HSE/PTW/LOTO SPECIALIST
Unrestricted
Page: *
CURRICULUM VITAE
Name : Moustafa Abouelyazid Abdelfattah Elebshihy
Address : Damanhur, Beheira, Egypt.
Date of Birth : 24th Jan 1978
Nationality : Egyptian
Language Spoken : English & Arabic
& Written
Marital status : Married
Telephone Number : +233*********, +233*********,&+204******** E-mail :*****************@*****.***&*************@*****.*** EDUCATION
Qualifications : B.Sc. of Mechanical Production Engineering, Alexandria University. Year of Graduation : June 2000
Project Degree : Excellent
SKILLS AND KNOWLEDGE
Computer Knowledge : Microsoft Words, Excel, Access, Power Point & AutoCAD. Power Plant : PTW/LOTO, O & M for Thermal, Combined and Simple cycle Power Plants. HSE Knowledge : OSHA, IOSH – HAZOP/HAZID.
Certifications : OSHA, Confined Space Safety Assessor (CSSA)& CIDB
: Firefighting Truck, Aerial Platform ALP 295E on IVECO.
: Firefighting Foam Trailer, Rabid Intervention Vehicle on GMC. Additional Training
IOSH Managing Safely
OSHA Construction and Industry site training-Almorgan-Saudi Arabia CIDB-General Construction Work, Confined Space Safety Assessor (CSSA). ISO 45001:2018 Occupational Health & Safety Management System Awareness ISO 14001:2015 Environmental Management System Awareness ISO 50001:2018 Energy Management System Awareness
ISO 9001:2015 Quality Management System Foundations Process Safety_ Managing Highly Hazardous Chemicals Internal Audit Awareness
Managing Health and Safety in Healthcare Legislation and Risk Assessment Accident Reporting Awareness
Anhydrous Ammonia Safety
Aerial Lift Safety
Asbestos Awareness
ATEX - Explosion Hazard Awareness
COSHH and Working in Confined Spaces
Cranes, Lifting and Equipment Laydown
Developing a Risk Assessment
EHS Acknowledgement for Office-based workers
Electrical Safety basic training
Protect acute-respiratory infection
Hydrogen Sulfide Awareness
Incident management system
Standard precautions-Waste management
Rigging, Movement, and Delivery Safety Awareness
Positive Intervention and Situational Awareness
Radiation Safety for GEAVI-Additive US Services Operations HSE/PTW/LOTO SPECIALIST
Unrestricted
Page: 2
SDS Awareness
SF6 Emission Impact Awareness
Slip Trips and Falls Awareness
The COSHH Manager Certification
The COSHH Risk Assessor Certification
Workplace Fire Safety
Workplace safety- Deciphering NFPA Codes
Workplace safety- Emergency Action Plan
Workplace safety- First Aid
Workplace safety- Forklift Safety
Workplace safety- Hand and Power Tools
Workplace safety- Air Contaminant and Dust
Workplace safety- Arc Flash
Workplace safety- Back Safety
Workplace safety- Cold Stress Hazards
Workplace safety- Crane Safety
Workplace safety- Dampness and Mold Hazard
Workplace safety- Electrical Safety PPE
Workplace safety- Radioactive Material Safety
Workplace safety-Fall Protection
Workplace Safety-LOTO-Lock Out Tag Out
Welding Processes, Pipeline Leak Detection, Power Transmission Equipment& Bearing Basic. Machine Condition Advisor, Workshop for Supervisors and Inspectors& Welding Health and Safety. Basic Inspection Methods of Welding, Incident-management-system Standard Precautions-Waste management, Positive Intervention and Situational Awareness Fuel Oil Treatment Plant Maintenance and operation. 7FA Combustion Inspection
Gas Turbine Fundamentals HA Technology
Familiarization LM2500 GT
Familiarization LM6000 GT
Familiarization LM2500
LMS100 Training
Combined Cycle start up and operation
Generator Brush Inspection & Maintenance
Troubleshooting liquid fuel system problems
GT Fire Protection system& Ventilation system
Lean Blowout
Ultrasound Product Identification and Traceability Rotor Installation
Agile DHF Tool User Training
Experience Summary
I am a Mechanical engineer with more than 20 years’ experience of HSE/PTW/LOTO, Planning, Maintenance, Operation and Commissioning within Power Plants, Utilities& Refinery sector for large multinational Companies
Focus:
Health Safety& Environment Permit to work and Lock Out Tag Out (PTW/LOTO) Management Construction, Commissioning, Operation, Maintenance Steam and Gas Turbines& Substation Boiler, HRSG, BOP Simple, Combined &Thermal Cycles Power Plants WWT, ECP, RO Plants EMPLOYMENT HISTORY
Company : GE (Ghana)
Designation : PTW/LOTO Manager.
