Post Job Free

Resume

Sign in

Design Engineer Piping

Location:
Beaumont, TX
Salary:
12500.00
Posted:
May 20, 2021

Contact this candidate

Resume:

JOB OBJECTIVE

To acquire a position as a: Project Engineer, Sr. Piping Engineer, and Project Coordinating of

Piping / Pipeline Engineering, Project Manager Piping / Pipeline and

Sr. Pipeline Engineer, Construction Engineer.

SUMMARY

I have more than 27 years’ experience in Project Design Engineering and Project Management Consultancy

(PMC) (PMT) which includes design of different refining facilities as well as high- and low-pressure Pipeline Systems design and construction. My broad experience includes, review of Contractor’s design documents which comprise of all piping and pipeline design drawings, specifications writing, related calculations, Material selection, technical bid evaluating, and reviewing of vendor data, design related integrity management and operability. I have complete knowledge of all design phases associated with a project as well as a complete working knowledge of relevant design codes, standards, and specifications such as ASME, API, NFPA, and TEMA for pressure vessels, piping, valuing, etc. as well as a working knowledge of NACE MRO175 requirements for use in sour service, namely a H2S present environment. I have been the lead on project teams with as fifteen or more members and projects which range in value from 20 million to 8 billion. My current assignment is Project Engineer for Saudi Aramco in the capacity of Lead Piping Engineer, 3D model Coordinating Manager & Office Safety Coordinator for the ISF Package 7 and Project Engineer & Construction Engineer for the Gas Inlet and treatment Facility Packages 1 & 2 of the Saudi Aramco Fadhili Gas Plant Project.

Dec. 2017 – Present

March 2015 – July 2017

1.

May 2009 – May 2014

Magnum Investment Co.

Project Director

(Private investments leasing, sales and Consulting)

Project Engineer (Piping/Pipeline/Mech.)

Saudi Aramco Fadhili Gas Plant Projects

Engineering Projects worked are:

1. Project Eng./Manager, Project Design Engineer and Site Construction (Plant Superintendent) managing the piping works for all Underground & Above ground utilities, and layout and design, pipeline 10” water line to residential camp. Managed the 3D modeling and scheduled the, 30, 60 & 90% reviews between Contractor and Saudi Aramco. Managed Office Safety for Aramco at the sub-contractor’s office Jacobs Zeta Building. While supporting the following Packages for Aramco Fadhili Gas Plant Project.

a.Industrial support Facilities (Package 07)

b.Process Utilities & Interconnecting Systems (Package 02)

c.Temporary Construction Facility (Package 11)

d.Temporary Utilities & Access Roads (Package 10)

e.Residential Facilities (Package 06)

2.Fadhili Gas Inlet and Treatment Project (Package 1 & 2)

Project Eng. 1 (Mechanical Site Superintendent)

Underground & above Utilities, (area D46, Unit 600)

Above ground Piping (Unit 700)

Tank Erecting (Package 1 & 2)

Pipe fabrication shop review & monitoring

Tank fabrication shops review & monitoring

Lead Piping / Pipeline Engineer-1,

Worley Parsons (Kuwait Operations)

Engineering Projects worked are:

1.Effluent Water Transfer Project Water Injection EF-1071/1082

Design, Develop and Coordinate all piping and pipeline drawings,

specifications writing, Material selection, surveying, piping cal-

-culations checking, as well as bid and contractor evaluation.

2.Sea Water Treatment Project and Treated Water Transfer Project

EF-1761 Design, Develop and Coordinate all piping and pipeline drawing layouts, specifications writing, Material selection, surveying, checking of all pipe and pipeline work.

3.Ware Water Injection Project EF-1772, Design and Develop piping and pipeline drawings, specifications writing, Material selection, surveying, piping calculations checking, as well as bid and contractor evaluation

4.Ahmadi Hospital project site location EA-1062 (Design, Revamped

and Checked) all existing piping and pipeline drawings, specifications, Material selection, surveying, piping, redesign sanitary sewer line approximately 700meters in length with flow rate calculations and write scope of work included for project development.

5.Lower Fars Heavy Oil Development North Kuwait EF-1852, Piping Design, Develop and Coordination of the Project Support Complex (PSC) all piping and pipeline drawings, specifications writing,

Material selection, surveying, piping calculations and checking for this

as well coordination of other areas of the project with the

Canada and the Houston office and other PMC project interface

Work in this project area as well as bid and contractor evaluation.

Oct 2008 – May 2009

Sr. Piping Design Engineer, Sr. Checker & Field Tie-In Coordinator, Chevron Refinery Projects, for Worley Parsons/TPG Oil Gas & Entergy Co., Inc. West Coast operations (Monrovia, CA.)

