JACK DE GRACIA LABAJO
*****.**@*****.***/*********@*****.***
OBJECTIVE:
•Seeking an opportunity to work in a challenging, innovative and advance environment in order to enhance my skills as Electrical Supervisor to its fullest potential and actively participate in providing total solutions for the achievement of the company’s goal.
SUMMARY OF QUALIFICATION:
•Registered Electrical Engineer with Philippines License No.0036381 in year 2005
•Full experience in Petrochemical, Power plant, Oil and Gas (offshore and onshore) Industries in the field of Electrical Engineering.
•In-depth knowledge of High, medium and low voltage distribution.
EMPLOYMENT HISTORY:
Company: SAMSUNG ENGINEERING COMPANY LIMITED
Position: Electrical Supervisor CFP-Project
Project: ADNOC- CRUDE FLEXIBILTY PROJECT (PKG#3- RRW)
(SUB-010, SUB-016, SUB-001, SUB-002, SUB-021, SUB-023, SUB-024 and SUB-027)
Location: Al Ruwais, Abu Dhabi, United Arab Emirates
Date: August 3, 2019 – June 13, 2021
Job Description:
Under direction of Superintendent, perform the duties as instructed and proper work execution with other supervisor
Guides, directs, evaluate, review and supervises subordinates and subcontractor to work as per approved layout drawing from grounding to Power system to ensure they contribute effectively
Check the work progress status of responsible area and assure that the work conforms to all technical requirements.
Expedite the delivery of the material which was schedule to be supplied by subcontractor and preparing the documents necessary for regular meetings, for both construction plan and progress review.
Reviews the electrical equipment data’s of all new panels to ensure conformity with established standard as per specification of the project.
Area Supervisor at revamping area of cable pulling, lighting installation as per approved construction lay out.
Coordinate to SI manager any problem, engineering and reports for any changes as per site condition and provide proper resolution.
Make an as-built drawing as per site condition and forward to Engineering for approval prior to applied site construction work.
Supervise EHT installation at Unit 1900 as per approved construction layout drawing and Participate punch closing for completion of the project.
Conduct Motor Solo Run, re-termination of control cable trouble-shooting (Module cannot start due to connection was wrong) and making schedule under MSR and notify to ADNOC Electrical, IPMT-CFP, Mechanical and QC Samsung to attend the said MSR schedule.
Can interpret Electrical drawing such as Single Line Diagram and Schematic Diagram.
Permit Holder at RRW-AREA with new system (WMS-System) with ref. ID no. RAS/20/0618
Company: GS Engineering & Construction
Position: Electrical Supervisor
Project: ADNOC-Ruwais Refinery West – Unit Restoration Project (RRW-UR)
Location: Al Ruwais, Abu Dhabi, United Arab Emirates
Date: August 28, 2017 – October 31, 2018
Job Description:
•Take charge of demolition and restoration project such as Power, Lighting, Telecom, Fire Alarm and Cathodic Protection System.
•Interpret, analyze and create the following:
Electrical Single Line Diagram (contains the overall electrical equipment, ratings, panels, loads and connections), Cable Route Plan (layout of tray and trenches), Bill of Quantity (list of materials to be used during construction), Material Requisition for Power, Earth and Lighting, Cable and drum Schedule
•Prepare the following document
Cable Schedule and Drum Schedule, Bill of Material and Material Requisitions
•Supervise cable pulling work for Power, Lighting, Telecom, Fire Alarm and Cathodic Protection System.
•Develop and review estimates and schedules, progress reports, including manpower forecasts.
•Monitoring of daily activities at site, Prepare daily report & Checking of Sub-con daily progress and Participate for punch closing activities.
•Conduct Motor Solo Run with drive voltage at 11KV, 3.3KV and 415V.
•Preparation of MSR packages (No-Load Test)
Motor data, Test sheet, Power Layout Drawing, Single Line Diagram, Forecast for Motor SOLO Run schedule and Notify to Electrical QC and Mechanical Dept.