Department : HSE& Commissioning
Project Title : Amandi CCPP (202 MW).
Duration : December 2018 until now.
HSE/PTW/LOTO SPECIALIST
Unrestricted
Page: 3
Duties and
Responsibilities : Provide advice and support to the Construction& Commissioning teams on the process and procedures to be put in place to control the PTW system at site, Design Lockout points, Participate in Mechanical/Electrical isolation and de- isolation of all plant equipment, Designated as a Key holder for all working area on-site, Ensure full compliance with ALL associated Safe Work permits standards, Oversee the Issue permits for construction / commissioning activities, Carry out PTW audits on the permits issued, Coordinate training requirements for Permit Issuers and Receivers, Send out notifications for pressure testing and radiography, Ensure a log of all 'live' permits is maintained, Undertake regular HSE tours to ensure familiarity with the ongoing work activities at site, Ensure all permits are plotted on a site layout to minimize concurrent / SIMOPS work activities," Ensure ALL Confined Spaces are clearly marked on plot plans maintained in the permit office, Maintain a register of all RAMS documents, Maintain custody of lock boxes inside the permit office, ensuring necessary approvals are obtained to release keys, and follow up to ensure all keys are returned that shift, Maintain a "live" register of all isolations
(permit and non-permit) on site, when they are applied and removed. Issue LOTO equipment and apply permit LOTO where necessary, Issue and record the issue of personal locks to permit receivers, Review PTW's, method statements and risk assessments, Ensure work requests are submitted 24 hours in advance with all supporting documentation (RAMS, P&ID/SLD mark-up, etc.), Review Work Requests submitted for work planned for the following day and review for SIMOPs clashes. Work with the Construction and Commissioning teams to Identify priority work, “Issue "SIMOPs Notifications", notifying of authorized and non-authorized work, “Ensure up-to-date lists in the permit office of trained personnel for permit issuers, receivers, LOTO authorized, confined space entrants are maintained, Update plot plans in the permit office showing the location of commissioning areas, Ensure that the site confined space and personal atmospheric monitors are signed out and in when required for different permits, Able to perform atmospheric testing. Establishing and implementing PTW/LOTO program, Training site personnel in the rules and regulations contained within these procedures, Conduction periodic inspections of the PTW/LOTO log,Ensuring compliance with PTW/LOTO rules and regulations and reporting to the site Manager, PTW/LOTO Coordinator Guidance for preparation of PTW/LOTO Forms/Protocols and various status reports, Cooperate with Construction and Commissioning team, Identify and notifying all High-risk areas covered by this procedure, Notifying The Site Manager for any PTW/LOTO violations, Will order stoppage of any work performed in unsafe manner, Fully understanding the work to be done and authorization of protection required to make the system/equipment safe to work on, TOP Activities, Assist site safety management& FOTP O&M. Company : SIEMENS (Malaysia) SDN BHD
Designation : HSE/PTW/LOTO Officer& Day Shift Charge. Department : HSE& Commissioning
Project Title : PCP Cogen. Power Plant/Rapid Refinery (1220 MW &1480 T/H with complex). Duration : September 2017 –November 2018
Duties and
Responsibilities : Setting up of the PTW site office and PTW/LOTO system, monitoring of contractors for compliance with the Permit to Work procedure. Ensuring compliance with regulations pertaining to safety, Environmental and Health regulations within the scope of my responsibility. Ensuring PTW Certificates are authorized by each section manager before final Authorization of work commencing. Keeping and controlling lists of Authorized Applicant and senior Authorized Person. Assistance with planning and organizing of work schedules and co-ordination of activities. Ensuring interface activities do not adversely impact operational requirements or schedule Program of work. Inspection of HSE/PTW/LOTO SPECIALIST
Unrestricted
Page: 4
sub-contractor risk assessment and generic/specific method of statements, to ensure a safe system to work.
Ensure Commissioning staff carrying out the authorized activities understand and are fully conversant with method of statements and that any risks associated with activities are where possible illuminated and reduced. Detail control requirements, e.g. Lockout tag out procedures and notification to relevant department are conducted, recorded, and effectively agreed before commissioning work commences. Carry out onsite inspection to ensure compliance with authorized method of working. Reporting any breaches of authorized PTW’s to Safety Manager. Design Lockout points, Participate in Mechanical/Electrical isolation, and de-isolation of all plant equipment. Designated as a Key holder for all working area on-site. Operation of Siemens Turbines/HRSG equipment and axillaries.
