EDEN B. ANFONE
MECHANICAL ENGINEER
Abhu Hamour, Doha, Qatar
Doha, State of Qatar
Mobile: +974-********
***********@*****.***
Position Applied : HVAC Project & Maintenance Engineer Nationality : Filipino
Qatari ID # : 2 7 6 6 0 8 1 1 2 0 5
Passport # : P2311835B, Valid till 2029
Driving License : Valid Qatar Driving License
Looking towards where my knowledge, creativity, personal skills can be employed, developed. and to contribute and share my expertise and continuous learning of new trend technology.
Self-motivated goal getter and effective communication skills
Professional with over 6 + (17 Years in GCC) of combined experience in OIL & GAS, Industrial & commercial industry, Involve & familiar of all types HVAC Maintenance & Installation, Testing commissioning, Inspection, MEP Project Execution & Maintenance/Estimation & Tender /Project Planning / Safety policy/ Facility Operation, Material inventory also Familiar of Maintenance of all kinds of Plant mechanical equipment Units system and controls.
Solid background in interpreting Mechanical & Electrical design, P& ID, lay-out / Schematic diagrams. CAD models and equipment OEM manuals and evaluating of equipment breakdown, recommended spare parts replacement and root cause analysis evaluation method.
Strong analytical power with excellent capability in resource management and training capability.
Dynamic, skillful, and well-organized approach to modern HVAC equipment & controls.
Well-developed ability to lead, organizes, direct and motivates people at all level.
Able to emphasis and work with people of different backgrounds and cultures. EDUCATIONAL ATTAINMENT
Bachelor of Science in Mechanical Engineering
Manuel L. Quezon University, Manila Philippines
Diploma In Marine Engineering
Technological Institute of the Philippines, Manila Philippines
Secondary – High School
St. James high School – Recoletos,
Subic Zambales, Philippines.
PERSONAL INFO
CARRIER OBJECTIVE
SKILLS AND COMPITENCIES
CV Page 2 of 7
HVAC Equipment, Petra -Chiller Comprehensive Training Doha, Qatar
Commissioning Safety in oil and gas industry PHASE, Doha Qatar
Essential to oil and gas industry PHASE Doha Qatar
Highway Construction & Traffic Management Control PHASE Doha Qatar
Hydrogen Sulfide, H2S Venture gulf training center Qatar
Electrical Safety Venture gulf training centre, Qatar
Confined Space Entry Venture gulf training centre Qatar
Ladder safety Venture gulf training centre Qatar
Basic occupational Health & Safety PHASE, Doha Qatar
Safety Induction Course Qatar Steel, Qatar petroleum NGL, Oryx GTL, and Refinery
Boeing Terminology & Statistical Process Control DJ Aerospace,….American Naval base, Philippines
Computer Aided Design – Metal industry research and development center (DOST)………Philippines
Industrial Exposure Program – Department of trade and industry….DTI, Philippines
Philippine Geothermal plant – Familiarization of Mechanical Equipment & HVAC system…Philippines
American Wire & Cables – Familiarization of Electrical cables Philippines
ISO10012 –Standards for quality assurance requirements for measuring equipment
AS9100 – Aerospace standard for quality system
AS9102 - Aerospace standard for first article inspection
ISO 9001:2000 –Standard for Maintenance / HVAC installation and maintenance.
ASHRAE – American Society of Heating refrigeration and Air-conditioning Engineers.
SMACNA – Sheet Metal Air Conditioning Contractors National Association.
Master Cam / Cad Cam software version. 5.5; 6.13; 7. 2, 8.20 (2D & 3D Model)
Computer aided manufacturing, CAM & Computer aided Inspection, CAI – CMM
WIN CMES software version 14.0 – Programming for aircraft parts/component
HVAC HAP DESIGN Version 4.41 (Hourly Analysis Program), HVAC Heat Load
AUTOCADD 2004 - 2007
Primavera P6 Software - For Planning
Microsoft application, MS word/Application, Excel and Power Point PROFESSIONAL QUALIFICATION – TRAINING, PTW, AND SIMINAR ISO - TECHNICAL SKILLS
COMPUTER SKILLS
CV Page 3 of 7
COMPANY : KASSIM DARWISH FAKHROO & SONS
(DMEC, Darwish Mechanical & Elect. Co.)
