Post Job Free

Resume

Sign in

Sap Project Power Plant

Location:
Machhagan, Odisha, India
Posted:
May 29, 2021

Contact this candidate

Resume:

DWAIPAYAN

DAS

Project manager

PROFILE

Equipped with significant 29 years work experience in Green field Projects of Power Plants, Coal and Manganese beneficiation plants and underground / open cast mines in India and Abroad, is now looking for an opportunity that will serve as a platform wherein my knowledge & experience can be shared & enriched. Also like to work in a progressive work culture with the freedom to be creative, innovative & to excel and grow with the organization.

I describe myself as a hardworking, analytical and enthusiastic person. positive attitude and integrity,

I have hands on experiences in

*Project Director 2 million tone manganese beneficiation plant at Gabon, Africa.

*Power projects 4 nos.(Thermal) 10 MW X 3 & 98 MW

*Power projects 2 nos.(Gas based and Thermal 25 MW )

*20000 Mt structural Fab. & Erect, Plant piping of 220 MW Power Plant.

*Power plant Operation, maintenance & Improvement.

*350 TPH Cooking Coal Washery Project. (Heavy Media Cyclone).

*Environment and Pollution Control

*Planning, maintenance, spares management of 2X60 MW Power Plant.

*Analyzing work culture & selection of equipment’s at various U/G mines in CHINA, UKRAINE & SOUTH AFRICA.

*Transport to U/G, Assembly & commissioning of Road header, LHD & SDL MACHINES.

*Project in-charge 2.5 million ton underground coal project.

*Project In-charge of 450 mtr. Vertical Shaft

*Handled green field mining project (DPR preparation, land procurement, Govt. clearances).

*3 nos. Under Ground Coal Mining projects (Incline 10 nos.,4500 meters & vertical shafts 2 nos.,250 meters )

*As Colliery Engineer in open cast & underground coal mines.

*Mining operations and maintenance.

*800 TPH Non-cooking Coal Washery Project(Heavy Media Bath)

CONTACT

PHONE:

+919********* WhatsApp

+918*********

Skype:

Krishdd1

EMAIL:

adms2v@r.postjobfree.com

HOBBIES

Travelling

Expedition Tour

Social Work

WORK EXPERIENCE

Job Responsibility Shouldering in different organizations are given below :

MANGANESE BENEFICIATION

Project Director of 2 million tones Manganese beneficiation plant at GABON, Africa. ( Present assignment)

POWER PLANT PROJECTS

Fabrication & erection of 20000 MT steel structure & plant piping of 220 MW X 2 thermal power plant.

*Planning, maintenance & spares management of 2 X 60 MW Thermal Power Station including 3 no’s Turbo Blowers for Blast Furnace.

*Over project in charge of 98 MW Thermal Power Station. Responsibility includes reporting to director.

* Project planning. Cash Flow Statement, Approval of drawings (layouts, P& I. Civil, Mechanical etc.)Purchase Order and Work order finalization. Statutory clearance from the Government Departments. Day to day project work monitoring.

*Overall project execution responsibility of 3 nos 10 MW power plant.

* Commissioning Work of Coal rejects (coal) Based Thermal Power Plants.

*Equipment’s Handled – 60TPH FBC Boiler Make – SEC CHECK REP., 10 MW Turbine Make Skoda, all type of Pumps, Air compressor, ESP, CHP, AHP, Boiler-auxiliaries

*Liaison Work With Client(CCL), Contractors & Govt. Official

*Overall Maintenance Responsibility of 10 MW power Plant Including CHP & AHP

*Taking Charge Of Total Plant in absence of Plant In charge (operation)

*Handling of Various Erection Contractors .Bill processing .Inspection Clearance from quality dept. Checking job as per P&I, isometric, Fabrication & Erection Drawings

*25 MW Gas Based Combined Cycle power plant, Adamtilla (Assam)

*Having Experience of Fabrication & Erection of 600 MT Structural job, Erection & Alignment of Various Equipment of 25 MW Gas Based Combined Cycle Power Plant Commissioning Activities with U.S.T.C., USA Team.

POLLUTION CONTROL

*Having Experience of Fabrication, Erection & Commissioning of Dust Extraction and Suppression System in Different Sites Located at- WB, UP, Jharkhand & Orissa.

*Equipments Handled Fans, Bag Filters, Cyclones, and Pumps etc.

Responsibilities of liasoning with clients, contractors dealing, material planning, bill preparation etc. were also taken independently.

COAL WASHERY

*Erection & commissioning of 350TPH cooking coal washery.

*Installation & commissioning of 400 TPH rotary breaker, Crusher, vibrating screen, feeders, conv. Belts, hydro cyclones, different pumps, belt press etc.

*Installation of Floatation plant.

*Operation & Maintenance of washery equipments.

*Material & spares management.

*800TPH non-cooking coal washery, site selection, layout finalization, contractors’ selection.

UNDER GROUND & OPEN CAST COAL MINES

*Projects execution of underground coal mines long wall and bolter miner project

*Independent charge of Green field 450 mtr Vertical Shaft project.

* Independent charge of Green field Dolomite mining project.

