Post Job Free

Resume

Sign in

Power Plant Designer

Location:
Sharjah, United Arab Emirates
Posted:
May 17, 2021

Contact this candidate

Resume:

Name: MOHAN GOWLIKAR

Nationality: Indian

Marital Status: MARRIED

Passport No: T1124927

Profession: Design / Drafting

Position: Process Designer

Personal Mail Id: admhcs@r.postjobfree.com

Contact No: +971-*********

+91-875*******

Qualifications:

Bachelor of Technology in Mechanical Engineering from Sree Visvesvaraya institute of Technology & Science Affiliated to JNTU University, Hyderabad.

Diploma in Automobile Engineering from SS Government Polytechnic, Zaheerabad.

Software Proficiency:

Smart Plant P&ID 2014 R1 SP5, 2009 SP5, 2007, V4.3

AVEVA P&ID 12.2 SP1.5

AVEVA Diagrams 12.2 SP1

Micro station V8, V8i

AutoCAD (All versions)

Navis works Freedom 2018

Key Work Experience:

I have 14 Years of Core Experience in Process Design & Drafting for Front End Engineering Design (FEED), Basic Engineering Design practice (BEDP), Engineering Procurement Construction (EPC), Project Management Consultant (PMC), Detail Engineering & Pre Commissioning activities related to Oil & gas, Onshore, Offshore, Refineries, Gas Processing, LNG, LPG, Utilities, Power Plant, Pharma Design Drawings.

Following activities which I have undergone are,

Development of P&IDs Using with SPP&ID, AVEVA P&ID, AVEVA Diagrams.

Generating reports (Line List, Instrument list, Equipment list) and Creating symbols in SPPID and AVEVA P&ID.

Worked as SPPID Designer Lead/Super User/Admin Partially, Co-ordinated between Host/satellite offices for Project initiation/DB Sync/Publish Files issues/DB Cleanup & Project DB Handover to Host activities, New Symbols Creation, Standard Templates Creation, Reports customisation for Equipment List, Linelist, Instrument List, Adding Select set Field entry to properties manager, Adding New Fluid codes from Data dictionary Manager Created Display Set Filters. Developing P&IDs from scratch, Raising Queries about new symbols, Equipment labels in Client’s issue log sheet. Worked on Citrix Server.

Have experience in Preparation of Process, Safety Drawings e.g. P&IDs, UFDs, BFDs, PFDs, PSDs, H&MB, DPTDs, MSDs, Overall Process Flow Schemes, Cause and Effect Diagrams, Streamlining Piping 3D Model as per P&IDs, Nozzles Reorientation in P&IDs as per Latest Equipment Data Sheets, Scaled Safety Layouts of Hazardous Area Classification Layout, Fire & Gas Detector Layout, Escape Route and Safety signs Layout, Firefighting Safety Equipment Layout, Passive Fire Protection Layout of Heli, Upper, Lower, Cellar Decks Jacket Walkway, Boat Landing Area, in AutoCAD and

Micro station.

Worked with ADNOC, KNPC, Saudi Aramco, Shell, Total Standard Procedures.

Gulf Water Treatment company LLC.

1.Sludge Dewatering Facility (SDF-II)

Sharjah Municipality Water treatment Plant Project

CAD Engineer from 23Sep2020 to till date

Responsibilities:

Developing P&IDs in Smart Plant P&ID 2014 R1, SP5.

New Symbol creation from Catalogue Manager.

Adding Select set field Properties in Data Dictionary manager.

Creating New templates in smart sketch as per project standards.

Adding new fluid code, insulation codes to select drop down entries.

Customization of Standards Report Templates as per project standards.

Extracting Line, Equipment & Instrument lists from Plant reports.

Soft Checking data base for updated drawings in EDE and Hard copy checking.

Developing PFDs, MSDs in AutoCAD 2018.

Raising Queries about new symbols, Equipment labels, RDB issues in Symbol issue log sheet Provide by Client and applying the queries resolution in Respective P&IDs after getting Response from Client side.

WS Atkins & Partners LLC, Sharjah, UAE.

