JIJO RAPHEL THATTIL
Sr. Electrical Engineer
*********@*****.***
Skype id:-jothattil
Mob: +974-********
Curriculum Vitae-Electrical Engineer
MMUP (State of Qatar) Grade “B” Electrical Engineermore than 16 years of Experience, 12years’ Experience in State of Qatar in the Field of Electrical Engineering& Construction activities.
Experienced with the Oil &Gas and Energy producing& operating giants like Qatar Gas, Laffan Refinery, QP, Qatar Fertilizer Co (QAFCO), Kahramaa and KSEB Etc...
Good Exposure in Construction Installation, Testing commissioning activities of Power transformers, MV Motors, switch gears, and HV/MV/LVcables, Bus Ducts, GIS systems, substations (Up to 220 kV), co- generation plants.
Familiar with Specifications, International codes and standards used in electrical engineering Like BS, IEEE, ANSI, IEC, NEMA,NETA, Etc.. Requirements of IP, Atex and IECex
Quick learner with proved Career graph in excellent coordination capability with Client EPC Contractor and subcontractor levels, ability to rapidly achieve organizational integration Assimilates job requirements by employing new ideas, concepts and technologies.
Bachelor of Technology (B-TECH) Electrical & Electronics Engineering
(1st Class, 66.7%), MES College of Engineering, Kuttippuram, University of Calicut, India (2002-2006)
MMUP Grade “B” Certification by Engineering &Consulting Offices Accrediting Committee, Ministry of Municipality & Environment, Qatar (UPDA) (Renewal on 2022)
Training in Power Transformer Manufacturing at Transformers and Electricals Kerala Limited.
AutoCAD, Primavera Project Planner & MS Office (Word, Excel, PowerPoint), 3D Viewer.
MP-Lab, Mi power, ETAP, P-Spice, Power Factory, Schneider Eco Dial.
Qatar Gas/ LaffanRefinery- Diesel Hydro Treater (DHT), Waste water Treatment Plant
Qatar Fertilizer Co (QAFCO)- Qafco 5& 6 Expansion Ammonia/Urea Plant, Co-generation Plants, Utility Plant Systems, Bulk Storage, Overhead conveyor Systems ETC.
Kahramaa- Phase VIII Projects GIS substations up to 220/132/66/11kV & trans. Networks
Qatar Petroleum- 18” Multi product Pipe Line Project
Qatar Armed Force- Military Airport and Infra structure Development in the AL-Shamal Area.
Engineering Design, Site Construction Supervision and Interface/ tie- in/ Simops coordination
Authority Approval and authority inspection Coordination
EPC Engineering, Field Engineering and Design Coordination
Material Management&control, Review Technical Bid Evaluation, Manufacture record Book Etc.
Monitor the construction progress as per the schedule throughout the phases of the project
Site construction Coordination and leadInstallation, Pre-commissioning, Testing and Commissioning activities.
Participating in the safety walk troughs and identify the
Client, EPC, Contractor, Subcontractorand Vendor/ Specialist Coordination.
Provide Technical Trainings on Procedures and practices
Snagging De-snagging and Handing over
Hipot Kit, Transformer Turns Ratio Kit, Micro Ohm meter, Primary and secondary injection kits, Schneider full functional test kit, Meggar Insulation Testing Kit, Ductor test Kit
220/132/66/11KV Substations, Power Transformers, 220/132KV GIS switchgears, 11KV/6.6KV/0.44KV Switchgears, LV panels, DB’s, NGR, Neutral Grounding Transformers, Bus ducts, VFD, UPS, Battery Charger Units, ELICS & IRP Panels
132KV/11KV/0.44KV power cables, Control/FO cables, Lightning Protection systems, Grounding systems, Cathodic Protection, Heat tracing, Plant lighting and Power systems.
