JEROME V. BINAMERA
CP#093********
Address: **Kingswood St., Brixtoneville Subd., Brgy. 175, Caloocan City
Personal Data:
Birthdate: November 04,1984
Birth Place: Gabao, Irosin, Sorsogon City
Age: 36 yrs. old
Gender: Male
Civil Status: Married
Citizenship: Filipino
Religion: Roman Catholic
Height: 5’5”
Weight: 75 kg.
Language: English, Filipino and Arabic
Work Experience:
Present Job:
Q.C/Q.A Process Inspector:
Company Name: Saudi Steel Pipe Company (SSP)
Address: 2nd Industrial Dammam, Saudi Arabia
Working Year: October 12,2014 until October 19,2019
Job Description:
Forming of steel pipes:
1).As Q.C Inspector I ensure that the customer procedure will follow according to INSPECTION & TEST PLAN(ITP).
2.)Next is dimensional measurement using vernier califer to check the outside diameter of pipes and measuring tape for length.
3.)Also I used micrometer for checking the raw materials(Coil).
4.)After I finish the visual and dimensional inspection I conduct the testing which is flattening test for welding.
5.)After the test is done the pipes will continue to the next procedure which is hydrotesting.
6.)After that the pipes will continue to marking area.
7.)Marking process is done the pipes will proceed to packing area.
8.)If,the pipes have defect I put hold card for investigation and make an Non-conformity report(NCR).
And send to engineers for final decision.
Incoming Inspection:
*Checking the raw materials before processing in production area.
*Comparing the tally sheet record coming from manufacturer of raw materials and products itself.
*Checking the thickness, width and weights of raw materials.
Loading Inspection:
*Routine check of finish product before delivered in customer.
*Ensuring that all finish products properly organized in delivery vehicles to prevent damages during transit.
*Make an NCR report if have discrepancy or damages during loading.
Previous Job:
Q.C/Q.A Inspector:
Company Name: Al-Jazera Factories For Steel Products
Address: Industrial Phase 4,Jeddah,Saudi Arabia
Working Year: December 01,2011 until January 29,2014
Job Description:
1.)Galvanizing Process of steel pipes:
a.)For galvanizing process inspection 1st step is to check the zinc coating thickness by using elcometer:
*For ANSI C80.1/UL-6 must be 56microns above for all sizes(1/2”-6”).
*For BS,C,L and M must be 56microns above for all sizes(1/2”-6”).
*And for ASTM A53/SASO-H must be 77microns for all sizes(1/2”-6”).
b.)2nd step for inspection is hammering test for testing the zinc coating must be no flaking/peeling off.
2.)Threading Process Inspection Control:
a.)Threads condition:
*Shall have no:
1.Eccentric Defects
2.Tearing Defects
3.Angle Defects
4.Double Thread Defects
5.Crack Welding
b.)Threads Protection:
*Shall be uniform on cross section and threaded parts.
c.)Sampling and Test Plan:
*Threads of pipes shall be tested randomly as follows:
1.Length of threads
2.Set to ring gauge
3.Set to coupling
4.Thread appearance
5.Thread workmanship
*Frequency of checking must be every 1 hour.
Ater threading process is done the pipes will continue to finishing process.
3.)Finishing Process Inspection Control:
a.)Description:
*Appearance of galvanizing zinc coating.
*Legibility of marking specification.
*Condition of band marking.
*Condition of coupling engage on to pipe.
*End face condition of galvanized pipes.
*Threads condition and appearance.
*Marking specification.
b.)Standard Requirements:
*Shall be cleaned,smooth and free of defects inside and outside.
*Shall be visible to naked eye.
*Shall be legible and uniform without spillage.
*Shall be cleaned and without sharp protrusion in and out.
*Shall be free of burrs and other injurious defects.
Educational Attainment:
Elementary: Holy Spirit Academy Of Irosin
San Pedro,Irosin,Sorsogon
Year Graduated: 1992-1998
Secondary: Gabao National High School
Gabao,Irosin,Sorsogon
Year Graduated: 1998-2002
College: Sorsogon College of Criminology Inc.
Course: BS. Criminology
2003-2006
Undergraduate
TRAINING COURSE:
PHILIPPINE NUCLEAR RESEARCH INSTITUTE(PNRI)
Philippine Society For Non-Destructive Testing
Ultrasonic Testing Level-2
July 06-17,2009(80 hours of training)
References:
Mr. Fernando Orense
Vice Foreman
Saudi Steel Pipe Company
2nd Industrial,Dammam,Saudi Arabia
Mr.Reynaldo Orense
Senior NDT Inspector
Saudi Steel Pipe Company
2nd Industrial, Dammam, Saudi Arabia
I hereby certify that all the information given in this resume is true and correct to the best of my knowledge and belief.
JEROME V. BINAMERA
Applicant