Member of the SNC Lavalin group

Process Designer

From Jul 2019 to Jun 2020

Projects:

1. USGIF & ZKGPF AS-BUILT Project

ADNOC'S Existing Off-Shore Platforms (Umm-Shaif Gas Injection facilities and Zakum Gas

Processing Facilities) Laser Model Digitalization AS-BUILT Project.

Responsibilities:

Developing USGIF, ZKGPF all platforms wise P&IDs from scratch

Using AVEVA P&ID 12.2 SP1.5.

Creating New symbols as per ADNOC standard legends and symbology.

Hierarchy errors check, Interconnecting OPCs, Errors resolving for completed P&ID’s.

Generating reports for Pipes, Instruments, Equipment Reports and updating Start and End Node Remarks and Resolving errors in all Reports in AVEVA P&ID drawings.

Updating pipes & Pressure gauge sizes unavailable in P&ID files by measuring in Navis works 3D-Model (.NWD) file given by Piping Department.

Updating piping comments in P&IDs after 3D Model Reviews.

2. UMM AL DALKH Project

UMM AL DALKH Early production combined concept and feed Project

Responsibilities:

Updating Legends and P&ID Mark-up of CSP, WHP-15 Platforms in AutoCAD.

Development of well head slot string P&IDs for Production and Test Manifold Headers.

Updating TIE-IN Point numbers between existing and new lines as per Markups.

Updating System wise P&ID Mark-up of Common, Package-1, Package-2 platforms and applying the corresponding changes in Demolition Drawings.

Development and Updating Hazardous Area Classification Layout, Fire & Gas Detector Layout, Escape Route and Safety signs Layout, Firefighting Safety Equipment Layout, Passive Fire Protection Layout, for CSP, WHP-15 Platforms in AutoCAD.

Development and Updating Firefighting P&IDs as per Pipe bore, Number of sprinklers, Elevations isometric report generated from Pipe net.

3. UMM-SHAIF Long-Term Development Plan Project

ADNOC'S Off-Shore Platforms Feed Design competition project

Responsibilities:

Development of well head slot strings P&IDs for Production and Test Manifold Headers.

Updating TIE-IN Point numbers between existing and new lines as per Markups.

Updating System wise P&ID Mark-up of Common, Package-1, Package-2 platforms and applying the corresponding changes in Demolition Drawings.

Development and Updation of Hazardous Area Classification Layout, Fire & Gas Detector Layout, Escape Route and Safety signs Layout, Firefighting and Safety Equipment Layout, Passive Fire Protection Layout, for Package-1 (RP-1,US-12,US-19) and Package-2 (HP-1, HP-2,HP-3) Platforms in AutoCAD.

Development and Updation of Firewater P&IDs as per Pipe bore, number of sprinklers, elevation isometric report generated in Pipe net.

McDermott International Inc., Gurugram.

Process Designer

From Feb 2019 to Jul 2019

Projects:

1.Belbezam Block Off-shore Field Development Project.

Feed and EPC Design and development competition project.

2.HRRL Feed project. (Lummus Novolen Technology GmBH)

HPCL Rajasthan Refinery Limited, Barmar, Rajasthan, INDIA.

980 KTA Polypropylene Plant

3.Formosa ET Sunshine Project. (Total Standards Project)

Feed and EPC Design and development competition project.

Responsibilities:

Developing P&IDs in Smart Plant P&ID 2014 R1, SP5 on Citrix Server.

Extracting Line, Equipment & Instrument lists from Plant reports.

Soft Checking data base for updated drawings in EDE and Hard copy checking.

Developing PFDs, MSDs in AutoCAD 2018.

Raising Queries about new symbols, Equipment labels, RDB issues in Symbol issue log sheet Provide by Client and applying the queries resolution in Respective P&IDs after getting Response from Client side.

MW Global Engineering Services Pvt. Ltd, Hyderabad.

Senior CAD Designer

From Jan 2017 to Jan 2019

Projects:

1.CSL Behring Recombinant facility AG, Switzerland.

2.PLIVA projects Ltd. Vietnam.

3.OCTAPHARMA project, Switzerland.