Subsidiary of M/s KDS group of state of Qatar)
is a EN ISO 9001:2000 accredited company
PROJECT: MAINTENANCE & INSTALLATION OF HVAC EQUIPMENT Site Location: QATAR PETROLEUM - Around Qatar
Natural Gas Plant, NGL Doha Qatar - Mesaieed
Refinery Plant Doha Qatar - Mesaieed
Dukhan Facilities Doha Qatar - Dukhan
Ras Laffan Gas Plant Doha Qatar, Ras Laffan Ras abhu abuod QP Facilities Bldg… Doha, Qatar
Oryx GTL, Ras Laffan Plant Doha Qatar, Ras Laffan Qatalum Facilities Doha Qatar - Mesaieed QVC Facilities Doha Qatar – Mesaieed
Qatar Airways Facilities Building Doha, Qatar main Qatar Military, Shooting range Camp...Doha, Qatar
DATE : October 2009 TILL DATE, Currently working in QP Dukhan Facilities POSITION : Sr. HVAC – Project & Maintenance Engineer JOB AND REAPONSIBILITIES:
Handling /Supervision and Coordination to the client of all HVAC Maintenance & Installation, Inspection, & servicing of various types of plant mechanical equipment, Include all types of MEP Maintenance, in all government sites in the state of Qatar.
Implementation of HVAC Maintenance planning (by Monthly, Quarterly and Annual)
Responsible of verifying of work orders and execution of MEP Maintenance and installation plan.
Guiding of HVAC Installation and Maintenance of different types of system and BMS control
Participation in new tender and Stock inventory controls.
Manpower planning and related labour and staff issues.
Projects costing and budgeting & prepare commercial proposal / BID price.
Implementing of new HVAC equipment modifications of systems as per client’s requirements
Monthly reports on site progress /Planning status and follow up of work orders.
Prepare project work schedule/ PPM and MEP Maintenance plan including toolbox talk.
Responsible for all handing over project document submission
Handling project execution, planning, Review and prepares QA Procedure and safety procedure
Review of different HVAC standard such ASHRAE and SMACNA.
Knowledge of making heat load calculation using HAP 4.41 system design.
Responsible of making Air Balancing Test Report and RFI reports.
Responsible of INSPECTION of all HVAC installation maintenance &their associated equipment
Responsible of making PPM Plan, LIFTING PLAN, JHA and METHOD STATEMENT for HVAC maintenance and installation project.
Perform site inspection and compliance and Liaise to third parties consultant for equipment certification approval.
PROFESSIONAL EXPERIENCE
CV Page 4 of 7
COMPANY: AL OHOOD CONTRACTING COMPANY
3rd. bldg. Al Atlal District Abdullah Bldg.
P.O Box 54352, Jeddah KSA
PROJECT: MEP - HVAC Installation and Maintenance
Site Location: Around KSA, Jeddah, Riyadh, Dammam, Taif, etc. Saudi Aramco Plant & Facilities, HVAC Maintenance…..Jeddah/ Riyadh KSA LG Complex tower Riyadh KSA
Sabola Group Jeddah, KSA
Saudi royal Palace Riyadh KSA
Saudi Royal Housing and Facility Jeddah, KSA Toys R Us Jeddah, KSA
Red Sea Mall Jeddah, KSA
Panda Hypermarket Mall Project Jeddah, KSA Saudi Processing Cement plant Dammam,KSA Taif resort & Hotel Taif, KSA
Date: November 2005 – May 2009
POSITION: MEP – HVAC Mechanical Engineer
JOB AND REAPONSIBILITIES:
Handled & supervision of all Installation & HVAC Maintenance, MEP Mechanical equipment, Pumps, Ventilation, Cooling tower, Actuator, Valves, Control room BMS etc., in all facilities plant in Saudi Aramco.
Estimation, planning, procurement, project execution for construction, renovation and fit-out works.
Review and establish as per contract drawings, project specification & contract bill of quantities
Implement site mobilization, temporary facilities required at site and deploy the manpower required to begin the work.
Daily monitoring activities of preventive & corrective maintenance & to follow up of work orders and work notification
Prepare project work schedule, material submittal schedule, drawing submittal schedule, material enquiries with all required data and send to suppliers for quotation and evaluate the same against specification.
Attend site meetings with the client / general contractor client and provide site progress report.
Prepare RFI’s and get approval from consultant.
Decide approved specialized sub contractors to get the best possible prices to manage control project cost.
Prepare and develop testing procedures & O & M manuals.
Scheduling, planning Testing and Commissioning and proper handing over of HVAC equipments and project documentation.