*Preparation of detailed project report, Land procurement, Govt. clearances

*Project planning, scheduling & execution of incline & vertical shafts.

*Selection of foreign contractors. (IN CHINA & UKRAINE).Selection of foreign equipment’s for incline & vertical shaft sinking. Inspection of equipment’s at CHINA & UKRAINE.

*Day to day job planning & material management with CHINA COAL COMPANY NO. 5 and UKRAINEUN TEAM.

*Installation & commissioning of 1000KW & 250 KW winder, Scraper loader, Skip, Shot- Crete M/C, belt & chain conveyor,Umbrella drill, Grab, winches, ventilation fan head gear structure etc. Erection, Commissioning & Maintenance of CHP, Different Pumps, Haulage .Road Header, LHD & SDL operation & maintenance.

*Member of selection team of equipment for coal production & mine plan design.

* Worked as a Colliery Engineer of Opencast & Underground Coal mines.

*HEMM maintenance, power distribution & pumping of Open cast mines

*Responsibility of total project job including civil activities. (4500 mtr. Incline & 250 mtr shaft sinking.

* Obtaining statutory clearance from DGMS.

ORGANIZATIONS & LOCATIONS I HAVE WORKED

Nouvelle Gabon Mining Ltd. ( Nov,19 to till date )

Indu projects Ltd. ( Feb,19 to Oct,19 )

Sadbhav Engineering Ltd (Aug’17 to Feb,19)

Dhanbad, Jharkhand.

DCS Ltd (Aug’16 to July’17)

BCCL Moonidhi, Dhanbad, Jharkhand.

Crown Consumable Promoting Pvt. Ltd. (Oct’15 to June’16) Place-Warangal, Telangana.

ELECTROSTEEL STEELS LTD. ( July’15 to Oct’15) PLACE - SIYALJORI,BOKARO JHARKHAND

*ELECTROSTEEL CASTINGS LTD. (May’09 to June’15)

PLACE- PARBOTPUR, TALGARIA, BOKARO, JHARKHAND.

*Jayaswal Neco Industries ltd (July’07 to April’09)

Place – 1.5 MTPA Underground Coal Project, Banjikhol, Raigarh, Chhattisgarh

*Meghalaya Power Ltd ( Feb’07 to July’07)

Place – 98 MW Thermal Power Station, lumshnong, Meghalaya

*Monnet Ispat & Energy Limited (May’03 to Feb’07)

Place - 1.5 MTPA Underground Coal Project, Milupara, Raigarh, Chhattisgarh

Place – 3.5 MTPA Coal Beneficiation Plant (Coal washery) Khalari, North Karanpura,

Ranchi, Jharkhand.

*DLF Power Limited (Dec. 1995 to April 2003)

Place: 15.5 MW Gas Based Combined Power Plant, Banskandi(Assam)

9 MW Gas Based Combined Cycle Power Plant, Adamtilla(Assam)

10 MW Coal Based Thermal Power Plant, Rajrappa (Jharkhand)

10 MW Coal Based Thermal Power Plant, Giddi(Jharkhand)

10 MW Coal Based Thermal Power Plant, Madhuband (JH)

*Power Max (I) Ltd. (May 1995 to Dec 1995)

Place – CESC Budge Budge (West Bengal)

*F. Harley & Co. Pvt. Ltd. (Feb. 1992 to April 1995)

Place – Kolaghat Thermal power Station, Kolaghat (West Bengal)IFFCO, Phulpur (Uttar Pradesh)SAIL, Rourkela (Orissa)NMDC, Kirandol (Madhya Pradesh)TISCO, Joda Mines (Jharkhand)DVC, CTPS, Chandrapur (Jharkhand

EDUCATION

*Passed Secondary Education During Year 1985 From West Bengal Board, Securing First Division with 65.88%

*Passed Higher Secondary Education During Year 1987 From West Bengal Council, Securing Second Division With 50.60%.

*Passed Diploma In mechanical engineering During Year 1990 From Sate Council for Engineering & Technical Education, Govt. of West Bengal, and Securing 1st Class with 70%.

IT SKILLS

*SAP project module, Windows-XP, MS-OFFICE 2007 & internet Etc. Project head for SAP project module implementation.

*Budget control for SAP projects. Project control through TOC software.

TRAINING

*Complete one year (13-01-1991 to 12-01-1992) – Post Diploma Training at M/s Hindustan Motors Limited, Hind motor, West Bengal

*Worked in inspection Department at Crank Shaft Division of Engine plant.

PERSONAL INFORMATION

Marital Status Married

Date of Birth 5th January 1969

Passport No. A-9547610

EXTRA-CURRICULAR ACTIVITIES

*Cycle Tourist, member of “Abhijatrik” Club, so far Travelled 3500 Kms.

*Football player – Regular Player in 2nd Div. Football League in year 1989-1992 Of Hooghly Dist.

VALUES & ETHICS

*I value honesty and ethics in my personal as well as professional life

*There is solution to every problem

Always there is scope for improvement

Dwaipayan Das

Date – 21.03.2021

Place – Hooghly, W B, INDIA



Contact this candidate