4.P&G India Ltd.

5.TEVA API Ltd.

Responsibilities:

Developing P&IDs in AVEVA Diagrams 12.2 SP1 as per project legend Symbology.

Updating Client mark-ups & Comments.

Interconnectivity checking of completed P&IDs.

Consistency check, hierarchy check, branch wise check, empty pipe checking of completed P&IDs.

Hard copy checking & updating Check list for each P&ID.

Jacobs Engineering India Pvt. Ltd, Gurgaon.

Process Designer

From May 2016 to Jan 2017

Projects:

1.Pfizer (Drug Substance 2-Grange Castle)

Grange Castle Business Park, Clondalkin, Dublin 22

2.Eli Lilly Kinsale (Pharmaceutical Manufacturing Facility IE42)

IE42 bio-technology manufacturing facility, Country Cork, Ireland.

3.GILEAD Sciences Project

Cupertino Electric biotech electrical system, Foster City, California.

Responsibilities:

Development of P&IDs within given schedule in AutoCAD 2016.

Preparation of blocks for new symbols as per project requirement.

Layer wise Checking of Completed P&IDs as per Project standards.

As Lead Designer Mark-up Distribution among designers and Receive Mark-up from Lead office and Upload completed Drawings in Jacobs Project Information Service Portal.

SK E&C India Pvt. Ltd, Gurgaon

From Jun 2011o Mar 2016

Process Designer

Projects:

1.Clean Fuels Project (Kuwait National Petroleum Company).

Refurbishment of the (MAA & MBB) oil refineries modernize and expand.

Sulphur Recovery Unit – Train 1 & Train 2.

Sour Water treatment unit.

Responsibilities:

Deputed to Head office (south Korea) to Demonstrate SPPID Drafting work using KNPC project standards and initiated SPPID scope of work for Indian office with the approval of Korean Process Department Manager.

Worked as Lead designer and Responsible for EPC PEFS, UEFS Drafting Development work of Sulphur Recovery Unit and Sour Water Treatment unit from ITB Seed PDF files.

Guiding team of Designers to understand Project standards to meet Project Schedule and Resolving their technical queries while drafting all project phases.

Raising Queries about new symbols, Equipment labels and other RDB issues in Client’s issue log sheet and applying the queries/Symbol resolution in Respective P&IDs after getting Response from Client.

Engineering Data Quality check.

Generating Line, Equipment, Pipe, Valve and Instrumentation reports.

Checking database of completed P&IDs.

Supported Process Engineers for Various Instrument Datasheets Updating and PDF Creation work in SP Intools SPI 2009 as per Mark-up.

Generating PFD’S, BFD’S, MSD’S, HMBD’S in AutoCAD 2015.

2.Nghi Son Refinery Project.

Basic Engineering Design and EPC Awarded

(HCU, CDU, KRU, GOHDSU, LPGRU, SMLPGRU)

Responsibilities:

Responsible for IFA P&ID Drafting work for LPG Recovery Unit and Saturated LPG Merox Unit in Smart plant P&ID 2007.

Responsible for IFR and FEED P&ID Drafting work w.r.t ITB Licensor Drawings for LPG Recovery Unit and Saturated LPG Merox unit.

Supported for Production of P&IDs during crunch period of HCU, CDU, GOHDSU, KRU

Creating P&IDs in Drawing Manager.

Checking database of completed P&IDs.

Updating the P&IDs with Process & Instrumentation comments

Drafting and back checking of drawings

Generating PFD’S, BFD’S, MSD’S, HMBD’S in AutoCAD.

3. Jangmoon gas-fired Combined Cycle Power Plant Project.

(1820MW LNG combined cycle power plant in South-Korea).

Responsibilities:

Preparation of PFS & UFS.

Preparation of UEFS & PEFS.

Creating P&IDs in Smart Plant PID 2009 & AutoCAD 2014.

Review/Update of drawings completed by Junior Designers.

4. Jurong Aromatics Complex Project

Jurong Aromatics Corporation PTE Ltd., Singapore.