.
PROFESSIONAL EXPERIENCE
CV Page 5 of 7
COMPANY: DJ AEROSPACE
American Naval base Argaunot Industrial Park
Naval Magazine Area, Subic Bay Philippines.
PROJECT: MILITARY AIRCRAFT AND
COMMERCIAL AIRCRAFT COMPONENTS
Boeing Aircraft Parts
Cesna Aircraft
Lockhead Martin
Date: July 2001 – June 2005
POSITION: QA/QC – Mechanical Engineer
JOB AND REAPONSIBILITIES:
Responsible of making programs using LK CMES SOFTWARE for every aircraft component.
Supervise shop technician and machinist and coordinate to the shop manager.
Checking of aircraft component using CMM (Coordinate Measuring Machine) precision tools such as caliper, high gage, micrometer, pin gage, bore gage etc. & inspection of all standard gages, test equipment and tooling used to manufacture product.
Responsible for documentation of QA/QC test report and validation of result.
Checking of finished product on their measurement and tolerances and as per aerospace manufacturing standards & in reference with Aircraft international standard and first article inspection.
Preparation of inspection report, incoming materials and preparation of traceability reports.
Check and review mechanical drawing and verify using cad model if there are any changes
Implement and maintain the equipment control program including equipment calibration, validation and report quality system performance for management review and quality improvement, documentation of necessary inspection and test instruction.
Conduct test & analyses of aircraft parts & materials to determine their grain direction and other characteristic, Prepares aerospace standard programs and schedules for operation.
Prepares test result and evaluate non - conformance for improvement. PROFESSIONAL EXPERIENCE
CV Page 6 of 7
COMPANY: EEI – ELECTRODYNAMICS CONSTRUCTION & DEV’T. Bagong ilog, Pasig city, Manila, Philippines
PROJECT: POWER, FACTORY,CEMENT PLANT
Site Location COMMERCIAL AND INDUSTRIAL BUILDING- Around Philippines Bulacan Cement Plant Philippines
Coca Cola Bottling Plant Philippines
Pepsi Cola Bottling Plant Philippines
Pagbilaw Geothermal Plant………Philippines
RCBC Tower – Makati City………Philippines
Date: December 1997 – April 1999
POSITION: Junior Site Coordinator
JOB AND REAPONSIBILITIES:
Handle all accreditation, site inspection and documentation.
Coordinate with Sr. Mechanical Engineer & Assist in mechanical Equipment installation schedule during construction project of HVAC, Electrical Panel, Pumps, Ventilation, BMS Controls, Chiller, Plumbing & Piping works etc.
Attend site survey and inspection for costing purposes.
Daily monitoring at site / and submit project status report on percentage basis and safety related concern
Check and review mechanical plan, prepare & arrange necessary work permits.
Liase to 3rd. party consultant for approval of heavy equipment certificate validation.
Compliance of RFI, Request for inspection of project as per approved design & drawings.
Philippine Society of Mechanical Engineers
Association of Marine Engineers of the Philippine
Association of Safety Engineers - Doha, Qatar.
PROFESSIONAL EXPERIENCE
AFFILIATION
CV Page 7 of 7
1000 ton capacity York YK Centrifugal chiller +Cooling tower, Pumps, BMS (Allen Bradley)
300 – 200 ton capacity YCAS York Air cooled (Screw type Chiller)
80 – 120 ton Millennium York Screw chiller YCUL York Air cooled condensing unit (CDU)
155 - 210 ton capacity Trane Screw chiller
30-50 ton capacity scroll Compressor, York
70/80 ton capacity SKM Air cooled chille (Semi hermetic)
100- 120 ton capacity 30GX I 30xa Carrier Chiller
17 ton Capacity Mcquay, Mcenergy Evolution model
50-100 ton SKM capacity water cooled & air cooled
Tandem Compressor Bitzer/ Copeland and from 15 to 100 ton capacity package and central Split units in different make York, Trane, LG, Petra PPHc, Carrier, Mcquay/Daikin, Royal water cool, Explosion proof Central AC, SKM, AHU, Split, VRV/VRF, BMS Fans, Pumps, Exhaust Fans, Ventilations, Actuator, Valves, Piping, Ducting, Water Cooler, Split AC,
Upon Request
The above information is true and correct to the best of my knowledge EDEN B. ANFONE
Applicant
END
MECHANICAL - HVAC FAMILIAR EQUIPMENT & MAKE
REFERENCE