Company : SAMSUNG C&T (Saudi Arabia)
Designation : HSE/LOTO/PTW Lead Engineer.
Department : HSE & Commissioning
Project Title : R2IPP Combined Cycle Power Plant (2060 MW SIEMENS Machines). Duration : November 2015 – August 2017
Duties and
Responsibilities : Setting up of the PTW site office and PTW/LOTO system, Provide advice and support to the Construction& Commissioning teams on the process and procedures to be put in place to control the PTW system at site, Design Lockout points, Participate in Mechanical/Electrical isolation and de-isolation of all plant equipment, Designated as a Key holder for all working area on-site, Ensure full compliance with ALL associated Safe Work permits standards, Oversee the Issue permits for construction / commissioning activities, Carry out PTW audits on the permits issued, Coordinate training requirements for Permit Issuers and Receivers, Send out notifications for pressure testing and radiography, Ensure a log of all 'live' permits is maintained, Undertake regular HSE tours to ensure familiarity with the ongoing work activities at site, Ensure all permits are plotted on a site layout to minimize concurrent / SIMOPS work activities," Ensure ALL Confined Spaces are clearly marked on plot plans maintained in the permit office, Maintain a register of all RAMS documents, Maintain custody of lock boxes inside the permit office, ensuring necessary approvals are obtained to release keys, and follow up to ensure all keys are returned that shift, Maintain a "live" register of all isolations (permit and non-permit) on site, when they are applied and removed. Issue LOTO equipment and apply permit LOTO where necessary, Issue and record the issue of personal locks to permit receivers, Review PTW's, method statements and risk assessments, Ensure work requests are submitted 24 hours in advance with all supporting documentation (RAMS, P&ID/SLD mark-up, etc.), Review Work Requests submitted for work planned for the following day and review for SIMOPs clashes. Work with the Construction and Commissioning teams to Identify priority work, “Issue
"SIMOPs Notifications", notifying of authorized and non-authorized work,
“Ensure up-to-date lists in the permit office of trained personnel for permit issuers, receivers, LOTO authorized, confined space entrants are maintained, Update plot plans in the permit office showing the location of commissioning areas, Ensure that the site confined space and personal atmospheric monitors are signed out and in when required for different permits, Able to perform atmospheric testing.
Company : GE (Egypt)
Designation : LOTO/PTWO Lead & Day Shift Charge.
Department : HSE & Commissioning
Project Title : West Damietta Simple Cycle Power Plant (500 MW Fast Track Project- 9FE M/C).
HSE/PTW/LOTO SPECIALIST
Unrestricted
Page: 5
Duration : April 2015 - October 2015
Duties and
Responsibilities :Setting up of the PTW site office and PTW/LOTO system, Undertake the daily running of Permit to work office in conjunction with Commissioning and allocation of work schedules. Design Lockout points Participate of isolation and de-isolation of all plant equipment’s. Verify documentation to ensure the isolation is correctly applied and all hazards were eliminated. PTW/LOTO Training for all authorized employee. Monitoring of contractors for compliance with the Permit to Work procedure. Operation of GE Turbines and its auxiliaries. Designated as a key holder for all the working areas on site. Report to site Commissioning Manager.
Company : SAMSUNG C&T (Saudi Arabia)
Designation : LOTO/PTW Lead Engineer.
Department : HSE & Commissioning
Project Title : QIPP Combined Cycle Power Plant (4000 MW SIEMENS Machines). Duration : June 2013 - March 2015
Duties and
Responsibilities : Setting up of the PTW site office and PTW/LOTO system, Undertake the daily running of Permit to work office in conjunction with Commissioning and allocation of work schedules. Verify documentation to ensure the isolation is correctly applied and all hazards were eliminated. Design Lockout points Participate of isolation and de-isolation of all plant equipment. PTW/LOTO Training for all authorized employee. Monitoring of contractors for compliance with the Permit to Work procedure. Report to site Commissioning Manager Company : ANSALDO CALDAIE (Egypt)
Designation : Commissioning, PTW/LOTO Lead Engineer & Shift Charge Department : Commissioning
Project Title : Abu Qir Thermal Power Plant (1300 MW). Duration : September 2012 – May 2013
Duties and
Responsibilities : Commissioning & Operation of 2 Boilers (2*2100 ton/hr.) and auxiliary system, Chemical cleaning, Steam blow. Act as PTW/ LOTO Senior Authorized Person.
Company : ANSALDO ENERGIA (Egypt)
Designation : LOTO/PTW Lead Engineer.
