Personal Information
Name : SHARMA YOGESH KUMAR
Address : H.No. 1-5/1, Plot no 17, Balaji Colony, Balaji
Nilayam
Jillellaguda Hyderabad 500079.
Contact No : 863-***-****
E-Mail Address : adncsu@r.postjobfree.com
Personal Profile : Having 15 Years of Experience in various
profile in project
execution, design, Drafting and Project Management,
Comprises of MEP Services, Installation testing
commissioning of Air Conditioning Chillers air cooled
and water cooled, DG installation air cooled and
water cooled, Boiler installation Gas Fired and
Diesel fired, Exhaust and ventilation system for
Kitchen, Laundry, STP, WTP Plant Room and parking
lots. Air conditioning and exhaust ducting (GI and
MS) chilled water, refrigerant, drain, drinking,
hot and cold water Piping CU, MS, CPVC, UPVC and PVC.
Insulation puff, selections, nitrile rubber, (open
cell and close cell) foam under deck and acoustic
insulation cladding sheet and jacketing.
Education Qualification:
Sl.No Course Name of Institution Completion Percentage
of year of Marks
1 Hvac Design and Superior Technologies 2006 NA
Drafting
Hyderabad
2 AutoCAD Engineers CAD Centre 1998 3.4
, Ameerpet,Hyderabad
3 Diploma in Quli Qutub 1998 68%
Mechanical Government
Engineering Polytechnic Hyderabad
, Telangana
4 Secondary Vivek Vardhini Boys 1994 63%
School High School,
Certificate Jambagh, Hyderabad
Sl.No Languages Known Speak Read Write
1 English YES YES YES
2 Hindi YES YES YES
3 Telugu YES YES YES
Work Experience : June 2019 to Feb 2021.
Employer : DBJ ENGINEERING LLP
Job Title : New Chiller and DG installation at American Embassy
New Delhi.
Position : Asst Project Manager (Mechanical)
Description : Fabrication of structure for Chiller and DG,
Laying of grating on : structure SS CHW Piping and DG fuel
piping and mountings.
Job Title : Chiller Replacement and OA Modification
Position : Asst Project Manager (Mechanical)
Description : Successfully completed the American Consulate Mumbai
and
American Embassy New Delhi, Project, Involves the
Stainless steel CHW piping and structure for air
cooled chillers, replacement of chilled water pumps
modification of air handling units, installation of
packaged units and DG structure and installation,
along with DG fuel piping . Ventilation ducting and
minor plumbing works.
Chillers Replacement and OA Modification at American
Consulate Mumbai. Dismantling and discarding the
existing air cooled chillers 2 No's and fabrication
of SS structure for New Chillers 3 No's and
installing them along with necessary SS CHW piping,
removing the existing primary CHW Pumps 2 No's and
Casting of inertia pads installation of new primary
Pumps 3 No's along with the necessary piping and
mountings, installation of self-contained AHU 1 No's
DX system, installation of TFA UNIT 1 No's.
modification of existing TFA Unit 1 No's, and
miscellaneous piping and heater installation in the
duct work.
Work Experience : April 2017 to March 2019
Employer : Solutions Inc. New Delhi
Job Title : Hotel Radisson Blu, Gorakhpur, Uttar Pradesh.
Position : Project Manager (MEP)
Description : Project management Involves Coordination with
Vendors, Architects,
Contractors regarding relevant activities, checking
all the concern Test Certificates of Material
supplied as per approved makes and quality. Planning
and Scheduling the Activities to achieve the targets
updating site progress to client. Installation
Testing and commissioning, Validating vendor's
measurements, Completion and coordinating with
various equipments suppliers and providing the
operational training to the end user.
Work Experience : July 2016 to March 2017
Employer : Johnson Controls Hitachi Air Conditioning India Ltd.
Job Title : GMP ITC Office building.