Cogeneration plants(GT’s(25MW) and ST’s(75MW)), 11/6.6/0.44KV Motors,
ELV, Fire Alarm, CCTV and Security Systems
Site Supervision and coordination of Engineering & Construction projects in Oil & Gas Refineries, Extra High Voltage Substations, Hi-Rise buildings & Infra structure works.
Familiar in Supervision Inspections, review of Contractor Sub-Contractor Prequalification’s Verifications. Verification & approval of concept Design, Shop/IFC Drawings, Method of statements, and Material approval submittals.
Familiar in EHV/HV/LV/ELV engineering/Site-construction operations/Tie-in/SimOps/ Commissioning, Coordination of Lockout tag-out and Permit system for high voltage substations..
Engineering Document preparation and review (Specifications/MAR/MRB/MOS/Vendor documents)/ field Engineering Coordination
Familiar in IP, Ex/ATex Classifications & procedures for Various Electrical Equip.
Good Exposure in GIS substations, Co-generation Plants(Steam turbines, Gas turbines), Sea water cooling tower etc…
Attend the Design workshops, FAT& Assembly inspections in factory, witness installation, Testing and commissioning of Electrical scope of work.
Responsible to ensure Quality and HSE standards though out in all stages of project execution.
Strong Leadership, Communication, Management and interpersonal skills.
Skilled in Trouble shooting and analysing the circuit parameters.
Familiar with Project completion systems ICAPs, OPERCOM Etc.
Major Roles & Responsibilities
Responsible for supervise the project Electrical works in conformance with engineering design and specification requirements Kahramaa, QCS and QCDD.
Responsible to provide all necessary site instructions coordinating with the Resident Engineer and act as Point of communication with client and contractor Related to the Electrical Systems.
Responsible for attending the Factory visits during the Equipment/ Switchgear Panel assembly and FAT.
Inspection of high voltage Cable route and Cable installations in the project.
Preparation and Review of Design documents (Specifications, Electrical Load Summary, Cable list, SLD, BMS I/O List, Earthing Layout, Electrical Equipment Layout, Substation Equipment Layout, Cable routing Layout, Cable tray Layout, cable tray sections, Plant lighting, Bus duct layout, and material submittals)
Responsible for the KahraMaa Substation Supervision, Authority inspection and commissioning coordination.
Verify and validate the certificates and approvals for the contractor materials (Lighting, small power, Bus ducts, Motors/ control panels, ELV, Security and Fire alarm, Earthing and Lighting Protection)
Responsible to review and reply for the contractor’s RFIs and proposals.
Supervise and lead the electrical activities during various stages of projects, from Installation to Handing over.
Review and approve the submission documents from the contractor, Specialists, Commissioning agents, and manufacturers. (Shop drawings, materials, close out documents, etc.)
Carry out the inspections for the installations and material delivered in the site and monitor the quality and progress of the project Ensuring identification, review & correction of non-conforming products
Verify the Calibration certificates and validity for the testing / Measuring Equipments prior the commencement of the test.
Witness and verify the testing commissioning in the Electrical Control panels, and Switch Gears, Verify Testing & commissioning Reports.
Verify the control Panel and Switchgear Settings with Motor/Equipment Data sheets/ and Performance curves.
Witness the Pre-commissioning and Commissioning tests (IR, Winding continuity and Solo/ Load tests) in the motors and verify the test reports.
Participate in all health and safety issues at site, as required by the Resident Engineer.
Conduct handing over walk through with client engineers and Prepare snag list.
Managed efforts to ensure that projects are completed on time & within budget
Major Roles & Responsibilities
Sr. Electrical Engineer responsible for leading Engineering, Installation, commissioning, Start-up and handing over the project in complete customer satisfaction.
Preparation and Review of Design documents (Specifications, Load list, Cable list, interconnection diagrams, SLD, Scheme drawings and logic diagrams, ELICS I/O List, Earthing Layout, Electrical Equipment Layout, Substation Equipment Layout, Cable routing Layout, Cable tray Layout, cable tray and trench sections, Plant lighting layout, Bus duct layout, and material submittals) from engineering subcontractor considering the feed documents and Project spec guidelines.
