Post Job Free

Resume

Sign in

Power Plant Aramco

Location:
Pasig, Philippines
Posted:
May 14, 2021

Contact this candidate

Resume:

RESUME OF

JOSE M. ROXAS JR.

Permanent Address :

# ** – A Sampalok St. #15 Blessing Ville, Nagpayong, Pinagbuhatan, Pasig City Phil.

Telephone No: +63(2)84059248

Roaming #: +639*********

+639*********

Email: admed5@r.postjobfree.com

PROFESSIONAL SUMMARY OF EXPERIENCES

Position: Technical Evaluator Mechanical / Sr. QA / QC Mechanical Piping / Welding Inspector & Sr. Piping Engineer (SMP)

Abroad: 13 yrs. Kingdom of Saudi Arabia

: 8 Months in Kazakhstan (ROK)

: 2 yrs. Doha, Qatar

: 1 yr. & 7 Mo. Zambia, Africa

Local : 8 yrs. Construction Field

: 2 yrs. & 9 Mos. Manpower Recruitment Agency

Special Skill: Saudi Aramco Approved QC Inspector

: CSWIP 3.1 # 294135

Well experience in Quality works such as field inspection in high pressure process piping, pressure vessel, column, heat exchanger mechanical static & rotating equipment, tank hot and cold process, plant piping underground and above ground line piping. Also have experience onshore and offshore projects. Gas plant, Power plant, (GOSP) Gas oil separator plant, Petrochemical plant, Polyethylene plant, Gas refinery plant, Mining Plant and Aluminum smelter plant. Offshore experience in maintenance and repair works of jacket structure oil field. Technical experience in discipline and have specific involvement in capital projects for major facilities. Experience with contractors worldwide vendors, in particular those involved in the construction of major facilities of piping system. Engage in (PMT) project management team and (PMC) project management contractor. Familiarized with codes and standards such as : ASME II, ASME V ( Non – destructive Examination such as RT, PT, UT, VT& MPI ) also ( Destructive Test such as Tension Test, Guide bend Test, Impact Test & Hardness Test ) ASME VIII ( Boiler, Pressure Vessel ), ASME IX Welding and Brazing Qualifications, ( ASME B31.1 Power Piping), ASME B31.3 ( Process Piping ), ASME B31.4 ( Pipeline Transportation System for Liquid Hydrocarbons and other Liquids ) ASME B31.8 ( Gas Transmission and Distribution Piping System ), API 1104 Pipelines, AWS D1.1 ( Welding Code Steel Structure ). API 510 – Boiler & Pressure Vessel Code, API – 670 – Mechanical Piping Inspection Code, API – 620 – Construction Rule of Low Pressure Storage Tank, API – 650 – Construction Rule of High Pressure Storage Tank, API – 653 – Storage Tank Repair & Alteration Code, API 598 – Valve Inspection Code.

OBJECTIVE:

To be a part of highly oriented group wherein I can upgrade my knowledge and capabilities in chosen career and responsibility to an impressive and competitive project discipline execution. An able to implement the cost saving as well as the early accomplishment the assign project in awareness in every project budget and identify additional work task billable to client and become competent asset in any company that values quality and hard work requirements and somehow. I can allow sharing that knowledge to enhance and impart to the next generation of specialist in the field of engineering industry.

The objectives of PMC Quality Control Monitoring are to:

1.)Ensure compliance by witnessing a percentage of key inspection and test activities performed by contractor.

2.)Identify any systematic weaknesses in contractor construction.

3.)Provide a measurable program for monitoring quality activities through the use of quality metric, i. e. tracking Nonconformance, tracking weld rejection rates, etc.

4.)Verify that the contractor is monitoring and or performing the in – process / subcontractor Quality Plans and Inspection and testing activities that are defined in the Project Contract including contractor / subcontractor plans and associated procedures.

5.)Provide early identification and root cause determination of systematic quality weaknesses.

6.)Provide a systematic program to verify deliverables are conforming to contract.

7.)Provide rational basis using equipment criticality ratings installation practices and improvement ideas from similar project installation for determining the level of effort to be applied for quality monitoring and redirecting and or adjusting these efforts based on actual QC monitoring results and daily observations.