Company: JGCS Consortium – Zone 3 / GS Engineering & Construction
Position: Electrical Supervisor (In-charge of SAT activity for LV switchgear (L&T) and Dry Type Transformer
(RAYCHEM) from 800KVA-2000KVA)
Project: Nghi Son Refinery & Petrochemical Project (NSRP)
Nghi Son Economic Zone, Tinh Gia District
Location: Thanh Hoa Province, Vietnam
Date: April 21, 2015 – March 30, 2017
Job Description:
Under direction of Superintendent, perform the duties as instructed and proper work execution with other supervisor
Guides, directs, evaluate, review and supervises subordinates and subcontractor to work as per approved layout drawing from grounding to Power system to ensure they contribute effectively
•Check the work progress status of responsible area and assure that the work conforms to all technical requirements and Performs Inspection of items and test reports by preparing daily log, weekly, monthly construction schedule within the area assigned
•Take lead in condition monitoring report analysis to identify potential equipment failure and improvements and Expedite the delivery of the material which was schedule to be supplied by subcontractor and preparing the documents necessary for regular meetings, for both construction plan and progress review.
Reviews the electrical equipment data’s of all new panels to ensure conformity with established standard as per specification of the project and inspection of unpacking and receiving of material/equipment by analyzing electrical and instruments equipment history data in terms of failure analysis and spare consumption.
•Assist in preparing start-up commissioning procedures for electrical systems, Pre-commissioning and commissioning on electrical equipment DP, MCC Panel and Dry Type Transformer. Conduct Bus Bar IR test & Contact resistance. CT testing such as IR test, Polarity check, CT ratio test, Knee Point Voltage test and VT testing such as IR test, Polarity test, VT Winding Resistance Test and VT Ratio Test.
Company: GS Engineering & Construction
Position: Electrical Operator
Project: TAKREER - Abu Dhabi Oil Refining Company
Ruwais Refinery Expansion Project 7 - MARINE FACILITIES
Location: Abu Dhabi
Date: November 11, 2013 – December 31, 2014
Job Description:
•Take charge on electrical equipment in all Substation; Sub-022, Sub-033, Sub-032 & Sub-031 and also SIS-080, 081 & 082.
•Testing and commissioning on electrical equipment such as MV/LV switchgear VCB and ACB breaker maker of L&T (Larsen Toubro)
•Check electrical circuit connection is done correctly as per schematic diagram and cable termination and Ability to interpret and work instructions power generation, transmission and distributions networks, transformer, switchgears, and motors, electrical control and protection systems and metering.
•To download the relay coordination for management relay such as F60, F35, MM300, FM2 and MIF II relay.(GE)
•Carried out IR test MV/LV busbar, Transformer 11KV/415V and resistance test and isolation of electrical circuits, issues danger notices as authorized and update LOTO.
•Conduct interlock test from upstream to downstream and intertrip test 51, 50, 50N, 50G, 27P and 86T(using secondary injection kit by OMICRON)
•Carried out line checking and IR test before energized the equipment of Switchgear MEP, VSDS, PC, SEC & SIS to field.
•Carried out functional test on test mode, Loop check from DCS via IRP at BERTH - G, HJ, and VRU. Rotational check and motor solo run test.
•Supervise on-going work with KESCO, ABB, L&T MV/LV and GUTOR vendor, wiring modification, replacement of module, IPCS communication and charging & discharging of batteries.
•Diagnose and rectifies faults on electrical equipment and associated control gear, switchgear, motor control center and Electrical Heat Tracing System HV/LV (EHT).
Company: KEPCO-SPC Cebu Power Plant
Position: Switch Board Operator/ Turbine Local Operator
Project: 2x103MW CFBC Coal Fired Power Plant
Location: Colon, Naga City, Cebu Philippines
Date: January 12, 2010 – November 12, 2013
Job Description- Switch Board Operator
•Records readings of switchboard instruments to compile data concerning quantities of electric power used for substation operation and amounts distributed.
