AFTAB KHAN
Contact Me
aftabkhanmajeed@gmail
.com
White House Near
chirag Hotel Kalyan
West
Kalyan,India
Other Info
Skills
Design Software(Basic):
AutoCAD, AutoDesk
Inventor, Solidwokrs, familiar
with
ANSYS,
Productivity improvement,
Project
Management Techniques,
Manufacturing Process, Supply
chain
Management Techniques
Computer Skills: Ms Power
Point, Ms
Word, Ms Excel
Soft Skills: Flexibility, Work
About Me
The skills and qualities I possess that will make me effective in this Quality Control job position include, confidence in my abilities, outstanding technical
skills, a thorough understanding of the quality control process and how it fits into a variety of different scenarios, good leadership, planning and Client
Handling ability.
Experience
2020 - Upto
Present
Perfect Instrumentation Control Pvt Ltd
Quality Control Engineer
Performing a role as process and supplier quality
engineer.
Conducting internal specifications meeting during
development of parts with engineering and purchase team.
Actively participate in engineering changes and
implements for cost saving in products by VA/VE
analysis.
To supports supplier for resolving issue of developing and regular supplying parts, for creating and
sustaining process control standard.
Visited customer sites personally to conduct field test and to solve problem.
Maintain supplier contacts by being proactive and
reactive to all supplier related concerns.
Monitor and revise quality documentation as
required.
Monitoring the supplier performance trends, Taking Ethics
Adaptability, Analytical
Thinking,
communication skill.
Awards
ACTIVITIES
Industrial Visit at Cold Storage
Plant
Turbhe.
Industrial Visit at Bhandup
Water
Treatment Plant.
Industrial Visit at Police
Automotive
Service Centre Byculla.
Languages
English, Hindi, Marathi, Urdu
Interest
Research on New Technology,
Reading Books.
Others
References
INDUSTRIAL TRAINING:
Central railway carriage
workshop (matunga)
Indian railway diesel loco shed
(kalyan)
Agnee engineering (vasai)
remedial actions as needed.
Instruct and train personnel in techniques of audit and use of testing devices.
Visit customers and suppliers when need to act as a liaison to internal and external
customers.
Maintain customer complaint log and facilitate and participate in the corrective action process.
Implementing 5-S and to enhance and obtain better
output.
Preparing check sheets for audit and inspection of final product and performing the same.
Preparing control plan for inspection of parts.
Performing inspection of parts as per the control plan and check sheets.
Aware and worked on quality systems like,8D
reports, CAPA,QUALITY BASICS & 5S.
Participated in all QA process such as developed
Control plans and also Process flow diagrams.
Exhibition on team work like CFT, new product
development.
Inspecting weld set up for SS work.
Root cause analysis for product failures solution to the identified issues.
Conducting assembly fitment trials for newly
developed parts and hydraulic pressure test at
customer end.
Education
2017 - 2020 Mumbai University B.E Mechanical Engineer CGPA-8.06
2014 - 2017 MSBTE Diploma In Mechanical Engineering 78.06%
2013 - 2014 Maharashtra Board SSC
87%
Projects
Dec-2019 -
March-2020
Parle-G Evaluating Challenges Of INDUSTRY
4.0 Initiatives For Manufacturing Plant.
The project is done in the Parle Industry where the rejection of biscuits is done manually and also in the packing department the packing is the manually
which take lots of time and manpower.
We have done the whole system automation with the
use of different sensors and industry 4.0 technics. Trash Cleaner
In this project, the proposal concept is to replace the manual work in drainage cleaning by an automated
system. We know that water has a great importance
in human being life, the water flow in a drain full of wastes like polythene, bottles etc. The drains get blocked due to these
wastes in water. Drainage is using for the disposal and unfortunately, sometimes there may be a loss of
human life while cleaning the blockage in the
drainages. To overcome this problem and to save the human life we implement design “Trash Removal
System”.
We designed our project to use this in an efficient way to control the disposal of wastages and with regular filtration of
wastages. This machine also uses the battery for
power supply and is the locomotive system.