Department : EHS & Commissioning
Project Title : 6th October Simple Cycle Power Plant (600 MW Fast Track Project). Duration : December 2011 – August 2012
Duties and
Responsibilities : Manage PTW/LOTO System. Design Lockout points and perform all required isolation and de-isolation. Designated as a key holder for all the working areas on site. Report to site Commissioning Manager
Company : Egyptian Ministry of Electricity (Egypt) Designation : Mechanical Maintenance Engineer
Department : Maintenance
Project Title : Damanhur Thermal Power Plant
Duration : Jan 2011 – November 2011
Duties and
Responsibilities : Mechanical
HSE/PTW/LOTO SPECIALIST
Unrestricted
Page: 6
Company : PGESCO (Egypt)
Designation : Commissioning, PTWO/LOTO Engineer & Shift Charge Engineer. Department : Commissioning
Project Title : Altaf Combined Cycle Power Plant (750 MW MITSUBISHI & ANSALDO M/C). Duration : May 2009 – December 2010
Duties and
Responsibilities :Commissioning & Operation of Combined Cycle, Including Chemical cleaning, Steam blow. Act as PTW/ LOTO Senior Authorized Person. Design Lockout points and perform all required isolation and de-isolation. Company : Kuwait Ministry of Electricity & Water (Kuwait) Designation : Commissioning, PTW/LOTO Engineer & Shift Charge Department : Commissioning
Project Title : Shuaiba North Combined Cycle Power Plant (1000 MW GE -9FA & Toshiba M/C).
Duration : February 2008 – April 2009
Duties and
Responsibilities : Commissioning & Operation of Combined Cycle, Including Chemical cleaning, Steam blow. Act as PTW/ LOTO Senior Authorized Person. Design Lockout points and perform all required isolation and de-isolation. Company : Egyptian Ministry of Electricity (Egypt) Designation : PTWO/LOTO & Shift Charge Engineer.
Department : Operation
Project Title : Damanhur Thermal Power Plant (325 MW) Duration : August 2000 – January 2008
Duties and
Responsibilities : Operation of Thermal Cycle, Continued safe and efficient operation Act as PTW/ LOTO Senior Authorized Person. Design Lockout points and perform all required isolation and de-isolation.
PERSONAL ACHIEVEMENTS
26 Million Man-Hours without LTI.
Honor date : August 2017
Honor Issuer : SAMSUNG C&T
Description : Excellence Performance during R2IPP 2060 MW Project as PTWO/LOTO SAP 20 Million Man-Hours without LTI.
Honor date : January 2015
Honor Issuer : SAMSUNG C&T
Description : Excellence Performance during QIPP 4000 MW Project as PTWO/LOTO SAP HSE/PTW/LOTO SPECIALIST
Unrestricted
Page: 7
References
Name : Samir RAHMANI
Job Title : Site EHS Manager Site EHS Manager
Company : GE
Email : *******.*****@**.***
Telephone Number : +233-***-**-**-**
Name : Samuel Ballenghien
Job Title : Site Commissioning Manger
Company : GE
Email : ******.***********@**.***
Telephone Number : +33 6 13 99 08 68
Name : Robert Taylor
Job Title : Site Commissioning Manager
Company : Worley Parsons
Email : *************@*******.***
Telephone Number : +447*********
Name : Richard Done
Job Title : Consortium EHS Manager
Company : SIEMENS
Email : ************@*******.***
Telephone Number : +1-321-***-****& +601*-***-****.
Name : Nicol Roy
Job Title : Commissioning Manager
Company : SAMSUNG C&T
Email : *****.***@*******.***
Telephone Number : +447*********
Name : Tarek Al-Nachar
Job Title : HSE Manager
Company : ACWA POWER
Email : *******@*********.***
Telephone Number : +966********
Name : Sean Baek
Job Title : HSE Manager
Company : SAMSUNG C&T
Email : ******.****@*******.***
Telephone Number : +827*********
Name : Magdy Hussien
Job Title : Operation Lead
Company : Worley Parsons
Email : *****.*******@*************.***
Telephone Number : +966*********&+201*********
Name : Gomma Shehata
Job Title : Commissioning Manager
Company : GE
Email : *****.*******@**.***
Telephone Number : +201*********
Name : Fikret Gulen
Job Title : Site Manager
Company : GE
HSE/PTW/LOTO SPECIALIST
Unrestricted
Page: 8
Email : *******@*****.**
Telephone Number : +336********
Name : Ashraf Abd Elmegid
Job Title : HSE Manager
Company : GE
Email : **************@*****.***
Telephone Number : +201*********
Name : Talaat Awyda
Job Title : Electrical Commissioning Manager
Company : Shanahan Engineering
Email : ***********@*****.***
Telephone Number : +201*********
https://www.linkedin.com/in/moustafa-elebshihy-9a1a3940/