JAMSHED AHMED
PIPING ENGINEER
adma4o@r.postjobfree.com
Objective
Objective
To acquire a technical level position in your reputable organization, where my current knowledge & skills along with learning at the job will facilitate self & organizational development.
experience more than 09yers in oil & gas (onshore & offshore) wellheads, petrochemical and refineries, power plants,
Experience in Mechanical Piping Engineer (Test Pack) and NDT Coordinator, Quality control as Mechanical Piping /Welding Inspector different projects Related with petrochemical, Oil & Gas, (Onshore offshore) Refineries, Liquid Natural Gas LNG, Power Plants in Pakistan, United Arab Emarat and Kingdom of Saudi Arabia.
A comprehensive back ground in Mechanical piping fabrication & NDT, welding techniques, coupled with the duties of an inspector/Quality Controller. Conversant with International codes & standards (ASME-API-ANSI-etc.) plus client specification. Able to motivate & Co-ordinate with other personnel into achieving quality accepted targets & liaise with clients & their representatives plus other department personnel. Projects have included Mechanical piping fabrication and erection, pipeline plant shut downs.
Clients have included major Oil & Gas companies, petrochemical, power industries.
Duties have been carried out included monitoring & Procedure Qualification records, welding procedure specification, welder Qualification test, in process production welding final visual inspection. Preparation and review of traceability of materials & consumables procedures,
QAQC plan and procedures. Witness and monitoring full dimensional survey, Non-Destructive Testing and Hydro testing.
Control of multi-disciplined/national workers (Inspector NDT personnel and work crews)
Documentation, Record Keeping, working with computerized system.
PROFESSIOANAL EXPERIENCE
1. COMPANY : HITACHI
PROJECT : Economic city Oil Refinery Bhaish Gizan EPC-13 (Aramco)
POSITION : Piping Engineer (Test Pack)
DURATION : Augest-2017 To November 2018
RESPONSIBILITIES:
Prepare test package according to test block provided by Client.
Review of all Mechanical piping test packages.
Assigning Test Pack numbering.
Confirm test medium is correct according to the line list and flushing method is correct
Confirm design pressure and test pressure is correct according to line list and within the
allowable pressure for the pipe specification.
Confirm filling points, venting points, and drains are acceptable.
Confirm test boundaries are reasonable - evaluate exclusion zones.
Confirm valves, instruments, etc. that need to be removed are identified.
Confirm pressure gauge and relief valve locations.
Confirm boundary limits of blowing packages are achievable.
Review and approval of all gross air and/or N2He leak testing packages - review includes
following activities.
Confirm leak test medium is correct- air or N2He.
Confirm boundary limits of gross air and /or N2He leak test packages are achievable.
Submit the test package for Client review and approval.
Follow up with Client on test package approval.
Review the test package status once the punch, punch kill activities and release for HT if
punch is cleared for HT.
Update the test package status.
2. COMPANY : BIN QURAYA
PROJECT : ARAMCO
POSITION : NDT COORDINTOR
DURATION : NOV-01-2016 To 9 March 2017
RESPONSIBILITIES:
Planning of NDT activities;
Verification of NDT documentation;
Preparation of project specifications;
Auditing of NDT subcontractors;
Co-ordination of NDT verifications/qualifications;
Co-ordination of inspection activities;
Preparation of close out reports;
Review journals and technical papers for new NDT technology;
walk down inspection with client PID
Raise RFI and close in the QMIS system.