Prepare Method of statements, Tie- in procedures, and interface agreement documents Inspection Test Plan & Procedures for the Activities
Equipment/ Material selection and Preparation of the LPO and follow up.
Follow up Mobilization vendor and Subcontractor as per the site requirements carry out the site surveys and arrange the vendor meetings.
Coordinate and manage the SIMOPS and Tie-In activities in the existing plant area facilities.
Coordinate the Lock out tag-out and Permit system with the concerned Authorities.
Coordinate work permit system for installation testing and commissioning of Cables, LCS, motor and Electrical switch board and lead the activities to ensure planned schedule followed properly.
Site Execution work progress Monitoring & Preparation of site progress and attend the client- Contractor meetings
Conduct the site surveillances and verify the drawings and site developments matching, if require suggest necessary modifications in the drawing and follow up with engineering contractor.
Verify condition of the material or equipment supplied, confirm material/FAT reports with specifications, and offer for inspection and conduct pre installation testing if necessary.
Follow up with vendors on Engineering activities and coordinate between other disciplines.
Verify the P&ID and Hook-Up drawings for the Equipment location and method of installation.
Follow up other disciple engineers for work front and other interferences
Coordinate for the Substation/ Plant commissioning and ensure all functions are verified as per approved check sheets.
Verify the Calibration certificates and validity for the testing / Measuring Equipments prior the commencement of the test.
Witness and verify the testing commissioning in the Electrical Control panels, and Switch Gears, Verify Testing & commissioning Reports.
Verify the control Panel and Switchgear Settings with Motor/Equipment Data sheets/ and Performance curves.
Witness the Pre-commissioning and Commissioning tests (IR, Winding continuity and Solo/ Load tests) in the motors and verify the test reports.
Find out field engineering Modifications, prepare Design notes and critical modifications get approval from the client engineering through TQ,
Perform the Walk through with client Engineers and Generation of punch list after inspection and Clearing the punch points.
Preparing final documentation
Major Roles & Responsibilities
LOA holder for the KahraMaa substation and cable works.
Electrical Engineer responsible for leading Installation, commissioning, Start-up and handing over the project in complete customer satisfaction.
Prepare Method of statements, Tie- in procedures, and interface agreement & Procedures
Follow up Mobilization vendor and Subcontractor as per the site requirements carry out the site surveys and arrange the vendor meetings.
Equipment/ Material selection and Preparation of the LPO and follow up.
Co-ordinate for the FRA and make solutions and procedures based on the summary
Coordinate and manage the SIMOPS and Tie-In activities in the existing plant area facilities.
Coordinate the Lock out tag-out and Permit system with the concerned Authorities.
Conduct the site surveillances and verify the drawings and site developments matching, if require suggest necessary modifications in the drawing and follow up with engineering contractor.
Verify the supplied material against specification and offer for inspection and conduct pre installation testing if necessary, and Verify Factory reports and delivered condition of the material or equipment.
Follow up with vendors activities and coordinate between vendors and other disciplines.
Verify the P&ID and Hook-Up drawings for the Equipment location and method of installation.
Coordinate for the Substation/ Plant testing & commissioning and ensure all functions are verified as per approved check sheets.
Verify the Calibration certificates and validity for the testing / Measuring Equipments prior the commencement of the test.
Witness and verify the testing commissioning in the Electrical Control panels, and Switch Gears, Verify Testing & commissioning Reports.
Verify the control Panel and Switchgear Settings with Motor/Equipment Data sheets/ and Performance curves.
Witness the Pre-commissioning and Commissioning tests (IR, Winding continuity and Solo/ Load tests) in the motors and verify the test reports.
Find out field engineering Modifications, prepare Design notes and critical modifications get approval from the client engineering through TQ,
Perform the Walk through with client Engineers and Generation of punch list and Clearing the punch points.
Preparing final documentation.
