SABIR FAIYAZ

QC MECHANICAL ENGINEER (EQUIPMENT)

Mobile No: +91-763**-*****/+91-947*******

Skype ID: sabir1faiyaz

OBJECTIVE:

Intend to build a career with leading corporate of hi-tech environment with committed and dedicated people, which will help me to explore myself fully and realize my potential. I would prefer to work as a key player in challenging and creative environment. QUALIFICATION SUMMARY:

Examination Board/ University Year of Passing Percentage B.Tech(Mechanical) B.N.M.U,Madhepura,Bihar 2007 71.77% Intermediate B.I.E.C.Patna, Bihar 2000 62.56%

Matriculation B.S.E.BPatna,Bihar 1998 71.87%

VOCATIONAL TRAINING:

• Vocational training on “I.O.C.L” at Barauni refinery Barauni (Begusarai, Bihar, India) COLLEGE PROJECT:

• Design of a bottle with the help of CATIA Program. SOFTWARE CREDENTIALS:

• Operating system: - WINDOWS XP, VISTA, WINDOWS 7

• Packages: - MS-Office 2007

OTHER SKILL:

• NDT Level-II

PERSONAL PROFILE:

Father’s Name : Late Abdul Quadir

Mother’s Name : Mrs. Salma Khatoon

Date of Birth : 3

rd

Jan 1983

Gender : Male

Marital Status : Single

Language Known : English, Hindi, Urdu

Nationality : Indian

Permanent Address : C/O:-Shakil Ahmad

Noori Nagar

Khazanchi Hat, Purnea, Bihar-854301

Phone No.+91-645*-******, +91-763*******.

SAP NO. : 70019699 (Wasit Gas Project-Last Project) WORK EXPERIENCE: (Total experience = 9 years)

QC Inspector (Mechanical): (KLNG Import Project, Kuwait from June-2018 to till now in Hyundai Engineer & Co. LTD):

• Vendor Document review for Material Receiving Inspection for Static Equipment and Rotating Equipment as well as Steel Structural Material.

• Conduct Material receiving inspection with Client.

• Inspection for Installation of Static Equipment (Tanks, Vessels, Submergible Combustion Vaporizer and Open Rack Vaporizer) includes Pre-installation Inspection, Orientation, Vertically, Levelness etc.

• Performs hydrostatic test of tank and measurement of pad settlement.

• Inspection for Installation of Rotating Equipment (Pumps, Boil-off gas Compressor, FIN FAN Cooler, Blower & Silencer) includes Pre-installation Inspection, Orientation, Vertically, Levelness etc. and Post Inspection such as orientation, preliminary alignment, final alignment etc.

• Witness the tests, controls and inspections, guarantee inspection status control for parts of the plant within his area of responsibility, authorizing their acceptance at quality control completion, obtain the relevant documentation and ensure the correct implementation of the approved Inspection Test Plan according to Client’s requirements.

• Issues the relevant Quality Records and, when necessary, writes and sends to QC Supervisor non-conformances reports.

• Performs functional checks and mechanical completion checks.

• Responsible for civil work like foundation concrete work based on NS Cement Grout/Epoxy Grout for static/rotating equipment and steel structure.

• Responsible to prepare and update preservation log for all the equipment checked and monitor daily/weekly for easily tracking the status.

• Checks of elevation & levelness of padding plates, position, orientation, anchor bolts, conduits, etc. of steel structure foundation.

• Conduct plumb-ness/verticality, bolt torqueing inspection with client as per approved ITP for steel structure.

• Checking for inspection and testing tools/equipment/instruments are properly calibrated before use.

• Performs punch-listing operations.

• Perform internal walk-through with execution team for static/rotating equipment and steel structure platform/ladder.

• Preparation of final dossier/MC documents to submit to client. QC Inspecor (Mechanical): (Jazan Refinery & Terminal Project, Saudi Aramco, JAZAN, KSA from Dec-2015 to Jan-2017 with Hyundai Arabia Limited, HAL)

• Inspection for Installation of Static Equipment includes Pre-installation Inspection, Orientation, Vertically, Levelness etc.

• Inspection for Installation of Static Equipment include Padding elevation, Position, Orientation, Vertically, Levelness, Platform & Ladder, Vessel Internal work etc. Checking proper installation of platform & ladder, proper elevation, proper bolt torque as per approved drawings and method of statements.

