Post Job Free

Resume

Sign in

Electrical Engineer Muntinlupa

Location:
Quezon City, Philippines
Posted:
May 18, 2021

Contact this candidate

Resume:

iLF Consulting Engineers

Abu Dhabi, UAE

June ***8 – February 2020

Position: Electrical Engineer

- Prepared and accomplished proposal deliverables for FEED projects in line with site survey reports and project documents with proper and economical engineering.

- Reduced some list of engineering deliverables from project team that are not required which cut project cost and man-hour of preparation of deliverables before project start.

- Reviewed scope of work, list of deliverables, and technical query before design preparation to avoid discrepancies and rework in deliverables.

- Preparation and completion of Design Basis in accordance with scope of work, which to be used in project execution by Contractor and Client.

- Preparation and completion of necessary electrical specifications and data sheets envisaged in the project used for electrical equipment requisition by Contractor and Client.

- Reviewed/checked of electrical deliverables before issuance to keep a good quality of the documents/drawings.

- Established and accomplished overall key Single line Diagram in every project to use as a main reference of electrical deliverables and to show overall electrical system of the project.

- Prepared reliable adequacy check report of electrical equipment, feeders, and cables used to supply new loads and submitted to Client to show that the equipment for supply is adequate and no modification required which save the cost of the Company.

- Reduced number of runs, sizes of cables for the new loads based on cable sizing calculation and proposed to Client to reduce their cable to lessen their cost.

- Enhanced grounding calculation to get overall resistance less than 1ohm as per IEEE142 to protect the electrical equipment from getting damaged under the fault condition that used also as a reference in earthing layout design. Philippines, Quezon city Skype ID : jqdelima Linkedin : john quincy delima

[email] : admizi@r.postjobfree.com [mobile] : +63-936******* JOHN QUINCY P. DELIMA

CAREER SUMMARY

Registered Electrical Engineer with 13 years of experience in Electrical System Design, Engineering, Procurement, Construction, Commissioning and Consultancy within the Oil & Gas Refineries, Petrochemical Plant, Power Plant, Industrial and Commercial Building. As per my basic and detail engineering expertise, I am capable to provide reliable and economical electrical system design deliverables ranging from Low Voltage to High Voltage inline with the project schedule. I am knowledgeable in engineering software for system study and design software for 2d layout and 3D modeling used for project execution. I possessed effective interpersonal communication skills with multi discipline project teams. CAREER / INDUSTRY EXPERIENCE

• Birth date • Citizenship

Jan. 19,1982 Filipino

• Sex • Civil Status

Male Married

• Age • Ethnicity

38 Asian

• Height • Weight

5’ 7” 180 lbs

Personal Info

Registered Electrical Engineer (REE)

Page 1 of 4

Education

BS in Electrical Engineering

Mapua Institute of Technology

Manila, Philippines

May 2004

Secondary Education

San Sebastian College

CM Recto, Philippines

March 1999

Primary Education

San Sebastian College

CM Recto, Philippines

March 1995

Qualifications

• Hardworking and self motivated

• Quickly adapts and learns new Tech.

• Fresh and is eager to learn

• Responsible and organized

• Positive attitude towards work

• Strong leadership skills

• Values respect in all aspects of life

Registered Electrical

Engineer

Examination Date – September 2004

License No. : REE – 0034519

Passed

CORE COMPETENCIES

• Analytical thinking

• Client satisfaction and interaction

• Computer competencies (design software)

• Coordination consistencies

• Conflict resolution

• Decision making

• Economical engineering and design

• Man-hour control

Professional License

Registered Electrical Engineer (REE)

JOHN QUINCY P. DELIMA

Page 2 of 4

Skills

• 3D Naviswork, 2D Microstation, 2D

AutoCAD

• Dialux Luxicon

• Electrical Data Processing Program

(EDPP)

• Electrical Transient Analysis Program

(ETAP)

• Everything 3D (E3D)

• MS Office

• Plant Design Management System

(PDMS)

• Plant Design System (PDS)

• Smart Plant 3D(SP3D)

• Smart Plant Review (SPR)

• Smart Plant Electrical (SPEL)

- Preparation and completion of load list and electrical equipment sizing (e.g. generator, transformer, switchgear, UPS, etc.) including 20% spare for future loads and got the final rating used for equipment datasheet inputs, material requisition, and Single line diagram.

- Established and accomplished cable schedules used for cable MTO and cable laying in construction.

- Prepared Tie-in schedule for the new loads from existing switchgear and checked if any modification is required to inform Client what feeder and cubicle number to be used in cable termination in existing switchgear.

- Developed electrical installations details for Overhead lines, power, lighting and earthing envisaged in the project and add some missing details such as high mast lighting which need in a project.