Training & Seminar:

Course Sponsor Place Date

Work Safely at Heights Marine & Offshore Global Pty Ltd Doha, Qatar 17 Nov. 2008

IIF Safety Training PFD Parson Fluor Daniel LLC Tengiz, Kazakhstan 02 Feb. 2007

QVD Work Process Training PFD Parson Fluor Daniel LLC Tengiz, Kazakhstan 16 Feb. 2007

Complete It Basic User Course PFD Parson Fluor Daniel LLC Tengiz, Kazakhstan 21 Feb. 2007

ERP Emergency Response Plan Saudi Aramco Utmaniyah Gas Plant K.S.A 22 Oct. 1997

Work Permit Receiver Course Saudi Aramco Riyadh Refinery K.S.A 10 Sept.2003

WORK EXPERIENCES:

Company : IMI) Industrial Maintenance International Manpower Agency

Address : 4/F Eagle Bldg. Alejo Aquino St. Along Zobel Roxas St. & Pablo Ocampo St.

Singalong, Malate, Manila

Position : Consultant / Sr. (T/E) Technical Evaluator Mechanical

Duration: November 12, 2018 up to June 1, 2020

Basic Job Description:

As a Technical Evaluator I am responsible to conduct preliminary interview to the applicant based on their technical skilled and experience and evaluate their personal application supported with their CV and Certificate of employment also encoding at (IRIS ) International Recruitment Information System for applicant personal information file, Browsing in work abroad for qualified applicant by category and experience.

Company : East West Placement Center Inc.

Address : RIZZ Bldg. 1059 Metropolitan Ave. Makati City PH 1200

Position : Sr. (T/E) Technical Evaluator Mechanical

Duration: June 27, 2017 to August 1, 2018

Basic Job Description:

As a Technical Evaluator I am responsible to conduct preliminary interview to the applicant based on their technical skilled and experience and evaluate their personal application supported with their CV and Certificate of employment also encoding at (IRIS ) International Recruitment Information System for applicant personal information file, Browsing in work abroad for qualified applicant by category and experience.

Company : Interasia Outsource Inc. / (FQML) First Quantum Mineral Inc.

Project : Kalumbila, Sentinel Mineral Process Plant Trident Mining Project

: Kalumbila, Zambia, Africa

Position : Sr. Piping Engineer

Duration: February 03 to September 29, 2015

Basic Job Description:

A Piping Engineer has the responsibility to deal with the various aspects of piping such as installation, repair and maintenance and replacements. There are a wide range of responsibilities attached to it such as developing better and more efficient piping materials, accessories and systems.

Duties and Responsibilities:

Responsible for site engineering activities at respective areas and provide technical assistance to site supervisor in charge and sub-contractor supervision team. Responsible for piping works at process area, A/G, U/G and pipe racks. Manage subcontractors to ensure all piping works are executed strictly in compliance with project specification standards and HSE plan. Monitored and updated weekly accomplishment reports based on the approved working schedule and productivity target. Monitor construction activities to ensure work efficiency and workmanship to meet project standards and specifications. Preparation of pipe spools drawings for shop fabrication and field erection works indicating shop weld and field weld limits. Developed and directed implementation of methodologies procedures and techniques in the fabrication and installation of piping system. Schedule work activities and manpower requirements to meet completion date. Prepare daily report, weekly report and monthly report.

Company : Interasia Outsource Inc. / (FQML) First Quantum Mineral Inc.

Project : Kansanshi Mining Smelter Project

Solwezi, Zambia, Africa

Position : Sr. QA/QC Mechanical Piping/Welding Inspector (SMP)

Duration : December 14, 2013 to December 15, 2014

Basic Job Description:

Maintain Quality standards by performing site inspection of incoming materials, fabrication, installation and documentation.

Duties and Responsibilities:

Responsible for performing the inspection and check outlined in the document and procedures. Perform visual and dimensional inspection after end preparation and joint fit – up according with latest revision of drawing.

Check and ensure that fit – up is within tolerance prior for welding. Ensure that preheat is carried out and within specified limits. And ensure that welders to be utilized are qualified. Monitor welding parameters during welding and perform visual inspection prior to turn over for NDE. Ensure all visual inspection report and NDE completed prior joint inspection with the client for release to painting. Report any discrepancies to the PMT QC and yard Senior QC inspector and prepare proper documentation.

