Post Job Free

Resume

Sign in

Energy Power Deputy Manager

Location:
Chennai, Tamil Nadu, India
Posted:
May 30, 2021

Contact this candidate

Resume:

NAME: B.BASKARAN

NATIONALITY:

INDIAN

POSITION

:MEP Co-Ordinator

: 950*******

DATE OF BIRTH:

29nd JULY 1986

YEARS OF EXPERIENCE:

** *****

Seeking Manager level assignments Project Management for MEP / Site Execution with a reputed organization

EDUCATION

Bachelor of Engineering (Mechanical & Manufacturing) from Annamalai University in 2004 - 2008

ADDITIONAL TRAINING

Project Management course in 2015 at INTERNATIONAL INSTITUTE OF PROJECT MANAGEMENT - Chennai

PROFESSIONAL AFFILIATIONS

Descriptif en light ou en gras

SOFTWARE

AUTO-CAD, MS Office, MS Project

KEY QUALIFICATIONS

Years of professional experience:12.5 Years

12.5 years’ Experience in project co-ordination MEP Design and site execution for Electrical, HVAC, Plumbing, Fire Systems, Elevator and escalator. preparation of engineering drawings, cost estimate and contract documents

Estimation of Quantities for various Tenders

LANGUAGES

READ

SPOKEN

WRITTEN

English

Good

Good

Good

Hindi

No

Good

No

Tamil

Excellent

Excellent

Excellent

Telugu

No

Good

NO

For each language indicate proficiency: Excellent, Good, Fair & Poor

CORE COMPETENCIES

Resource planning

Project Execution

Procurement Management

Project Co-ordination

Cost Controlling

Quantity survey

PROFESSIONAL EXPERIENCE

FEB 2019 to SEP 2020

SYSTRA MVA Consulting India Pvt. Ltd.

Position: MEP Co-Ordinator

CLIENT : BANGALORE METRO RAIL CORPORATION LTD

Project : Bangalore Metro Rail Corporation Ltd (viaduct and station for section-5 (RV Road to Bommasandra Elevated station - Package -1,2,3 Bangalore

Main Project: Bangalore Metro Rail Corporation Limited

Responsibility:

MEP Design Co-ordination, MEP drawing checking, co-ordination with Architecture and structural team. Co-ordination with client and fullfill the client requirement.

Preparetion of Design Basis Report, Technical specification and getting aproval from client.

Preparation of bill of quantity.

Preparation and Submission for the tender document and attending the bid opening meeting.

Checking the drawing and submite to client and get the approval.

Attend the interface meeting with client and system contractor.

April 2017-Feb 2019

IL&FS ENGINEERING CONSTRUCTION COMPANY LTD

Position: Deputy Manager - MEP

Project: CHENNAI METRO RAIL LIMITED

Location: CHENNAI

Client: Chennai Metro Rail Limited (CMRL)

Position Held: Deputy Manager

Main Project : Chennai Metro Rail Project Phase -1 Extension 2No’s Under ground station and 1 cut and cover ramp 856m.

Responsibility: MEP Project management, Execution, MEP Design Co-ordination, MEP drawing preparation, Estimation, client billing, Quantity survey... Etc... Coordination with Chennai Corporation for Utility Diversion for shifting of Sewage and water line, Electricity Board, Telephone and networking cable shifting.

Responsibility:

Coordination with procurement department on the procurement schedule supervision for the site work

Supplier for compliance statement, test report and technical data sheet for approval

Ensuring the monthly invoice quantity breakdown and variation claims as per the compliance.

Attaining clearance, approval, permission and so on from statutory authorities on time.

Preforming installation and testing commissioning of sewage and water line

Participating in site meeting, monitoring project progress and arranging material at site

Interfacing with contractors on project planning to ensure completion.

Creating daily/ weekly/ monthly progress report and reviewing the same to validate comprehensive activity documentation.

Inspect the completion of the job and ensure the quality of work.

Ensuring that the project runs smoothly and the structure gets completed on time and within schedule and budget

March 2015- Dec 2016

URC CONSTRUCTION PVT LTD.