CVX-Isomax, FCC, Alyka, Cooling Tower #14, OSBL, & Crude Unit #2 Revamp, CVX-R1 H2 Purity Projects, El Segundo, CA. Plant locations.

Design Develop and Coordinate, field survey and checking of all piping

Layouts and drawings. Material selection, surveying, piping calculations, checking for this as well coordination of other areas of the project.

Aug 2007 – Oct 2008

Lead Sr. Piping Design Engineer, Sr. Checker & Field Tie-In Coordinator. Chevron Upgrade Project for Worley Parsons / ETG. Engineering Technical Group / West Coast operations, (Monrovia, CA.)

Chevron Refinery Revamp Projects: CVX-Isomax and CVX-R1 H2 Purity Projects, El Segundo & Richmond CA. Plant locations. Design Develop and Coordinate, field survey and checking of all piping layouts and drawings,

Feb 2006 to Aug 2007

Lead Piping Design Engineer, Project Piping Coordinator,

Englobal Engineering, Inc. (BMT, TX.)

2007 Turn-Around at ExxonMobil FCC unit for Worley Parsons. Lead Piping Engineer on Turbine Pumps Oversee Bypass layout and redesign. Main duties included assigning manpower and man-hours, Coordinate work design and, Coordinate field survey and checking of all piping layouts and drawings.

H2S Flare Gas Recovery System Capital Projects. Main duties included assigning manpower and man-hours, Coordinate work design and, Coordinate field survey and checking of all piping layouts and drawings Calculation and Man-hour distribution and Coordination.

May 2002– Jan 2006

Lead Sr. Design Engineer and Checker,

Matrix Engineering Co. (BMT, TX.)

Main duties included Engineering Design development & Construction, including assigning manpower and man-hours for projects completion, coordinate engineering design work as well as, Coordinate field survey and checking of all engineering layouts and drawings Calculation and Man-hour distribution and Coordination including all work Revamp and Modifications.

Oct 1987 - Feb 2002

Sr. Piping Design Engineer/Piping Coordinator,

Consulting Engineering & Construction, Co. (BMT, TX)

Texaco MPU #4 Expansion and Site Modifications. Duties included engineering design, layout and developing piping systems. Duties also include Engineering Design development & Construction, including assigning manpower and man-hours to projects, Coordinate work design and, Coordinate field survey and checking of all piping system layouts and drawings. Pipe engineer Calculation and Man-hour distribution and Coordination including all work Revamp and Modifications. Locate and coordinate all tie-in and hot-tap points and supervise redesign of those areas.

Texaco SRU P&ID revamp; Chevron Reactor Addition. Main duties included Engineering Design development & Construction, including assigning manpower and man-hours to projects, Coordinate work design and, Coordinate field survey and checking of all piping layouts and drawings Calculation and Man-hour distribution and Coordination including all work Revamp and Modifications. Locate and coordinate all tie-in and hot-tap points and supervise redesign of those areas.

Kellogg / Fina Oil Co. joint venture project, Hydrocractor Expansion Offsite. Main duties included Engineering Design development & Construction, including assigning manpower and man-hours to projects, Coordinate work design and, Coordinate field survey and checking of all piping layouts and drawings Calculation and Man-hour distribution and Coordination including all work Revamp and Modifications. Locate and coordinate all tie-in and hot-tap points and supervise redesign of those areas.

Texaco Chemical & Asphalt expansion Main duties included assigning manpower and man-hours, Coordinate project design engineering and, field survey and checking of all piping layouts, design drawings, Calculation and Man-hour assessments.

Mobil Oil cooling water over spray revamps (North & South Plant). Lead Piping Design Eng. at ExxonMobil Oil Refinery (BMT Plant) for over spray revamp and other Maintenance Projects – Mech. Dept. Other work duties included supervising projects (hours and work distribution) to squad and checking work for shop fab. Field Supervisor and Drafting Coordinator/Group Leader at; BASF/Fina Project at Fina Refining Plant, Port Arthur, Texas location.

Jul 1987 – Sep 1987

Sr. Lead Piping Design Engineer,

Eagleton Engineering Co. (Houston, TX)

Duties included contract Petro-Chemical Piping Design assignments - project worked Enron Gas Plant. Work duties included supervising projects (hours and work distribution) to squad and checking work for shop fab. Field Supervision and Design Coordinator and Group Leader.

Jan 1987 – Jun 1987

Sr. Lead Piping Design Engineer / Project Coordinator,

Alliance Engineering Co. (BMT, TX)

1.North Star Steel Plant

a.Contract assignment to redesign steel Overhead Crane and Loading facility and conveyor – Major Design duties included, Coordinate work design and, Coordinate field survey and checking of all structural layouts and design drawings.