•Conduct Start-up & shutdown during Plant start-up or shutdown at (ECP) Electrical Control Panel and (MCC) Motor Control Center room.
•Operates switchgear to regulate and transfer power loads to protect maintenance workers engaged in repairing or cleaning equipment.
•Records gauge, temperatures and meter readings, malfunctions of equipment, switch board instruments or controls on switchboard and panel boards at specified intervals.
•Conduct checking for any abnormalities at Generator Circuit breakers, Power and Instrument Transformers, switch gears, Battery, UPS, Motor control center (panel), and at Gas Insulated Switch gears.
Job Description - Turbine Local Operator
•Perform start-up and shutdown of Turbine Lube Oil and Control Oil system.
•Turning gear operation by manual operation if not work in Auto operation by DCS.
•Turbine Differential and Casing Expansion monitoring at local such as HP Casing Expansion, HP Differential Expansion, I/LP Casing Expansion, Shaft Position, I/LP Differential Expansion.
•Conduct AVT (Auto Valve Test) in every 6 weeks such as stem free test, Solenoid trip test and NRV test.
•U-Seal filling of GSCF and Vacuum breaker of condenser in every 1st after shift of duty.
•Monitoring and patrolling throughout the plant premises to ensure and keep all machineries in normal operation condition.
Job Description- BOP-2 / Auxiliary Operator
•Intake Facility operation, Trash Rake operation, Sea Water Pump Operation, Traveling Water Screen Water, Hydro-pneumatic Tank Filling, Condenser Vacuum Pumps operation.
•Controls and maintains auxiliary equipment, such as pumps, fans, compressors, filters, feed water heaters, and condensers that supply water, fuel, lubricants, and auxiliary power for turbines.
•Condenser operation, Debris Filters operation, Condenser Tube Cleaning Systems.
•Conduct Expansion Joint Filling of Condenser up to desired level in every 10 days.
•Perform monthly test and change-over the major equipment.
•Communicate to Turbine Board Operator during start-up, shutdown and emergency and any activities perform at local.
•Performs plant start-up, shutdown and emergency or trip conditions in local equipment.
•Reads temperatures, pressure and R.P.M gauges to verify that units are operating at specified capacity, and listens for sounds from machinery that warn of mechanical malfunction.
Company: CEGELEC Oil & Gas
Position: Electrical Commissioning Technician
Project: EPSU- (Electrical Power Supply Upgrading 11KV)
ADMA – OPCO, USSC (Offshore)
Power Generation Integration Phase II Project (ADCO PGI & GASCO ABICS Project)
ADCO-Abu Dhabi Company for Onshore Oil Operation (ADNOC)
Location: Abu Dhabi, U.A.E
Date: June 6, 2007 to December 30, 2009
Job Description: - ADMA – OPCO, USSC (Offshore)
•Involved in Erection, Testing and Commissioning up to 220kV GIS Switchgears, 2 MVA Generators and 30 MVA Power Transformers, Auxiliary Transformers, Isolators, CTs, PTs, Capacitor Banks, LV & HV Switchgears, Battery Chargers, Fiber optic, RTU, RTCP, Tele protection Panels, Testing & commissioning.
•Preparation of pre-commissioning check lists, test reports, as built drawings, cable schedules and detailed commissioning schedules and Testing of individual Vacuum Circuit Breaker Rated 800 A, Retrofit type (Areva Panel).
•Testing of Transformer Stability, CT’s (Protection and Measuring) and 64 REF Stability and Sensitivity.
•Carried out if necessary calculations for sizing of electrical equipment like Distribution transformers, MV & LV switchgears, CTs, VTs, MV/LV cables.
•Developed electrical control schemes, directed the preparation of equipment layout and single line diagrams for various electrical installations.
•Reviewed documents like design calculations, drawings, specifications & data sheets to ensure conformance with standards and codes and conducting FAT for technical and functional requirements of electrical equipment
•Supervised installation, testing, and commissioning of electrical installations of assigned projects, to ensure conformity with specifications, drawings, ongoing standards, codes.
