Post Job Free

Resume

Sign in

Power Plant Boiler

Location:
Surat, Gujarat, India
Posted:
May 13, 2021

Contact this candidate

Resume:

CURRICULUM VITAE

Pavan Kumar Tiwary

Contact: +91-762*******

+919*********

Email:admdhe@r.postjobfree.com

WORK EXPERIENCE

Pursuing M.B.A. In OPERATION MANAGEMENT from WELINGKAR INSTITUTE OF MANAGEMENT, MUMBAI and completed B.Tech in mechanical with @ 7 years of rich & extensive experience in Commissioning and operation in Power /Energy sector. Presently I am associated with STEAG ENERGY SERVICES INDIA Limited 507 MW Power Plant. From October 2016 onwards possess in depth knowledge of Commissioning in gas turbine, steam turbine and Power Project & Generation industry. Previously I worked in PIONEER GAS POWER LIMITED 388 MW (CCPP) Combine Cycle Power Plant in Commissioning department.

Also I worked as BOILER OPERATION ENGINEER and associated with UTILITY POWER TECH LIMITED (Joint Venture of Reliance Infrastructure and NTPC) PROFESSIONAL EXPERIENCE

October 2016 To Till date onwards with STEAG ENERGY SERVICES INDIA Limited 351 MW (CCPP) Combine Cycle Power Plant, Hazira, surat as Operation Engineer Plant Profile : 351 MW Gas Power Plants (Combined Cycle), Surat, Gujarat STEAM TURBINE DETAILS –

MAKE- : BHEL- (111 MW condensing type Condenser cooling with water)

DCS Make- : MAX DNA

STEAM Pressure/temp. -:140KG/CM2, 545 DEG C

NO. Of stages - : 3(HP/IP/LP)

GAS TURBINE DETAILS–

MAKE- : 240 MW GE Frame 9FA, MARK VIE controlled

DCS Make- : MAX DNA

BOILER DETAILS

Boiler type : HRSG, Natural circulation, triple pressure drum Make- : BHEL

STEAM Pressure : High pressure -140KG/CM2

Intermediate pressure- 38KG/CM2

Low pressure: 5KG/CM

Role & Responsibilities:

Steam Turbine 1Nos. 111 MW make BHEL

• Commissioning of steam turbine includes lube oil flushing, hydraulic oil flushing, steam dumping, by pass system commissioning.

• Steam turbine rolling and system erection checked according to PID.

• Condenser leak test carried out.

• Closely monitoring of equipment parameters and raising deficiency if required and also suggesting corrective action in some cases.

• Closely monitoring Gland Shaft seal steam system and vacuum system.

• Closely monitoring the shaft vibration, temperature stress, shaft eccentricity and load controlling activity.

Gas Turbine 1Nos. 240 MW GE Frame 9FA, Mark VIE Operation

• Responsible for safe start-up and shutdown of Gas Turbine Make: GE Model: 9FA

• Water Wash (Online & Offline)

• Smooth Startup of HRSG.

• Maintain Parameter Heat Recovery Steam Generation Boiler..

• Preparation and carrying out the BOILER HYDRO TESTING for HP, IP and LP water and steam cycle circuit

Operation of the Balance of Plant

• Maintain the Power Plant Shift operations and meeting the Power Demand for smooth operation of the Grid.

• Responsible for maintaining/ improving Plant Parameters as per SOP – Heat Rate/Aux. Power/Availability/PLF/Reliability. Responsible for authorizing any logic changes in need as well as ensure timely normalization.

• Responsible for safe Plant Operation – Start up, shut down, Emergency Handling, Troubleshooting etc. Responsible for the safety & security of all the Assets within the Plant premises during shift. Take decisions for operation related issues on real time basis without jeopardizing plant safety

Previous work experience: -

COMPANY: - POINEER GAS POWER LIMITED. Maharashtra as Commissioning Engineer From September 2015 to October 2016

Plant Profile : 388 MW Gas Power Plant (Combined Cycle), District Raigad Maharashtra STEAM TURBINE DETAILS –

MAKE- : SKODA- (127 MW condensing type Condenser

cooling with air)

DCS Make- : HONEYWELL

STEAM Pressure/temp. - :140KG/CM2, 545 DEG C

GTs – 1 no. (261 MW ISO Rating GE Frame 9FA, MARK VIE controlled) Steam Turbine 1Nos. 127 MW make Skoda

• Commissioning of steam turbine includes lube oil flushing, hydraulic oil flushing, steam dumping, by pass system commissioning.

• Steam turbine rolling and system erection checked according to PID.

• Condenser leak test carried out.

Gas Turbine 1Nos. 260 MW GE Frame 9FA, Mark VIE Operation

• Responsible for safe start-up and shutdown of Gas Turbine Make: GE Model: 9FA

• Water Wash

• Smooth Startup of HRSG.

• Maintain Parameter Heat Recovery Steam Generation Boiler.

• Emergency handling of HRSG.

• Maintained daily log book plant condition and noted abnormalities. Followed plant procedure for switching and tagging.

Previous work experience: -

Job Role: - BOILER OPERATION AND MAINTENANCE ENGINEER (2.3 YEAR) Company: - M/S UTILITY POWERTECH LIMITED (JOINT VENTURE OF RELIANCE INFRASTRUCTURE AND NTPC) since JULY 2013 -to SEP-2015 Company configuration

• Capacity: - Power Generation of 302 MW,

Steam production (5 x 220 TPH, 3 x260 TPH and 1 x300 TPH)

• Make :- BHEL, RUSSIAN and ALSTOM

• BOILER TYPE :- PF fired,Natural circulation, Single drum. Job Responsibilities: -

• Work as a Boiler Field and Desk Engineer (operation and maintenance)

• Knowledge of both DCS Desk system and FIELD ..

• Maintaining the plant parameters as per operating /safe range in control room in shifts.

• Ability to do Safe Hydraulic Testing of Boiler

EDUCATIONAL CREDENTIALS

Pursuing: - M.B.A. In OPERATION MANAGEMENT

COLLEGE: - WELINGKAR INSTITUTE OF MANAGEMENT, MUMBAI Qualified :- Bachelor of Technology (Mechanical)

Vel Tech University, Chennai

CGPA : 8.42

Division : First class

Completed 12th

MGM School, Bokaro Steel City

Percentage : 69.4 %

Division : First class

Completed 10th

MGM School, Bokaro Steel City

Percentage : 72.4 %

Division : First class

PASSPORT DETAILS:

• PASSPORT NUMBER: M5286155

• DATE OF EXPIRY : 17/01/2025

Personal Profile: -

Father’s Name: Mr. L Tiwary

Date of Birth: 15th October 1991

Sex: Male

Marital status: Single

Language Known: English & Hindi

Present Address: H. No – 103, sahyog apartment, adajan gam, Adajan Surat, Gujarat

Above Furnished Details Are Authentic to the Best of my knowledge and having satisfied good exposure in all the above zones mentioned..

Date:

[Pavan Kumar Tiwary]

Place: Surat



Contact this candidate