FAHIM RESUME
ABOUT ME
EDUCATION
TRAININGS
EXPERIENCE
SKILLS
AGENDA
ABDUL FAHIM KHAN
ABDUL FAHIM KHAN
My name is Abdul Fahim Khan
Married, DATE of Birth 01 Feb 1978
Family status with two kids
Nationality: Pakistan
Iqama : Transferable
I have start my career since 2000 in different Process fields in Pakistan as Installation, Maintenance and Execution Engineer (computerized, electrical and Mechanical Systems in different fields even we Erected the Machine Complete Electrical Side and the machine got from Italy Eight color graviour Machine Paper printing).
In Mid of May 2007 I have join ABB Automation till today (Riyadh, Industrial Area 2) as Design, QC and Installation, Maintenance Engineer of RTU equipment.
ABOUT ME
admtv0@r.postjobfree.com
As I have mostly experience in Maintenance so, I want to join your well reputed company to lead the maintenance dept.
VALUES:
I can’t say good things related to me but I will mention that, I would like to work with honesty, loyal, and bring new ideas to improve dept. progress.
keep maintenance healthy with records to get production without disturbance.
OBJECTIVES:
ABDUL FAHIM KHAN
My education diploma of three years in Electrical field Govt. College of Technology and Engineering Pakistan 1997 – 2000:
I have done diploma in first Division
New Method Govt. Boys Technical school. 1992 – 1994: Grade A. Trade Electrical.
EDUCATION
SKILLS
ABDUL FAHIM KHAN
1. Installation commissioning Troubleshooting Maintenance Erection of different machines.
2. Understand Electrical control diagram and modify as per our requirement and changes. Moreover can under stand the drawings of LV side.
3. Understand the PLC (programmable logic control). 4. Can design electrical control panels.
5. Have knowledge about instrumentation including installation and Maintenance.
6. P&I Diagram can understand.
These are the Industries where I have worked as Installation Maintenance and Troubleshooting.
1. Paper Printing 8 color. Pakistan
2. Textile Printing. Pakistan
3. Cylinder Making for paper complete installation and Maintenance Contract. Pakistan
4. Pepsi company. Pakistan
5. Super Crisp chips. Pakistan
6. GASCO Oil and Gas Pakistan.
7. Chip Board Plant PakiTex Pakistan.
8. leather shaving machine Pakistan.
Assist. Electrical Incharge, Applied
Computer Technology
Sep 2000- May 2003
Worked at PLC s Programming, Installation, Commissioning and Trouble- shooting in different type of industries as Sub-contractor, some important projects are as under.
1. Super crisp (Potato chips) trouble shooting full automatic. 2. Pepsi company to take backup of PLC Program.
3. Complete Installation Experience of Eight color Paper Printing and Lamination Machine including MV, LV and Control panels. 4. Automated the process of Air Handling Unit with the PLC
(Programming and down-loading) including HMI Interfacing with the PLC in Popular Fabrics Company ltd.
5. Complete Installation, Commissioning of PLC for RO Plant. 6. Automated the process of Air Handling Unit with the PLC including HMI Interfacing with PLC in Popular Fabrics Company l ltd.
MY EXPERIENCE
ABDUL FAHIM KHAN
Assist. Electrical Incharge, NADIA
TEXTILE PVT. LTD. (PAKISTAN).
Karachi, May 2003- July 2004
Maintenance and troubleshooting of Textile Printing Machines, Worked at Oil and steam Boilers, Inverters.
Updated the relay control of boiler’ with PLC of Siemens (Logo-Soft). Completely supervised the erection of (Rotary) Printing Machine. Maintain the log book for Maintenance which help us to record all problems with solutions.
MY EXPERIENCE
ABDUL FAHIM KHAN
Assist. Electrical Incharge,
PAKITEX BOARD PVT. LTD.
PAKISTAN
July 2004- Feb 2005
Design of Electrical panels of Shaker, Weighing Analyzer, Hydraulic Presser(Pressure 120bar), Heating Chamber and Cutting Section. Converted the relay logic panel into PLC (Programmable Logic Control) for Steam Boiler.
Worked on relay logic diagram, supervised the Installation, Troubleshooting and Maintenance of the process..
MY EXPERIENCE
ABDUL FAHIM KHAN
Assist. Engineer II GASCO
ENGINEERING PVT. LTD.
PAKISTAN (A Subsidiary of ENI
Pakistan).
Jan 2005- May 2007
Worked in Gas field (Exploration of Natural Gas) in Operation &Maintenance division.
Worked on Operation & Maintenance of Well-Head Compressor’s control panels Type: Superior RAM 54).
Worked on Operation & Maintenance of Compressors’ drivers (Type CAT, 1100 HP).
Worked on P& I diagram for the complete gas exploration process for Wellhead Compressor.
Update maintenance & operation of various instruments (Actuators, Pressure transmitters, Temperature Sensors, and Level Switches etc.). Supervision and Maintenance of Electrical control panels. MY EXPERIENCE
ABDUL FAHIM KHAN
Commissioning (ABB
AUTOMATION CO), RIYADH,
KINGDOM OF SAUDIARABIA.
Industrial Area 2
Jun 2007- May 2019
1. Lead the team to Complete the SCADA RTU wiring
2. SCADA RTU configuration of all regions.
3. Testing of SACDA RTU from field according to the signal list including testing of Protocol Address by Protocol Analyzer.
4. Trouble shooting of SCADA RTU.
5. Worked on almost all families of ABB SCADA RTU Release and hardware. 6. SITE Survey of different stations and Plants to convince the customer and give best solutions.
7. Attended the meeting with Main Client in term of providing solutions and engineering point of view.
8. Integrate new RTU hardware in existing system and Engineering. 9. Maintenance of HVAC system.
10. Experience of Fire fighting system.
MY EXPERIENCE
ABDUL FAHIM KHAN
MAINTENANCE IN-CHARGE.
JDCO AL- JAZERA
DEVELOPMENT COMPANY
Nov 2019 – Till Continue
1. Responsible Mechanical related issues.
2. Responsible Electrical related issues.
3. Schedule Preventive Maintenance of Machines
4. Daily scheduling of Assigned work to Technicians 5. Inventory control related spare parts.
6. Coordinate with Vendors to get the solve of Machines as per warranty. 7. Upgradation of old machines.
8. All work doing as normally required in this position. MY EXPERIENCE
ABDUL FAHIM KHAN
TRAININGS
Successful completion of RTU training to train the trainer in ABB FOR RTU.
Attended several courses related to Integrity issues. Attended several safety Induction courses in ABB.
Certificate course done regarding Time Management. Successful completion of PLC programming certificate course from ACT.
:
ABDUL FAHIM KHAN