Job Description: - ADCO-Abu Dhabi Company for Onshore Oil Operation
•Carryout Design and coordinated in installation, testing and commissioning of 11 KV substations, MV/LV switchboards, bus ducts, Rising mains, MCCs and MV/LV control cables .
•Participate in shutdown and major activities by carrying out shutdown preparation, data collection and condition monitoring duties and in shutdown job of gas turbine 4, 5, and 6 at power station @ ADCO BUHASA for modification
•Experienced with test and measurement equipment including hipot tester, primary injection kit, secondary injection kit, high voltage tester, megger, and multimeters, etc.
•Commissioning and test for two ABB three- phase transformer 20/25MVA, 33/11.5KV for testing alarm and trips such as oil temperature, HV temperature and LV temperature.
•Commissioning of RTCP, remote and local in all indication alarms and trips such as fans failure, AVR failure, buchholz’s relay, oil level OLTC, oil temperature, HV temperature, LV temperature by raise and lower command.
•Modification for LV door feeder 2.1 and feeder 1.1 from new two ABB three-phase transformer 33/11.5KV, 20/25MVA by termination and installed new relays such a line protection relay (7SD61) by Siemens, Series 80 for protection by Merlin Gerin and Sepam 100 for restricted earth/ fault relay.
•Testing of individual equipments such as CTs, PTs, Breakers (SF6 /Vacuum /oil /air), Isolators, Earth switches and protection relays in 220/132/ 33/11/6.6/3.3/0.415 KV Switchgears located in various industries and power plants Outdoor and GIS Substations.
•Testing of Power Transformers up to 100 MVA (rating - 220/33 KV Auto, 132/33 KV, 110/11 KV, 66/11 KV, 33/11 KV, 11/0.415 KV and type Dyn11, Ynd11, Ynd1, Yna0d11, Yy0 and Dd0 with OLTC, protection schemes-Differential, REF Stability, various protection tripping, interlocks, inter-tripping and Control and Relay panels (CRP) of various substations (220/132/33/11 KV) and their overall scheme checking
•Preparation of detailed work schedule, drawings, cable schedules to carry out the shutdown work for modifying or upgrading the existing electrical systems such as additional bays in existing substations, additional panels to existing switchgears.
•Testing of various types of static and Numerical relays of SIEMENS, ABB, and AREVA, MERLIN GERIN.
Company: CEGELEC Oil & Gas
Position: Electrical Commissioning
Project: Zakum West Super Complex (ZWSC) OFFSHORE
Collector switchgear Platform (CSP)
Location: Abu Dhabi, UAE
Date: January 1, 2005- March 30, 2007
Job Description:
•Carries out modification work on circuit and control wiring as per approved drawing and / or under close supervision.
•Produce schematics to enable updating and production of “as built” drawings and Performing IR test of power and control cable
•Participate in the assigned plant shutdown activities and ensure timely completion of job activities
•Erecting and panel setting of electrical equipment inside the power barge such as switchgear panel by Schnieder Electric and new 11KV dry type transformer.
•Apply secondary injection test for Miccom relay, carried out in ACB racked out condition.
Company: CEGELEC Oil & Gas
Position: Electrical Commissioning
Project: Bunduq Oil Producing Company (OFFSHORE)
Offshore Boundary of U.A.E. and the State of Qatar
Job Description:
•Installation and modification of newly supplied SEPAM relay, ammeter and MVAR meter, line protection relay (GE), lock-out relay, trip supervision relay and restricted earth fault relay for their upgraded panel and Isolation and energization of LV switchgear
•Pre-commissioning and commissioning of LV switchgear, test and setting of devices accordance to the required relay coordination setting.
