Coordinator & Shutdown Superintendent
HAZOP Team for Process Train & Utilities Plants, Badak NGL
Process Train Supervisor
Train G Commissioning and Start up, 1992
Responsible for starting up Process Train covering CO2 Removal, Dehydration/Mercury Removal, Fractionation, Refrigeration and Liquefaction units and Utilities Units
Experienced Professionals
PT Saipem Indonesia (a subsidiary of Eni S.p.A Italy, May 2013 ~2014
Front End Engineering Design Floating Liquefied Natural Gas of Abadi Filed Development Project capacity 2.5 MTPA
Client: Inpex Corporation, Pte Ltd
Operation and Liquefaction specialist
Main responsibilities:
-Preparing deliverables for project
-Review documents from other disciplines which related to LNG operations and liquefaction process
-Participate and advise on HAZIP meeting
-Q-Captain for operation flawless project deliverable by providing mitigation action to prevent flaw during project phases and ensure those mitigation actions to be amended into relevant deliverables
-Contribute and provide technical advice related to LNG operation and liquefaction process
-Participate and advise for PID’s review and HOZOP meeting
Yemen LNG, Yemen
2010 Commissioning and Start up Coordinator for Yemen LNG.
Responsibilities included:
Coordinated the on-shift operation pre-commissioning, commissioning for starting up Process Train covering CO2 Removal, Dehydration/Mercury Removal, Fractionation, Refrigeration and Liquefaction, Utilities Units.
Coordinated the on-shift operation pre-commissioning, commissioning for starting up Blowdown system
Badak NGL, Indonesia
2006
Process Day & Shutdown Superintendent
Responsibilities included:
Coordinated the on-daily operation of four LNG Process Plant with capacity of 760 M3/hr each at maximum production.
Supervised 90 personnel, consisting of 10 Supervisors, 18 DCS Panel Operators, and 72 Field Operators.
Coordinated all activities of LNG Process Plant operation, such as ensuring a safe and efficient operation of all facilities.
Maintained good coordination and communication with other section to minimize impact of changes in shared resources.
Evaluated and monitored the Process Plant operation to maintain good Thermal Efficiency, Product Quality and Environment Program.
Minimize potential accidents by keeping the safe work practices all activities.
Proposed and implemented the approved carrier development program for subordinates, including yearly appraisal, training, internal rotation, and job exposure.
Develop shutdown package for operation.
2005
Badak NGL, Indonesia
Process Shift Supervisor
Responsibilities:
Coordinated the on-shift operation of four LNG Process Plant with each capacity 760 M3/hr. at maximum production.
Supervised for 22 subordinate personnel, consist 4 DCS Officer, and 18 Field Operator.
Coordinated all activities of LNG Process Plant operation, such as ensuring a safe and efficient operation of all facilities.
Maintained good coordination and communication with other section to minimize impact of changes in shared resources.
Evaluated and monitored Process Plant Thermal Efficiency, Product Quality and Environment Program.
Minimize potential accidents by implementing safe work practices in all activities.
Conducted carrier development of subordinate, included for yearly appraisal, internal rotation, and job exposure.
2000 – 2001
Badak NGL, Indonesia
DCS Retrofit Project Coordinator
Responsibilities:
Coordinated all activities of DCS Retrofit Project in Utilities and Process Plant, such as ensuring the project to be completed in timely manner and all facilities are in good working.
Proposed the modification of control system from analog to DCS system.
Prepared training module for operator in DCS system operation.
1990 – 1994
Badak NGL, Indonesia
Lead /DCS Utilities & Process Operator.
Responsibilities:
Coordinated the on-shift operation of 7 Water Well Pumps with the capacity of 250 M3/hr each, 2 unit Water Treatment Plant for Boiler Feed Water, 2 unit Water Treatment Plant for community, 10 Cooling Water Pump with the capacity of 650,000 gpm each, and 2 unit domestic waste water disposal treatment.
Supervised 6 Field Operators.
Coordinated all activities of Utilities Plant operation, such as ensuring a safe and efficient operation in term of chemical usage, water consumption, and keeping all equipment work well in all facilities.
Keep equipment in good working order by monitoring, and deciding when repairs are needed.
Maintained good coordination and communication with other section to minimize impact of changes in shared resources.
Minimize potential accidents by keeping the safe work practices all activities.
Courses/Seminars Attended
2010 APCI Seminar LNG Owner USA as co-author
2008 Supervisory LNG Indonesia as participant
2005 DCS Centum 3000 Singapore as participant
Education
2004-2009 : BS in Chemical Engineering, University.
2001 : Diploma Oil & Gas Academy, Cepu Centre of Java.
1981-1984 : Senior High School:
Bontang, October 02nd 2018
Wibisono Triatmojo