2.Exxon Mobil Chemical Plant

a. Major Revamp of Chemical Plant Utility System work duties included design and checking of working drawings for shop fab. Field Supervisor and Drafting Coordinator.

Jul 1985 – Dec 1986

Piping Design Engineer:

Pascagoula Naval Shipyard (Pascagoula Miss.)

Piping Layout & Design Engineer Systems on Government Battleships routing of different piping systems located on naval ships. (Classified)

Main duties included Engineering Design development &, Coordinate work design and, Coordinate field survey and checking of all piping layouts and drawings Calculation and Coordination including all work Revamp and Modifications. Locate and coordinate all tie-in and hot-tap points and supervise redesign of those areas.

Aug 1979 – Jun 1985

Lead Piping/Mech. Design Engineer and Checker/Project Group Leader, TMSI Arabia, Ltd. (Saudi, Arabia)

Duties included coordinating and managing all piping and pipeline engineering layout and design at the different Aramco Plant sites in Saudi Arabia.

Engineering Design & Layout of New Gas Oil Separation Plant. Main duties included Engineering Design development & Construction, including assigning manpower and man-hours to projects, Coordinate work design and, Coordinate field survey and checking of all piping layouts and drawings Calculation and Man-hour distribution Locate and coordinate all tie-in and hot-tap points and supervise redesign of those areas.

Check drawings and distribute work to men in the field of Process Piping Design, P&ID diagrams and coordinate all infrastructure Piping and Pipeline engineering and other utility designs to accommodate living conditions.

Supervise Layout of New International Airport Jet Fuel Pipeline and Piping Systems. Main duties included Engineering Design and development as well as the duties of assigning manpower and man-hours to projects, Coordinate work design and, Coordinate field survey and checking of all piping layouts and drawings Calculation and Man-hour distribution.

Jan-1976 – Aug 1979

Lead Piping Design Engineer / Group Leader & Checker,

Velsicol Chemical Corp. (BMT, TX)

Duties included coordinating layout designs from flow sheets and field sketches. Checking drawings, piping, main Project Design Ban vile Unit and construction (Major Project)..

Coordinate Work to Designers & Draftsmen review and distribute man -hours. Checking of all piping layouts and drawings Calculation and Man-hour distribution.

Supervise and distribute work to men. Also worked as lead Liquid Transfer Engineer and P&ID up-date coordinator at the Illinois refining facility. Engineering design.

17 – Months

Piping/Structural Engineering Designer,

Hydrocarbon Construction Co. (BMT, TX)

Duties included making design drawings from engineering sketches and P& ID sheets of isolated areas to be redesigned in several refineries.

Major projects worked – Mobil Oil Refinery Wax Blend Facility upgrade Piping design works and unit add on. Texaco Refinery redesign of oily water sewer system and H2s system walk down, revamp and P&ID update.

23 –Months

Engineering Piping/Structural Designer,

Bethlehem Steel Yard (BMT, TX)

Duties included making working piping drawings from engineering data of different systems on Jack-Up Rigs and Drill Ships. Also redesigning piping system to become more functional from engineering diagrams and design data.

26 – Months

Piping Draftsman,

Brown & Root (Houston, TX)

Duties included making working drawings from engineering sketches in the field of marine and petrochemical piping and pipeline. Also worked from flow sheets, spooling, and schematic drawings according to specifications. Served as Filed Inspector for several months. Major project worked – Marathon Oil and BP Alaskan Projects.

EDUCATION

Masters Public Administration (Graduate Studies)

Lamar University, 2000 - 2002

BS Industrial Engineering Technology Degree with Mechanical Engineering Studies,

Lamar University, 2000

Associate Degree in Mechanical Engineering Design Technology,

Lamar University, 1976

Pre-Architecture Design Engineer,

North Texas State University, 1971-1972

Certificate of Completion: Engineer Pipe Drafting & Design layout,

Lamar University

Worley Parsons PDS Training

Worley Parsons, Monrovia, Cal. 2008

Brown & Root Process Design School

Brown & Root Engineering Co. Houston, Tx.

Dale Carnegie Course of Human Relations, Communication and Leadership

(Highest Award).

Certificate of Completion: Real Estate,

Lamar University

SPECIFIC TECHNICAL EXPERTISE/SPECIALISED TRAINING COURSES

Successfully completed Worley Parsons PDS Training

Successfully completed Brown & Root Process Design School

Successfully completed Dale Carnegie Course of Human Relations,

Communication and leadership (with Highest Award)

Frequently used software : AutoCAD 2006/2009/2011

Micro Station

Smart Plant Review

Quanta Point

PDMS-Intergraph

Smart Plant Foundation

References: Available upon request.



Contact this candidate