Position : Project Engineer (HVAC)
Description : Project Execution,Completed the installation of
AHUs, VAVs in duct,
crosstalk attenuators, MS Duct for kitchen exhaust, Toilet
exhaust,
basement ventilation, HRW .Adiabatic coolers. Stair case and
lift lobby
pressurisation, STP exhaust chilled water piping connections to
water
cooled chillers with ball etch cleaning system etc.
Work Experience : June 2014 to June 2016
Employer : Solutions Inc.
Job Title : Hotel Feathers, Chennai, Tamil Nadu
Position : Asst.Project Manager (MEP)
Description : Project Management oversee the site execution
activities, coordinating with the architects and
consultants for approvals and modifications if any at
site seeking clearance from client and verifying and approving
the contractors measurements and bills. Inspection of materials and
verifying with the approved makes and checking the
respective materials test certificates
Work Experience : June 2011 to May 2014
Employer : Solutions Inc.
Job Title : Hotel Trident, Hyderabad, Telangana
Position : Asst.Manager (HVAC)
Description : Project ManagementSuccessfully completed the
HVAC, Kitchen ventilation, STP exhaust, car parking
ventilation, air washer, kitchen scrubbers, AHU,
FCU, chilled water piping, drain piping and
Ventilation fans .cooling towers installation testing
and commissioning @ Hotel Trident Hyderabad
Telangana .
Work Experience : Feb 2010 to May 2011
Employer : LG Electronics (Direct Service Centre)
Job Title : Hyderabad, Telangana.
Position : Team Leader (HA)
Description : Conducting daily calls closing reviews with
field technicians
Motivating them to achieve the targets providing
better service to customers and focus on selling AMC.
(Annual Maintenance Contract)Handled the customer's
escalations, provided the solutions to the customer's
escalations after sales, motivated and achieved the
AMC targets assigned through the field engineers and
resolve the customers queries and educated the
customers on usage of appliances by providing them
the demonstrations.
Team strength : 35.
Software tools : LG.CSNET, GSFS
Work Experience : Feb 2008 to April 2009.
Employer : VK Building Systems MEP Contractors and building
automation
Job Title : Hyundai Motors R&D Centre, Hyderabad, Telangana
Position : Design Engineer
Software tools : AutoCAD.MS OFFICE
Description : Project Execution and Shop Drawings, As Build
Drawings
Preparation, checking the inventory of consumable
materials and alert the purchase Department for
procurement if any. Submitting RFI's to client
monitoring the site execution activities and briefing
the contractors.Prepared shop drawings at site, over
see the site execution activities, and provided
marking where ever the duct and pipe penetrations
occur in building while pouring the concrete for
respective services, at Hyundai R&D Centre,
Hyderabad. Prepared the coordination drawing,
verified the installation of ducts, pipeline, ahus,
and fcu, in accordance with approved drawings.
Work Experience : June 2007 to Feb 2008
Employer : UV Consultants
Job Title : Reliance Retail Ltd. Towlichoki Hyderabad, Telangana
Position : Design Engineer
Software tools : AutoCAD.MS OFFICE, carrier block load (E20)
Ductulator, HAPPrepared tender drawings, shop
drawings after the award of project, and monitored
the site execution.
Work Experience : April 2005 to June 2007
Employer : Vijay Cad Solutions
Job Title : Providing Training on AutoCAD, Microstation, HVAC
Design and
Drafting Job Works.
Position : Design Engineer
Software tools : AutoCAD.MS OFFICE, carrier block load (E20)
Ductulator, HAP.
Provided training on Auto Cad, Microstation-J and
HVAC design and drafting,
PERSONAL DETAILS:
Father's Name : SATYA PRAKASH SHARMA
Date of Birth : 29th Sept1978
Languages Known : English, Hindi and Telugu
Nationality : Indian
Current CTC : 12 Lacks
Expected CTC : (Negotiable)
Sex : Male
Marital Status : Married
Religion : Hindu (Brahmin)
Nationality : Indian