RANILO C. GARCIANO
Objective:
Continue to grow in leadership and knowledge, excel in innovative technology application, interact and share with team members and colleagues and develop world class solution to real world challenges. Personal Strengths:
Have working sense of dedication and responsibility, leadership, time management skills and hardworking Software’s Experienced:
- AutoCAD
- Terramodel pro
- Qinsy
- Microstation V8
Highest Education Attainment:
Bachelor of Science in Architecture in Technological Institute of the Philippines, Quezon City, Philippines Trainings and Seminars Attended :
Course Title Date Conducted
- HUET (Helicopter Underwater Escape Training with EBS December 18, 2018
(OPITO APPROVED COURSE CODE 5095)
- BOSIET (Basic Offshore Safety Induction Emergency Training) October 29 to 31, 2017
(OPITO APPROVED COURSE CODE 5700)
- Basic H2S Training October 34, 2017
(OPITO APPROVED COURSE CODE 9014)
- Basic Training March 31, 2015
- Updating Training for Basic Safety February 12, 205
- Ship Security Awareness Training and Seafarer’s with Designated February 11, 2015 Security Duties
- Refresher Training for Basic Safety November 8, 2019
- DAMP (Airside Principal Contractors) Training in the Contractor January 6, 2014 Induction Course (Brisbane, Australia)
- Reserve Training & Safety (Brisbane, Australia) December 3, 2013
- AUTODESK VIZ2006 January 18, 2006
- AutoCAD 200 with Color Rendering (Level 2) August 17, 2002
- AutoCAD Rel 13 with Color Rendering May 16, 1997 Philippines Address:
Blk 216 Lot 22 Phase 2 Mabuhay City Subd,
Paliparan III Dasmariňas Cavite, Philippines 4114
Mobile #: +63-916-***-****
Skype ID: ranie021375
E-mail: ************@*****.***
- Basic Drafting Course October 29, 1994
Educational Backgrounds:
1997 – 2001
Bachelor of Science in Architecture
Technological Institute of the Philippines
Cubao, Quezon City, Philippines
o Graduated as an average student
o Third place in Best in Thesis
1992 – 1997
Architecture Technology
Technological University of the Philippines
Ayala Blvd., Manila, Philippines
o Graduated as an average student
Professional Work Experiences:
Company: Jan De Nul Group
Department: Survey Department
(August 04,2020 – Sept 09,2020)
Tolmount
U.K.
Rock Dumping Works
Simon Stevin Fall Pipe Vessel
Offshore Offline Surveyor
(April 27, 2020 –August 03,2020)
VCW01-Coastal Virginia Offshore Wind
Virginia, USA
Rock Dumping Works
Adhemar De Saint Venant Vessel
Offshore Offline Surveyor
(July 25, 2019 – January 11, 2020)
North Wester II Project
Belgium
Cable Laying and Trenching Works
Adhemar De Saint Venant Vessel
Offshore Offline Surveyor
(May 20, 2019 – July 09, 2019)
Dredging Maintenance Campaign
2019
PHPA (Port Hedland Port Authority)
Port Hedland, Western Australia
Dredging Works
JU El-Cano TSHD Vessel
Offshore Offline Surveyor
(Jan 05, 2019 – April 16,2019)
Barzan
Ras Laffan, Qatar
Pipeline Works
Office and Field Surveyor
(Sep 11, 2018 – Oct 08, 2018)
Lomond Offshore
Scotland
Rock Dumping Works
Simon Stevin Fall Pipe Vessel
Offshore Offline Surveyor
(July 2, 2018 – Sep 10 2018)
Bechtel Petroleum
Alexandrea, Egypt
Cable Laying Works
Isaac Newton Cable Laying Vessel
Offshore Offline Surveyor
(Oct 22, 2017 – May 29 2018)
132kV&11kV Cable Laying
ADMA (Abu Dhabi Marine Operating
Company)
Abu Dhabi, UAE
Cable Laying Works
Isaac Newton Cable Laying Vessel
Offshore Offline Surveyor
(July 20, 2017 – Sep 9 2017)
Windmill Scour Protection Rock Dumping
DONG Energy
Germany
Rock Dumping Works
Simon Stevin Fall Pipe Vessel
Offshore Offline Surveyor
(Nov 29, 2016 – Feb 22 2017)
Pipe and Slope Protection Rock
Dumping
CPC Corporation
Taiwan
Rock Dumping Works
Joseph Plateau Fall Pipe Vessel
Offshore Offline Surveyor
(Sept 15, 2016 – Sept, 30 2016)
Dredging departure channels in Port
FGUP Rosmorport
Sabetta, Russia
Dredging Works
FM Fernao Magalhaes CSD Vessel
Offshore Offline Surveyor
(Aug 29, 2016 – Sept, 11 2016)
Dredging Maintenance Campaign 2016
PHPA (Port Hedland Port Authority)
Port Hedland, Western Australia
Dredging Works
JU El-Cano TSHD Vessel
Offshore Offline Surveyor
(March 17, 2016 – May 6, 2016)
Wheatstone Secondary Stabilization
Chevron Australia Pty Ltd
Western Australia
Rock Dumping Works
Joseph Plateau Fall Pipe Vessel
Offshore Offline Surveyor
(Oct 29, 2015 – Dec 11, 2015)
Dredging Maintenance Campaign 2015
PHPA (Port Hedland Port Authority)
Port Hedland, Western Australia
Dredging Works
JU El-Cano TSHD Vessel
Offshore Offline Surveyor
(Dec 2, 2013 – Jan 22, 2015)
NPRP (New Parallel Runway Project)
BAC (Brisbane Airport Corp.)