•Apply secondary injection test for Miccom relay and carried out in ACB racked out condition prior before testing and Conduct IR test on ACB breaker
Company: CEGELEC Oil & Gas
Project: ABICS PROJECT (Asab Bab Integrated Control System)
GASCO-Abu Dhabi Gas Industries Ltd. (ADNOC)
Position: Electrical Commissioning
Job Description:
• Plan, arrange, lay out and set up electrical plans, visual inspection, manpower and material manages the work daily as per the project schedule
• Log and interprets the schematic diagram of Cable wiring and termination of power and control cable
• Termination and loop checking using fluke multimeter 1587 with insulation tester of electrical cable and instrument cable from control room, substation to field.
• Inspection and checking of the connection with grounding of cable through the devices.
• Supervise of all substations in Gasco Bab, such as SS1, Booster Station, SS3, SS4, SS5 and LGS(Lean Gas Station)for laying cable for power cable, control cable and termination from LV panel to distribution board, UPS panel, battery, Isolation board and distribution board.
• Erecting and panel setting of electrical and instrument equipment inside the substation such as UPS, DCS, IRC, VMS, LV panel.
• Pre-commissioning, commissioning and testing of electrical panel, instrument and fire and Gas System, smoke & heat detectors on substation, control room, battery room.
• Involved in calibration of different type of instrument such as flow transmitter, pressure transmitter, temperature transmitter, level transmitter, differential transmitter by using hurt communicator or hand pump and limit switches. Make by YOKOGAWA INST.
Company: VECO Phil’s. (Visayan Electric Company Inc.)
Position: Sr. Surveyor
Project: GIS (Geographic Information System)
Location: J.Panis Banilad, Cebu City Philippines
Date: September 1, 2003 – December 30, 2004
Job Description:
Conduct surveying from transmission line from downstream substation to distribution line.
Observe phase sequence line and cable size of the transmission line to substation and mark-up on the drawing.
Record all attached in pole details and transformer KVA rating and the meter quantity.
Update all records in the server data.
EDUCATIONAL BACKGROUND:
COLLEGE - Cebu Institute of Technology - University
Bachelor Of Science In Electrical Engineering
VOCATIONAL- Industrial Electricity
Don Bosco Technology Center
VOCATIONAL COURSES ATTENDED:
Auto Cad Design 2D and 3D
Instrumentation & Control Of Electrical Equipment
Electro-Pneumatic And Programmable Logic Control
Industrial Electricity
TRAINING / SEMINARS:
1. PTW (Permit to Work Holder with Certificate ref. no. 1379)ADNOC Refining West (ABU DHABI NATIONAL OIL COMPANY)December 22, 2019
5. Gulf Technical & Safety HUET / SEA Survival Training Centre (GTSC) Mussaffah, Abu Dhabi U.A.E- August 20 – 21, 2007
2. Efficient Electrical System Design in Compliance to the requirements of Philippine Electrical Code (PEC 2017) with Value Engineering Principle Institute of Integrated Electrical Engineers (IIEE) Cebu Chapter- March 29-30, 2019
6. Abu Dhabi Gas Industries Ltd. (GASCO) Habshan, Abu Dhabi U.A.E Health and Safety Environment (HSE) GASCO Dept. Person in Charge in Work Site-July 8, 2006
3. Philippine Electrical Code 'PEC' Electrical design and Installation of Commercial / Institutional Buildings and Industrial Plants Part 1 Institute of Integrated Electrical Engineers (IIEE) Cebu Chapter April 6, 2013
7. Competency Training in Power System Apparatus Testing (PAMAV)VECO, Banilad Complex, Cebu City April 23-24, 2006 Cebu State College of Science and Technology Philippines Electrical Code- February 8, 2003
4. CEGELEC, Abu Dhabi U.A.E C18-510 Electrical Safety Induction- October 2, 2007
8. University of Cebu- Power Plant maintenance- February 22, 2003
9. Al Mansuod, ADMA - OPCO Abu Dhabi U.A.E- Health and Safety Environment (HSE) Induction / Offshore-September 25, 2007
Organization:
•Institute of Integrated Electrical Engineer (IIEE)
Lifetime Member
Cebu City Chapter
PERSONAL DATA:
Date of Birth : January 16, 1979
Place of Birth : Cebu City, Philippines
Sex : Male