Post Job Free

Resume

Sign in

Sap Consultant

Location:
Chennai, Tamil Nadu, India
Posted:
June 06, 2021

Contact this candidate

Resume:

Saravanan Sivakumaran Date **.**.****

Permanent Address: Chennai -15

Old No 28, New No 26 Potters Street,

Saidapet, Chennai, Tamil Nadu,

India 600015,

+91-950*******

E-mail : admyuu@r.postjobfree.com

Professional Summary

Certified PP Consultant with 14 years in SAP Functional Experience in SAP and 12 years in experience in Manufacturing.

Worked on four SAP Full-Life cycle implementation projects, Production support, two Rollout and Enhancement projects in India and Overseas.

Worked in Variant configuration project.(Rockwell Automation project and AMIANTIT project.

Worked in integration between SAP and third party software. (Mobile apps and MES)

Worked in Solution Manager Charm & Soldoc.(FIAT TATA motors project).

HP ticketing tool. Worked in testing tool.(E-catt)

Worked in IDOC testing and handing issues.(Ericsson project)

Involved in different phases of life cycle implementation using ASAP methodology.

Proficient in AS-IS study, Fit-GAP analysis via SDLC. (AMIANTIT Mobile apps solution project)

End-user training.

Worked in MM/ WM / EWM Support Project.

Excellent analytical, time management, problem solving and presentation skills.

Professional Experience

Saudi Arabian Amiantit Co – Saudi (May 2014 – Till Now)

Saudi Arabian Amiantit Co. is a top Pipe Manufacturing Company in Middle East and a major Global Level pipe producer, which specializes in manufacturing/marketing of various pipes such as FRP, Ductile Iron Pipes, and Concrete Pipes.

Project: Barcode Process implementation in Pipe products.

Implementation of the barcode process in the pipe product. This is used for tracking the pipe while doing the transfer posting and Physical Inventory process.

Involved in preparing the business blue print with the business and supplier. Involved in Integration Testing with SAP and Barcode Reader, UAT and post go love support.

Solved the issue via SDLC (Study the requirement, Defining the requirement, Design the requirement,configuring the requirement, testing the product and Deployment)

Project: Document Management system

Implementation of the DMS process to store the ISO documents.

Involved in preparing the business blue print with the business. Involved in testing, UAT and post go love support.

Project: SADIP PP Roll Out

Involved in Preparing the Rollout documents, configuration and Testing. Involved in user acceptance Test and End user Training.

Project: MRP Run at Pipe Products Project.

Involved in preparing the documents for MRP run with coverage profile. Tested the process and Training.

Project: First expiry First Out concept implementation

Implemented the FEFO Concept implementation for chemical Raw material by using the Batch/SLED functionality.

Project: Raw Material Replenishment process at shop Floor.

Implemented the KANBAN Process at SADIP Plant.

IBM India Pvt. Ltd. (April 2008 – May 2014)

Project: SAP Application Maintenance System.

Client - Ericsson

Worked in AO team responsible for solving the incidents raised by the customers all over the world. Mainly working in PP, MM, WM and EWM related tickets. My role also included working on Severity 1 or Severity 2 tickets, which needs to be resolved within 3 hrs. and 6 hrs. respectively from the time it is raised by the customer.

Activity also includes performing the functional testing for the PP/MM / EWM related changes done by the technical team before moving it to production.

Project: SAP Roll Out

Client - Ericsson

My role is as SAP PP / MM / WM consultant responsible for preparing the rollout documents, do the configuration and testing. After UAT providing the Knowledge Transfer to the Application Development team and maintaining the same.

Validation of the Demands (Change release) involves testing with other modules MM and raising the defects if anything is found. Once the changes are found ok, it is approved to move to production and we do the maintenance.

Mainly involved in PP / MM involved in new process designed for the material movement in warehouse managed storage locations. Worked in solution manager charm for moving the changes.

Project: SAP Variant configuration Implementation.

Client - Rockwell

My role is as SAP PP consultant responsible for checking the requirement with customer and creating the VC model and testing in quality system. Based on the requirement I have to create the VC models for BTO and CTO by using suitable object dependencencies and variant tables. Checking the object dependencies using the Quality tool and sign off.

Tata Technologies Pune (March 2007 – April 2008)

Project: SAP PP Implementation – FIAT Auto I Ltd

A leading Automobile Industry for which Export of its automobiles, spare parts and overseas production equipment’s were managed by this system.

My role is as SAP PP Consultant responsible for the Production Planning Implementation. The Role involves TO-Be Document creation, Business flow creation, requirement gathering, defining the PP Organization units and customization. Also involved in FIT & GAP analysis, identifying ADD-ON programs, creating Basic designs and integration testing. Worked in the Integration Testing phase and also providing support for Data migration.

Worked in IDOC and integration with other third party software for the BOM and planning & Scheduling process.

Worked in Production and planned order process.

Project: SAP Up gradation – Tata Motors Ltd.

My role is as SAP PP Consultant responsible for testing the business process after up gradation in quality system. The Role involves testing the PP cycle, Integration testing with other modules and Interface testing. Identifying the new functionalities and implementing the same.

Worked in solution manager charm and testing the process thro E-catt.

Precimax Tech P Ltd (Nov 2003 –Sep 2006)

Lean Manufacturing Facilitator

Worked as Lean facilitator. Responsible to propose the new process to improve the productivity.

Role involves preparing the value stream mapping, identifying the waste in the process and propose the new process.

I have implemented the single piece flow concept and 5’s principles in the shop floor.

Flowserve Sanmar Ltd. (Apr 1998 – Oct 2003)

Senior Engineer Production

Roles and Responsibilities:

Worked as Senior Engineer production, responsible for the shop floor production, CNC programming, Trouble shooting of day-to-day manufacturing/quality issue.

Worked as a Core Team member during SAP implementation. My role is as preparing AS-IS documents, Master data creation, testing and end user training

Dezurik I Ltd, India (Aug 1994 – March 1998)

Worked as Engineer production, responsible for the shop floor production, CNC programming, Trouble shooting of day-to-day manufacturing/quality issue.

Education:

Anna University. India

July1990- June 1994 B.E. in Mechanical Engineering

Computer Programs: Windows 98 and 2000, Office 97 (Excel, Word, Access, Outlook),

SAP Functional Modules:

SAP Certified PP Consultant

Working experience in QM, MM, WM. EWM modules



Contact this candidate