(Sulphur Recovery Unit and sour water stripper unit)

Responsibilities:

Deputed to Seoul (South Korea Head Office) to finalize all Equipment List, Line list Reports with the approval of process Lead engineer Final project database handover of to client within the given schedule.

Resolved All SPPID Line list, Equipment List mismatches with Process Engineers Lists.

Responsible for AS-BUILT revision drafting work.

Responsible for IFC Rev.2 and Rev.3 while Leading the team of Designers. Resolved their technical queries using my experience helped them to understand Project standards and meet project schedule.

Creating P&IDs in Drawing Manager.

Checking database of completed P&IDs.

Updating the P&IDs with Process & Instrumentation comments.

Drafting and back checking of drawings.

ANEWA Engineering Pvt. Ltd., Hyderabad.

Process Designer

From Feb 2007 to May 2011.

Deputed to following companies from Anewa during my tenure.

Worked for In-House projects during off-Deputation period (Oct 2008 to Dec 2008)

J.RAY McDermott Engineering Services Pvt. Ltd., Chennai.

Process Designer

From Jan 2009 to May 2011

Projects:

1.Zakum Water Injection Upgrade Project (Brown Field)

Abu Dhabi Marine Operations Company's Offshore water injection platform capacity

upgradation project

Responsibilities:

Drafting P&IDs in Smart Plant P&ID 2007, AUTOCAD 2010.

Extracting Line, Equipment & Valve list from Engineering Data Editor.

Development and updating Mark-up of Systems like Condensate, Closed drain, Water Injection Pumps, HP,IP,LP Steam Generator P&IDs, Chemical injection Package Vendor drawing in IFR, IFA, IFD, and As-built Stages of the Project.

Updating TIE-IN Point numbers between existing and new lines as per Markups.

Development and updating firefighting P&IDs.

Nozzles Reorientation in P&IDs as per Latest Equipment Data Sheets, Scaled Safety Layouts for Fire Protection, Fire Hazardous Zones, Fire Proofing, Gas Monitoring Systems, Escape Routes of Jacket Walkway, Boat Landing Area, Top Deck, Main Deck Mezzanine, Cellar Decks of Water injection Platform of Zakum WIP Project.

2.Safaniyah Project (Green Field)

SAUDI ARAMCO offshore platform development EPC Project

Responsibilities:

Drafting P&IDs in Smart Plant P&ID 2007, Microstation V8i.

Checking data base for updated drawings and quality.

Development and Updation of well head slot string P&ID’s of different platforms.

Soft Checking data base for updated drawings in EDE and Hard copy checking.

Developing PFDs, MSDs in Microstation V8i.

Markup updating for Safety layouts, Streamlining Piping 3D Model as per P&IDs,

for 249,250,255,256 platforms of Safaniyah Project in Micro station V8i.

Technip India Pvt. Ltd., Chennai.

Process Designer

From Aug 2007 to Sept 2008

Projects:

1.QATAR GAS 2 ONSHORE PROJECT (QGX-II)

2.RASGAS ONSHORE EXPANSION PROJECT (RGX-II)

3.RAS LAFFAN - RLOC.

4.IKRA PROJECT.

5.YANSAB PROJECT.

6.YEMEN GAS PROJECT.

7.AL-KHALEEJ GAS PROJECT (AKG-II).

Responsibilities:

Development of P&IDs in Smart Plant PID 2007.

P&ID Mark-up Updation received from other offices.

Quality checking of completed p&id's in hard copy and Soft drawing files.

Saipem India Project Services., Chennai.

Process Designer

From Mar 2007 to Jul 2008

Projects:

1.PEARL GTL (Shell Project)

2.Bandar Abbas gas Condensate Refinery Project

Responsibilities:

Drafting P&IDs from scratch as per project standards Using Smart Plant 4.3, AUTOCAD 2007, Micro station V8.

Updating Markups from engineers and Other Departments.

Creating Symbol blocks as per Project Requirements

Language known:

Mother Tongue : Hindi, Spoken – fluent; written – fluent; reading – fluent

English : Spoken – fluent; written – fluent; reading – fluent

Telegu : Spoken – fluent; written – fluent; reading - fluent



Contact this candidate