- Proposed to Contractor to use existing cable trench and cable tray in some projects and to verify on site for actual installation if it is adequate to lessen cost of cableways.

- Verified to Vendor about actual number of cable entry of Heat trace Junction box which is not inline in their single line and Vendor print which to be incorporated in Block diagram and to give correct information to Client.

- Preparation and completion MTO based on latest design including contingencies, which used in Material requisition of the equipment and bulk materials. Fluor Daniels

Muntinlupa, Philippines

April 2015 – June 2018

Position: Electrical Design Engineer

- Preparation and completion of Hazardous Classification layout based on hazardous source list to be used for selection of proper electrical equipment inside/outside classified areas.

- Enhanced and accomplished Standard Installation Details of Lighting, Earthing, Power and Cable tray envisaged in the project, which approved and implemented for construction.

- Prepared, designed and accomplished overall key Single line Diagram to use as a main reference of electrical deliverables and to show overall electrical system of the project.

- Completed 3D modeling and it’s model parts (e.g. earthing, lighting fixtures, cable tray etc.) together with 3D models of other discipline to minimize clashes found during model review which to be used for 2D layout drawing via 3D model extraction, Draw, and smart sketch.

- Accomplished lighting calculation, calculation report and fixture allocation using Dialux software which used for lighting layout design.

- Preparation, designed and completion of lighting, earthing, and power layout, which are approved and implemented for construction.

- Preparation and accomplished Technical Bid Evaluation (TBE) of electrical equipment in prefab substation that evaluates what Vendor is more complied in project requirements.

- Accomplished Technical Clarification Report (TCR) of long lead items such as HV, LV Switchgear, AC UPS, LV Distribution board, and DC UPS & Battery system for project proposal that cleared some items need to be clarified to Vendors. DAELIM CO. LTD

Seoul, Korea

June 2012~June 2014

Position: Electrical Design Engineer

- Engineering interpretation and coordination with Client to keep the project execution on track and avoid any re-work and delay of engineering deliverables.

- Reviewed engineering concept, project specification, ITB drawings and project standard

(NEC) and (IEC) inline with engineering deliverables to keep correct output.

-

Up- to Codes & Standards

• Abu Dhabi Distribution Co. (ADDC)

• British Standards Institution (BSI)

• ADNOC Standards (DGS)

• Det Norske Veritas (DNV)

• Federal Admission Adm. (FAA)

• Russian Standard (GOST/PUE)

• Int’l Civil Aviation Org. (ICAO)

• Int’l Electro technical Com. (IEC)

• Inst. of Electronic & Elec. Engr. (IEEE)

• Illuminating Engineering Society (IES)

• National Electrical Code (NEC)

• Norwegian Std. (NORSOK E-001)

• Shell DEP (Design and Engineering

Practice)

Registered Electrical Engineer (REE)

JOHN QUINCY P. DELIMA

Page 3 of 4

Projects / Clients

• 05.2005-06.2012

SEG (ONSHORE) / SAKHALIN

QGX 3 and 4 (ONSHORE) / Qatar GAS

RGX-6 and 7(ONSHORE) / Ras Gas

TMP (ONSHORE) / Tokuyama Malaysia

SDN. BHD.

PNG (ONSHORE) / Esso Highlands

Limited

• 06.2012-08.2013

SADARA MFC (ONSHORE) / DOW

chemicals

• 08.2013-06.2014

Ammonia (ONSHORE) / MA’ADEN

KOC (ONSHORE)/Kuwait Oil Company

Rumaitha Shanayel (ONSHORE)/ADCO

RMP (ONSHORE) / PETRON

• 04.2015-12.2016

SASOL (ONSHORE) / Lake Charles

Chemicals

RAPID project, Southern Johor,

Malaysia (ONSHORE) / PETRONAS

• 09.2017-06.2018

AMURSKY GAS PROCESSING PLANT

(ONSHORE), Russia / GAZPROM

• 06-2018-02.2020

Shah Gas Development (ONSHORE) /

Al Hosn Gas

Missan Oil Field, Southern Iraq /

CNOOC

Revamp of HVAC system, Ruwais

Refinery / ADNOC

- Accomplished Technical Bid Evaluation (TBE) of electrical equipment such as Diesel Engine Generator, Power Transformer, UPS & Battery charger, solar power, Capacitor bank etc. for FEED projects to recommend which Vendors to be considered based on complied requirements, delivery time and price.

- Prepared and accomplished Material Requisition (MR) of lighting fixtures, local control stations, panel boards, transformers, welding receptacles and junction box etc. to be send to procurement team to get quotation from Vendor for review.

- Accomplished technical clarification of Vendors quotations in accordance with company requirements, project standard and project specification to clear some items need to clarify to Vendors.