Major Roles & Responsibilities
Reporting to E&I Construction Manager.
Understand the scope of work and Distribute the scope to concerned supervisor and foreman
Grounding system installation and testing (Earth pit Testing and Grid Testing)
Installation of cable trays, cables in cable trench and trays.
Testing and pre-commissioning of cables.
Electrical installation of Electrical motor.
Testing of the motor and solo run test.
Installation of the Lighting panel and Lighting DBs
Major Roles & Responsibilities
Check and verify electrical SLDs, load list, cable schedule, Earthing and lightning layout, substation and equipment layouts, specifications and data sheets.
Prepare the material requests and arrange the substation equipment &Tower materials for the project from the central store, Verify the Contractor supplied materials.
Conduct the line survey for the route.
Lead up the construction activities and prepare the daily reports
Lead the Installation and commissioning activities in the Switching Yard and gantry, Grounding system, CT, VTs, 110kV SF6 Circuit Breakers, Isolators for 110kV incomers side, 11kV VCBs, switch gear, and assembly of the Power transformer in the Plinth.
Coordinate and establish the installation and commissioning activities in the live substation and coordinate with the substation authorities. Lead the installation and testing of Substation lighting and Switch yard lighting.
Date of Birth: 24 MAY 1982
Permanent Address: THATTIL HOUSE, KARANCHIRA, THRISSUR, KERALA, INDIA. 680702
Passport Details No: Z3833154, Issued at: Doha, Validity: 16/10/2017 to 15/10/2027
QID
Driving license: -Qatar license (Car) Valid till 2024-03-18, Indian license Valid till 2026-12-10
Civil Status: Married Nationality: Indian Gender: Male
Language(s)
English, Hindi, Tamil, Malayalam
Self-assessment
Understanding
Speaking
Writing
European level Listening
Reading
Spoken interaction
Spoken production
English
C2
Proficient user
C2
Proficient user
C2
Proficient user
B1
Independent user
C1
Proficient user
Hindi
B1
Independent user
B2
Independent user
B1
Independent user
B1
Independent user
A1
Basic user
Tamil
B1
Independent user
A2
Nil
B1
Independent user
B2
Independent user
A2
Nil
Malayalam
C1
Proficient user
C1
Proficient user
C1
Proficient user
C1
Proficient user
C1
Proficient user Common European Framework of Reference for Languages
Organiazational Skills and Technical Competencies
Education
Trainings, Certifications and Computer Skills
Major Projects
Key Roles& Responsibilities
Equipement and devices
Major Activities
Professional Experience Summary
Sr. Electrical Design & Supervision Engineer
M/s Diwan Al Emara- Architects, Engineers & Planners, Doha Qatar
QAF-Al Shamal factory/ Airport project 196/198/202
Hilton Double Tree Sinyar Tower
QAAK (Qatar Academy Al-Khor) Qatar Foundation
Dec2015-Pressent
Sr. Electrical Engineer EPC
M/s Qatar Engineering & Construction co. Doha Qatar
Waste water Treatment Plant (WWTP)-Qatar- Qatar Gas
Diesel Hydro Treater-Laffan Refinery-Qatar Gas
Jun 2013- Dec15
Sr. Electrical Engineer EPC
M/s Hyundai Engineering Constructions co. Doha Qatar
Qatar Fertilizers Co.-Qafco Mesaied Doha Qatar
KahraMaa Substation Projects Phase 8
Jun 2009- Sep12
Electrical Engineer (Installation & Commissioning)
M/s Acontec Engineering WLL (M/s Consilium Qatar WLL.) Doha Qatar
18”MPPL project Doha Qatar- Qatar Petroleum,
Mar2009- Jun09
Electrical Engineer (Installation & Commissioning) KSEB (Kerala State Electricity Board)
IRINJALAKUDA Subdivision, Trissur Transmission Circle, Kerala, India.
Construction of 110kV substation Kandassankadavu &110kV multi circuit Line
Mar2006- Mar09
Personal Details