• Inspection and installation of belt tightening of FIN FAN Cooler.

• Resposible for civil work like foundation concrete work based on NS Cement Grout/Epoxy Grout for static/rotating equipment.

• Inspection for installation of internal tray installation work with approved procedure.

• Inspection for installation of compressor and Lube Oil System.

• Responsible for the inspection and preparing report on static/rotating equipment.

• Make sure that have a preservation log for all the equipment checked and monitor daily/weekly for easily tracking the status.

• Receive the RFI from the discipline staff and carry out the inspection of Rotating/Static equipment as per the ITP, identify any discrepancies and generate the NCR.

• Check inspection and testing tools/equipment/instruments are properly calibrated before use.

• Prepare walk through packages and maintain all the inspection records related thereto.

• Witness the receiving inspection of equipment at site and prepare inspection report.

• Responsible for the issuance of internal NCR for discrepancies as per Approved Project Specification or API Standards.

• Witness and monitor the testing of all equipment associated to the project scope.

• Inspection of platform & ladder of the static equipment i.e. columns, drums vessels and heat exchangers.

QC Inspector: (Wasit Gas Project, Saudi Aramco, Khurshaniyah Mar-2013 to Aug-2015 with SK Engineering, Saudi Arabia)

• Inspection for installation of Rotating Equipment include padding Elevation, Position, Orientation, Levelness, Lube Oil Flushing Inspection, Preliminary shaft alignment and Final shaft alignment.

• Inspection for Installation of Static Equipment include Padding elevation, Position, Orientation, Vertically, Levelness, Platform & Ladder, Vessel Internal work, Vessel Box- up etc.

• Rotating equipment reverse/face & rim alignment, soft foot check, motor solo run & run out/ axial float check, piping to RE alignment, flange parallelism/offset & pipe stress.

• Make sure that all static equipment Alignment, leveling, vertically & plumpness, bolt tightening, foundation grouting, chipping & padding.

• Inspection for preservation, soft foot/coupling preliminary alignment, coupling Final alignment with & without pipe connection by face enter/reverse alignment method (RIM

& FACE, TIR Values, DBSE with Dual gauges/inside micrometer) and Levelness checking of Soleplate mounted/Channel mounted vertical pumps, Compressors using master level and Fin Fan coolers alignment, Blade Angle, Tip Clearance etc. Work as a part of a team and ensures the completion of all mechanical activities on site as per clients requirements.

• Responsible for the inspection activities independently and to ensure a timely and efficient inspection and quality company & independent inspectors.

• Co-ordinate with the construction representative on schedule, inspection and expediting control and issues.

• Preparation/Issuing of Non-conformance and corrective action report (NCR & CAR) and review proposed disposition submitted by concerning parties (i.e. vendors) and monitor rectification & closing NCR/CAR items.

• Manage the punch list listing activities issuing/closing for static & rotating equipment prior to client final walk down for pre-commissioning.

• Adhere to the Engineering Procedure, Quality Control Procedures (QCP), Inspection and Test Plans (ITP) with relevant QC forms, Method of Statements (MOS) and risk assessment.

• Inspection and installation of belt tightening of FIN FAN Cooler.

• Witness inspection of installation and alignment of mechanical equipment (Static) i.e. vessel/columns, shell & tube heat exchangers, tanks, drums, lube oil & auxiliary seal system, heaters, as per international codes, standard specifications & practices.

• Supervisor control erection of contractor for the erection/installation of mechanical static

& rotating equipment such as column, drums, exchangers, re-boilers, condenser, volume tank, pumps and compressor, air cooled heat exchanger and other related equipment.

• Responsible for the inspection and preparing report on static/rotating equipment.

• Make sure that have a preservation log for all the equipment checked and monitor daily/weekly for easily tracking the status. Works closely with the related engineering departments to develop connective procedures & analyze results and findings of all inspection activity.

• Receive the RFI from the discipline staff and carry out the inspection of Rotating/Static equipment as per the ITP, identify any discrepancies and generate the NCR.

• Check inspection and testing tools/equipment/instruments are properly calibrated before use. Prepare QC surveillance report found during daily monitoring and or witness inspection.