- Reviewed/approved equipment-sizing, cable sizing calculation, lighting calculation from subcontractor to keep proper and economical engineering.

- Updated and accomplished key SLD and protection metering SLD’s based on revised loads to inform equipment Vendor about the changes associated in equipment before purchase to prevent modification of equipment in the future to save cost.

- Reviewed and updated Equipment layout as per Vendor equipment general arrangement drawings if still suitable in substation together with other equipment to maintain equipment clearance and access for maintenance.

- Reviewed/checked cable routing layout (i.e. cable tray and trench) to verify that all cables from source of supply to loads are considered.

- Reviewed and developed cable schedule inline with cable sizing calculation to avoid undersize/oversize cable and maintain proper cable sizing.

- Coordinated to Vendor to revise their Vendor Print regarding missing items at electrical equipment such as, earthing lugs, blind plugs and incorrect tagging which to be inline with project requirements.

- Prepared and issued supplement Purchase Requisition (PR) if the quantity of the ordered equipment increased based on latest design to avoid any delay before schedule delivery.

- Coordinated and discussed to Client regarding Vendor deviation related issues for their approval to close Technical Bid Evaluation (TBE) as per planned schedule.

- Coordinated to site personnel regarding construction issues and gave advice to solve the problems to limit cost impact.

Chiyoda Philippines

Mandaluyong, Philippines

April 2011 – June 2012

January 2009 – June 2010

May 2005 – April 2007

Position: Electrical Designer

- Prepared and accomplished detailed design of lighting, lightning protection, earthing, telecommunications, cable routing, Equipment, and cable tray which are approved for construction and implemented on site.

- Prepared and accomplished MTO of bulk materials envisaged in a project to avoid material shortage.

- Accomplished layout drawings update for As-built Projects.

- Preparation and completion of 3D modeling of Cable Duct, Local Control Switch, Lighting Panel, heat race JB and Stub-up using PDS (Plant Design System).

- Designed and completion of Electrical System of Sun plaza building for construction application.

- Supervised electrical works at Sun Plaza building to ensure the Installation is inline with layout drawings.

- Trained newly hired employees for operation of design software (e.g. Auto cad, 2D CAD Microstation SE, V8, Plant Design System, Smart Plant Review) and Material Take off Procedures and Electrical Design Procedures for them to start with the project immediately.

- Prepared and accomplished lighting panel schedule and lighting wiring diagram. Registered Electrical Engineer (REE)

JOHN QUINCY P. DELIMA

Page 4 of 4

- Prepared and accomplished layout drawings for general FEED projects such as earthing layout, power layout, cable trench opening and Material Take Off of earthing which are approved for design.

Qatar Pearl Shell GTL

Ras Laffan, Qatar

June 2010 – April 2011

position: Electrical Field Engineer

- Cleared and solved engineering concerns at field and cooperate construction works, monitor material at site and report the availability and forecast to supervisor to avoid any delay in construction.

- Site verification, preparation and completion of field design modification as per site condition to maintain proper design and engineering.

- Collection of data to get reliable information for as-built drawings preparations.

- Coordination with construction team to keep on track about the ongoing construction inline to the latest layout drawing.

- Creation of electrical 3D model parts using Microstation and 3DNaviswork for construction visualization before installation.

- Engineered and accomplished additional heat tracing for the new pipeline and monitoring heat tracing works to ensure the design is applied.

- Preparation and completion of new detailed drawing for heat trace junction box and safety switch used for construction of additional heat trace.

- Ensured that motor solo run is in proper procedure.

- Witnessed electrical commissioning activities and ensures that the required data in checklist are fulfilled.

- Witnessed cable meggering and hi pot test to ensure that the cable insulation is passed before installation and termination.

- Preparation and completion of material take off (MTO) for As-built drawings to avoid excess or shortage of materials.

Chiyoda Technip Joint Venture

Ras Laffan, Qatar

April 2007 ~ December 2008

Position: Electrical Site Supervisor

- Supervision and completion of all electrical works as per installation standard and specification for electrical installation to maintain proper engineering and quality.

- Attended safety talks and initiated the job within the boundary of HSE.

- Preparation and completion of FDC (Field Design Change) with no or minimum cost impact required in the project as per site condition.

- Issued SI (site instruction) to subcontractors, and approves TQ (technical query) from subcontractors in a limited period of time to achieve construction plan schedule and avoid any delayed in electrical part.

- Witnessed energization of lighting panels and its circuits in process area to ensure that the connection and wiring are correct based on wiring diagram.

- Witnessed basic testing and commissioning of electrical panels, meggering and continuity check of cable to ensure that the equipment is working properly and no defects.



Contact this candidate