Brisbane, QLD. Australia
Dredging and Reclamation Works
Survey Data Processor /
Topographic Surveyor
(July 25, 2013 – Nov 17, 2013)
Dredging departure channels in Port
PHPA (Port Hedland Port Authority)
Port Hedland, Western Australia
Dredging Works
JU El-Cano TSHD Vessel
Offshore Offline Surveyor
(June 24, 2013 – July 24, 2013)
Trench Dredging for a new pipeline
Chevron Australia Pty Ltd
Western Australia
Dredging Works
Survey Data Processor
(Sept 29, 2012 – May 29, 2013)
Dredging and Breakwater Installation
Qatar Gas Transport Company Ltd.
Ras Laffan, Qatar
Dredging and Reclamation Works
Survey Data Processor
(March 24, 2012 – Sept 28, 2012)
Dredging of 4 new Berth Pocket
BHP Biliton Iron Ore Pty. Ltd
Porthedland, Western Australia
Dredging Works
Survey Data Processor
Responsibilities
Offshore Offline Surveyor
· In-charge of Post Processing Hydrographic Data Using Terramodel and Qinsy.
· Makes Bathymetric Charts/Maps of Hydrographic and survey data.
· Performs Volume Calculation and cross-sections of rock berm design vs. survey data
· Process survey data and generates As-Built charts and other deliverables for client.
· Assist in the installation of survey equipment onboard.
· Conduct SVP onboard to be use for survey.
Survey Data Processor / Surveyor
· Discuss jobs with Survey Chief, Hydro and Topo surveyor’s to make sure all are understood.
· Ensure that the survey data is acquired and log correctly.
· Continuously QA check of the gathered data.
· Post processing, editing and bathymetric charting.
· Prepared Cross Sections, Profile drawings and Volume calculations.
· Hydrographic and Topographic Surveying
· Conduct on-site visiting, inspections and verifications of actual situation. May 8, 2010 – January 12, 2012
Company: Megawide Construction Corporation
Department: Finishing Department
Designation: Finishing Architect
Location: Quezon City, Philippines (near at SM north Edsa) Client: Grass Residences SMDC
Project Description: Construction of 3 Towers 40th Storey Building Responsibilities
· Monitors and evaluates the quality of all finishing works.
· Prepares Bill of Quantities for the project sites.
· Coordinates with suppliers regarding schedule of material deliveries.
· Monitors and evaluates change orders.
· Coordinates plans and designs endorsed by the Head Office.
· Prepares and submits necessary documents and reports required by the Management.
· Performs other management mandated functions.
· Attends weekly meeting with Consultant, General Constructor and Subcontractors regarding operation status
· Supervises a wide variety of construction projects specifically high rise buildings.
· Prepares billings, reports and other necessary documents to properly and timely implement given tasks.
· Ensure proper use of assigned equipments and implement monitoring procedures at the project site to ascertain the maximum use of materials, tools and equipments
· Implement policies in site
May 27, 2003 – April 5, 2009
Company: Abdullah Al-Mis’hal Contracting Est.,.
Department: Building and Grounds
Designation: Site Architect
Location: Jubail Industrial City, Kingdom of Saudi Arabia Client: Saudi Iron & Steel Company (HADEED)
Responsibilities
· Plan and conduct minor modifications to complete detailed drawing sets
· Monitor preparation of technical drawings
· Ensure compliance of construction detail documentation to best practices
· Prepare and review as-built drawings
· Attend site meetings and project meetings and coordinate schedule reviews and submit samples
· Engage in team meetings to resolve project issues and coordinate to schedule adherence of technical issues
· Conduct and document on-site observations and reviews
· Monitor performance of the Contractor/Sub-contractor and identify, raise any quality issues
· Assume responsibility of Architectural works in the project and certify on completion the installation 2001 - 2003
Company: E.H. Sison Engineers Co.
Department: Engineering
Designation: AutoCAD Supervisor
Location: Guernica st., Palanan, Makati City, Philippines Client: DPWH (Department of Public Works and Highway) Philippines Responsibilities
· Previously working on Austrian Assisted Department of Public Works and Highway (DPWH) Bridge Construction and Replacement Project of singly and multi span bridges. Draft and modify site plan, elevation & section, profiles and typical and various details of different structures such as pier, pier abutment, columns, footings, piles & pile caps, footing and other structure based on specified design which will be utilized for constructions. Editing and plotting of such working drawings. Using (Auto Cad Rel.2002)
1997 – 2001
Company: Design Consultants Asia
Department: Design Section
Designation: Senior AutoCAD Designer
Location: 45 Sunburst st., SSS Village, Marikina City Philippines Project: Local Projects from Philippines
Responsibilities
· Assigned in the CAD Production Department of civil, architectural, structural, electrical, 2D & 3D Modeling and other miscellaneous drawings/plans. Editing and plotting of shop drawings and other plan of all engineering discipline. As built drawings. Using (Auto Cad Rel.14, 2000, 2000i & 2002) 1994 – 1997
Company: Geotecnica Corp. The Rock Engineer
Designation: AutoCAD Drafter
Location: Avelino st, cor. Joson st, Xavierville Subd. Loyola Hts., Quezon City Philippines Project: Local Projects from Philippines
Responsibilities
· Manual drafting with computer application (structural detailing, contouring of maps preparing figures, preparing a cross sections drawing based on map contour value & lot plotting). Using (Auto Cad Rel.12, 13 & 14)