Position: MEP Manager

Project RAMANUJAM IT CITY, (TRIL INFO PARK) AREA 1 MILLION SQ/FT

Location: Chennai

Client: TATA Reality info limited

Position Held: MEP MANAGER

Main Project Features: IT Park 18 floor Building

Responsibility:

MEP System scheduling, planning, procurement, execution, quality and site Coordination for HVAC, Firefighting, Plumbing, STP, WTP, IBMS, Electrical with civil and design team coordination, CP & Sanitary installation and Inspection.

Preparation construction methodology for MEP services

Work involved working with team of engineers, producing drawings and getting it approved from Clients as well as from independent engineers.

The work also involved modifying the design and drawings as per site requirement so that work at site does not get affected.

Checking the of Design Basis Report

Preparation of work Specifications, Bill of Quantities, Site Specific Drawings and Data Sheets.

Preparation of bill and getting approval from client.

Checking the sub contractor bill and ensure the quantity of work and forward to the client.

Quality of work to be ensure if it unsatisfactory issue the NCR and get it clear the rectification work on time.

Coordination with procurement department on the procurement schedule supervision for the site work

Supplier for compliance statement, test report and technical data sheet for approval

Ensuring the monthly invoice quantity breakdown and variation claims as per the compliance.

Attaining clearance, approval, permission and so on from statutory authorities on time.

Given approval for shop drawing, material samples and inspection report, ITP, method of statement and delivery schedules in tune with the core business objective.

Preforming installation and testing commissioning of duct, sewage and water line

Participating in site meeting, monitoring project progress and arranging material at site

Interfacing with contractors on project planning to ensure completion.

Creating daily/ weekly/ monthly progress report and reviewing the same to validate comprehensive activity documentation.

Inspect the completion of the job and ensure the quality of work.

Ensuring that the project runs smoothly and the structure gets completed on time and within schedule and budget

July 2012- Feb 2015

Gammon India Limited

Position: Asst. Manager MEP

Project : Chennai Metro Rail Limited

Client : CMRL

Main Project Features: Chennai-Saidapet, Nandanam, Tenampet, Gemini. Under Ground Station. MEP System scheduling, planning, procurement, exécution. installation, quality and site Coordination for Electrical, Plumbing contractor, civil and design team coordination,

Preparation of Bill of Quantities, Data Sheets.

Preparation of bill and getting approval from client.

Checking the sub contractor bill and ensure the quantity of work.

Complete the work on schedule time

JUNE 2008- JULY 2012

DYNAMIC SS ENGINEERING COMPANY PVT LTD

Position: Project Engineer

PROJECT : MEENAKSHI ENERGY POWER PLANT (1000MW) GUDUR, NELLORE, AP

Client: MEENAKSHI ENERGY POWER

MEP System scheduling, planning, procurement, exécution. installation, quality and site Coordination for Firefighting, Plumbing, civil and design team coordination,

Work involved working with team of engineers, producing drawings to engineers.

Preparation of Bill of Quantities, Data Sheets.

Preparation of bill and getting approval from client.

Checking the sub contractor bill.

Ensure the Quality of work.

Complete the work on schedule time

ACHIEVEMENTS:

Championship in Volley ball and cricket tournaments at college level.

Other certificates and medals for various sports and cultural activities.

1St Rank in the Drawing elementary exam.

STRENGTH:

Advance Knowledge in Metro rail project.

Knowledge in MEP.

Knowledge in Fire Fighting, plumbing, HVAC, STP.

Ability to complete inspection and identify the job.

General Knowledge in Industrial safety.

Good Communication Skill.

Advance Knowledge in Computer – AUTO-CAD, MS Office, MS Project.

Good Understanding with contractor and workers.

Able to Work with Team.

PERSONAL DETAILS:

Name

:

Baskaran.B

Father’s Name

M.Balasubramanian

Permanent Address

:

S/O. M.Balasubramanian

Valluvar St, Meethikudi west,

Kovilampoondi (po),Chidambaram

Cuddalore district – 608002

Mobile:+919*********

Current Location

:

Bangalore

E-mail ID

:

:

admtpu@r.postjobfree.com

admtpu@r.postjobfree.com

Languages known

:

Tamil, English, Hindi,Telugu.

Date of Birth

:

29-07-1986

Sex

:

Male

Marital Status

:

Single

Nationality

:

Indian

Declaration:

I hereby declare that the above furnished details provided by me are true to my knowledge and conscience.

Yours faithfully

( BASKARAN.B )



Contact this candidate