Company : Velosi Certification LLC / JK Qatar

Project : Shell Pearl GTL ETP Plant

Raslaffan Industrial Complex (RILC) Doha, Qatar

Project : Qatar Aluminum Smelter Plant

Expansion of Qatar Petroleum at Doha Qatar

Position : QC Mechanical Piping Inspector (PMT)

Duration : September 25, 2008 to May 06, 2010

Duties and Responsibilities:

Responsible for performing the inspection and check outlined in the document and procedures. Perform visual and dimensional inspection after end preparation and joint fit – up according with latest revision of drawing.

Check and ensure that fit – up is within tolerance prior for welding. Ensure that preheat is carried out and within specified limits. And ensure that welders to be utilized are qualified. Monitor welding parameters during welding and perform visual inspection prior to turn over for NDE. Ensure all visual inspection report and NDE completed prior joint inspection with the client for release to painting. Report any discrepancies to the PMT QC and yard Senior QC inspector and prepare proper documentation.

Company : PFD – Parson Fluor Daniel International LLC

Tengiz, Atyrau, Kazakhstan (ROK)

Project : SGP / SGI – Second Generation Plant

Sour Gas Injection Project

Tengiz, Kazakhstan

Position : QA / QC Mech’l. Piping Component

Engineer QVD Inspector

Duration : January 29, 2007 to September 27, 2007

Duties and Responsibilities:

Responsible to perform about Quality Verification Documents (QVD).Review and inspection QVD punch list, encode QVD as per required for individual discipline and Incorporate (SSI) Sheet Status Index (CL) Component List at ABC Spreadsheet by using (CIT) Complete IT.

Company : (SISCO) Specialized in Industrial Services Co.

Jubail, K.S.A.

Project : EPC – Eastern Petrochemical Company

Sharq 3rd Expansion Project

Jubail, K. S. A.

Project : (APPC) Advance Polypropylene Company

PDH / PP Project

Jubail, K. S. A.

Project : Snamprogetti / Yanbu Refinery

CCR / LSRN I summarization Project

Saudi Aramco, Yanbu, K. S. A.

Project : SNC LAVALIN / Gulf Farrabi Petrochemical Project

Jubail, K. S. A.

Project : Raymond Saudi Arabia / Safco 4 Project

Saudi Fertilizer Plant

Jubail, K. S. A.

Project : Chiyoda Petrostar Ltd. / Polyethylene Project

(JUPC) Jubail United Petrochemical Company

Jubail K. S. A.

Project : Chiyoda Petrostar Ltd. / SIPC-SMJ Project

Saudi Industrial Petrochemical Co.

Saudi Methanol Jubail

Jubail K. S. A.

Project : Inspection & Testing Turn around shut down Project

Saudi Aramco Riyadh Refinery

Riyadh, K. S. A.

Position : Piping Engineer / QA/QC Supervisor /QA / QC Mech’l. Piping/Welding Field Inspector

(PMT) Project Management Team

Duration : July 03, 2003 to December 26, 2006

Duties and Responsibilities:

Responsible for site engineering activities at respective areas and provide technical assistance to site supervisor in charge and sub-contractor supervision team. Responsible for piping works at process area, A/G, U/G and pipe racks. Manage subcontractors to ensure all piping works are executed strictly in compliance with project specification standards and HSE plan. Monitored and updated weekly accomplishment reports based on the approved working schedule and productivity target. Monitor construction activities to ensure work efficiency and workmanship to meet project standards and specifications. Preparation of pipe spools drawings for shop fabrication and field erection works indicating shop weld and field weld limits. Developed and directed implementation of methodologies procedures and techniques in the fabrication and installation of piping system. Schedule work activities and manpower requirements to meet completion date. Prepare daily report, weekly report and monthly report. Review test packages & supervised and witness NDT activities at site. Perform visual and dimensional inspection after end preparation and joint fit – up according with latest revision of drawing. Check and ensure that fit – up is within tolerance prior for welding. Ensure that preheat is carried out and within specified limits. And ensure that welders to be utilized are qualified. Monitor welding parameters during welding and perform visual inspection prior to turn over for NDE. Ensure all visual inspection report and NDE completed prior joint inspection with the client for release to painting. Maintain quality control function for project including planning of quality control inspections and preparation of reports and controlling corrective action. Associating quality control personal towards areas of activity monitor inspections procedures review inspector’s reports & documentations and verify upon completion of the work that all requirements have been met and that required quality records have been collected and filed. Monitor on day to day case project complaints with the approved quality plan. Following suitability start and approved procedure for the formal control of deviation weirs from the job specification. Review and approved as necessary quality procedures. Oversee the daily content and consistency of subordinate inspector’s daily inspector’s logbook. Controlling corrective actions, Review and approved as necessary, Quality related procedures as follows: Weld Procedure specification, Weld Procedure qualification, Welder qualification Test, NDT Procedure, Cleaning and Pressure Testing procedure, Heat Treatment procedure, Preservation procedure. Oversee the daily content and consistency of subordinate inspector’s daily inspector’s logbook Inspection of rotating and static equipment, pumps, exchanger, vessels and columns. Monitoring start - up and pre-commissioning.