• Implementation of approval project specifications and standards, API and other related industry codes and standards for the erection/installation of static and rotating equipment.

• Prepare walk through packages and maintain all the inspection records related thereto.

• Monitor the mechanical work for conformance with the provision of contract document and procedure manuals.

• Witness the receiving inspection of equipment at site and prepare inspection report.

• Responsible for the issuance of internal NCR for discrepancies as per Approved Project Specification or API Standards.

• Witness and monitor the testing of all equipment associated to the project scope.

• Inspection of platform & ladder of the static equipment i.e. columns, drums vessels and heat exchangers.

• Checking proper installation of platform & ladder, proper elevation, proper bolt torque as per approved drawings and method of statements.

• Prepare RFI for PID inspection.

QC Inspector (Mechanical): (Saudi Aramco CO2 capture & injection facilities, Hawiyah Jul- 2012 to Mar.2013, Samsung, Saudi Arabia)

• Implementation of QC inspection procedure, planes, ITP & documentation based on project quality and construction procedures.

• Responsible for preservation and protection for installed equipment like rotating and static as per approved Preservation Procedure and checking preservation as per schedule.

• Prior to commencing the equipment installation work, check drawing, Part / tag number and condition of the machined parts.

• Carry out the Pre Alignment and Inspection.

• Checking the location, orientation elevation of foundation for equipment before Installation

• Prior to erection performing inspection activities (inspection before and after installation). Prior to Grouting leveling, elevation and location checking of equipment such as pumps, vassal, heat exchanger etc.

• Inspection of alignment, all pumps with respect to motor using reverse dials indicator/rim and face method.

• Verify the trueness of drive shaft and couplings.

• Monitoring and inspecting the erection works by the contractors and also co-ordination with contractors for the quality.

• Provide solution to contractor technical quarries with respect to project specification.

• Inspection of alignment, all equipment with respect to motor using rim and face method.

• Inspection of alignment by reverse dials indicator method.

• Monitoring and inspecting the erection works by the contractors and also co-ordination with contractors for the quality.

• Preservation checking of Equipment as per preservation schedule.

• Attend weekly meeting and discussion with all discipline clarification on any issue and requirements.

QC Inspector Mechanical: (Sabah-Sarawak Gas Pipeline, Malaysia, Oct. 2008 to Feb. 2012, Punj-llyod)

• Make sure that activities should be done in accordance with standard codes of practice, applicable job specification, quality control procedures (QCP) implementation at job site.

• Attending to the inspections and tests, according to the approved ITP, verifying the inspection results and validating the results.

• Implementation, review, updating and distribution of the Project Quality Plan.

• Implementation of QC inspection procedure, planes, ITP & documentation based on project quality and construction procedures.

• Managing Quality Control functions for the Project including planning of Quality Control inspection and preparation of reports.

• Responsible for preventive, corrective and emergency maintenance program by visual inspection and notification by operation weekly.

• Responsible for preservation and protection for installed equipment like Pump, Motor and Turbine as per approved Preservation Procedure.

• Prior to grouting leveling and elevation checking of static and rotary equipment.

• Alignment of static and rotating equipment, preparation of punch list for the different job and attend the same.

• Visual inspection of Pipeline and preparing punch list after installation and coordinate with the responsible field engineer or supervisor for its completion.

• Supervising, directing and training the personnel engaged in the manufacturing of heavy and precision machines.

• Fabrication of machine structures.

• Machining as per drawings.

QC Inspector (mechanical): (M/S Energetic Engineering, Panipat, Hariyana, Nov. 2007-Jul. 2008)

• Attending to the inspections and tests, according to the approved ITP, verifying the inspection results and validating the results.

• Implementation, review, updating and distribution of the Project Quality Plan.

• Implementation of QC inspection procedure, planes, ITP & documentation based on project quality and construction procedures.

• Responsible for preservation and protection for installed equipment like Pump, Motor and Turbine as per approved Preservation Procedure.

• Installation of Machine and its tools.

• Carrying out quality inspections on jobs.

• Controlling maintenance tools, stores and equipment.

• Monitoring and controlling maintenance costs.

Declaration:

I hereby declare that the above in formations given are true to the best of my knowledge and I bear the responsibility for the correctness of the above maintained particulars, Yours Faithfully,

Place:-

Date: - (SABIR FAIYAZ.)