Company: JAL International Ltd.

Alkohbar, K.S.A.

Project : Facilities Maintenance Dept. and Tank

Maintenance and Corrosion Control Dept.

Arabian Oil Co. Ltd. Aramco Gulf Operation Co. Ltd

AL Khafji K.S.A.

Position : QA / QC Mech’l. Field Inspector

Duration : October 06, 1999 to August 22, 2002

Duties and Responsibilities:

Onshore tank repair inspection, sand blasting and painting inspection at onshore/offshore structural equipment and A/G & U/G piping inspection, offshore structure, piping sand blasting and painting inspection. Types of jacket structures are TR-00Tripod Jacket, NR-00 Reinforce Jacket, TS-00 Tender Jacket with Hanger Deck, TS-00 Tender Jacket, and TS-00 Tender Jacket with Second Deck, Cathodic Protection System Inspection Report such as Sacrificial Anode CP/System and ICCP – impress current CP/system with 230mv, Non-destructive test inspection such as RT, UT, DPI, MPI, VT and MFL, Fiber Glass reinforcing plastic inspection, dry fill thickness inspection, Work through joint inspection and final inspection for hand over acceptance.

Company: M. S. Al Suwaidi Est. Contracting

Rahima, Rastanura, K.S.A.

Project : (UGP) Uthmaniyah, Gas Plant

Saudi Aramco

Uthmaniyah, Hofuf, K.S.A.

Project : IBN ZAHR Snamprogetti Project

SADAF Ethylene Expansion Project

Jubail, K.S.A.

MHI Rabigh Power Plant

Position : QA / QC Inspector Piping

Duration : March 23, 1995 to August 18, 1999

Duties and Responsibilities:

Responsible for performing the inspection and check outlined in the document and procedures. Perform visual and dimensional inspection after end preparation and joint fit – up according with latest revision of drawing.

Check and ensure that fit – up is within tolerance prior for welding. Ensure that preheat is carried out and within specified limits. And ensure that welders to be utilized are qualified. Monitor welding parameters during welding and perform visual inspection prior to turn over for NDE. Ensure all visual inspection report and NDE completed prior joint inspection with the client for release to painting. Report any discrepancies to the PMT QC and yard Senior QC inspector and prepare proper documentation.

Company : AG&P Fluor Daniel CA. Company Ltd.

Project : Filipinas Shell Refinery Expansion Project

Tabangao, Batangas City, Philippines

Project : Calaca Power Plant (MHI)

Calaca, Batangas City, Philippines

Project : Shell Interbeton Project / PSPC Batangas City Phil.

Position : Piping/Structural Field Eng’r.

Duration : May 08, 1988 to March 16, 1995

Duties & Responsibilities:

Study plan and fabrication drawings, Ensure safety rules and regulation at site, Make sure all materials withdrawn and deliver to shop is based on plan, Take off materials as per size base on piping plan & structural plan, Requesting materials such as piping & structural for fabrication, Distribution of drawings to the supervisor and Forman, Monitoring daily activities of piping and structural fabrication and erection.

EDUCATION & QUALIFICATION

College / University : (UM) University of Mindanao

: Davao City Philippines

Course : (BSME) Bachelor of Science in Mechanical Engineering

: SY – 1980 - 1985

High School : Davao City High School

: SY – 1976 – 1980

Elementary : Tibungco, Elementary School

: SY – 1970 – 1976

PERSONAL DETAILS:

Age : 58 Years Old

Date of Birth : 26 March 1962

Place of Birth : Calunasan, Calape, Bohol

Nationality : Filipino

Religion : Roman Catholic

Civil Status : Married

Language Known : English, Filipino

I hereby certify that all of the furnished information is true to the best of my knowledge.

JOSE M. ROXAS

Applicant



Contact this candidate