3. COMPANY : HYUNDAI
PROJECT : ATTOCK OIL REFINERY
POSITION : PIPING QA/QC
DURATION : MAY 2015 TO JAN 2016
4. COMPANY : QCON QATAR ENGINEERING .LTD ABU DHABI
PROJECT : ADGAS
POSITION : PIPING WELDING QA/QC (SHUT DOWN)
DURATION : JAN 2015 TO APRIL 2015
5. COMPANY : TOLEDO ELECTROMECHANICAL ABU DAHBI (UAE)
PROJECT : RUWAIS REFINERY (UAE)
POSITION : Mechanical Inspector
DURATION : DEC 2012 TO DEC 2014
6. COMPANY : (EKL)ENGINEERING KINETIC
PROJECT : Ibrahim Fiber Ltd.(IFL)
POSITION : PIPING INSPECTOR
DURATION : OCT 2010 TO Dec 2012
7. COMPANY : (EKL) ENGINEERING KINETIC LTD
PROJECT : NESHPA OIL GAS (3 WELLHEADS)
POSITION : PIPING QC
DURATION : AUG-2009 TO SEP 2010
8. COMPANY : (EKL) ENGINEERING KINETIC LTD
PROJECT : HABCO POWER PLANT NAROWAL
POSITION : PIPING QA/QC
DURATION : JULY 2008 TO JULY 2009
RESPONSIBILITIES:
Daily monitoring of piping erections and installations.
Verification of isometric drawings with respect to P & ID.
Control of non-conformities issuance of punch list.
Witness of alignment orientation and dimensions of installed piping.
Witness of flange faces serration and bolt torqueing inspections
Check that flange ratings bolts & gaskets materials and types are in accordance with drawing.
Perform fit-up inspection of orifice flanges and its taping orientation.
Witnessed of orifice flange weld root flush grinding prior to box-up.
Assure that all joints are exposed for examination during pressure test. Ensure that all piping has high point vents and low point drains installed.
Ensure vents are open when filling and draining lines.
Checking of correct routing of lines as per isometric drawing and AS BUILTING.
Reviewing the history test package regarding the NDTS requirements such as MPI, PT, PMI, HARDNESS testing and also PWHT according to the service classes prior to testing.
Verify all the calibration certificates for the pressure gauges, pressure relief valve, test manifolds, temperature gauges, pressure recorders that involved in the pressure testing.
Verifying the water analysis report before filling the water.
Witnessing HYDRO, PNEUMATIC, SERVICE & VISUAL TESTS.
Witnessing AIR BLOWING and FLUSHING of every line prior to pressure testing.
Witnessing the LAY-UP (DRYNESS) PROCEDURE and measuring the DEW POINT temperature according to the clients specification to ensure a moisture free condition inside the closed system.
Prepare HYDRO TEST PACKAGE LINE CHECK & PUNCH LISTING
Check the piping alignment around pumps, vessels, columns, compressor and other machinery is within acceptable limits.
Inspection of gaskets supports valves prior to line reinstatement acceptance as per the latest drawing.
Final reinstatement inspection for mechanical completion and piping completion to handover commissioning.
Attend weekly meeting.
Conform repairs re-testing and re-inspection in accordance with specifications
Requesting of all NDT requirements to the different service lines prior to releasing of test package.
Checking of correct routing of lines as per isometric drawing and AS BUILTING.
Reviewing the history test package regarding the NDTS requirements such as MPI, PT, PMI, HARDNESS testing and also PWHT according to the service classes prior to testing.
Verify all the calibration certificates for the pressure gauges, pressure relief valve, test manifolds, temperature gauges, pressure recorders that involved in the pressure Testing.
Supporting recruitment activities to source technically competent personnel for the project.
Supporting the QA/QC and Execution team for the preparation and publishing of Project Quality Management Plan.
Identification of bottlenecks, preparation of micro schedules for fabrication planning and their resolution.
Coordinating with service providing departments.
Conducting weekly review meeting with internal department for Job Progress.
Dealing with Technical Queries and Field Engineering.
Coordination with Client and Sub-Contractors.
Planning and distribution of the Manpower for the daily jobs to be carried out.
Fabrication Status with the coordination of Planning Department Coordination with Client
and Sub-Contractors
Planning and distribution of the Manpower for the daily jobs to be carried out.
Fabrication Status with the coordination of Planning Department.
Checking for consistency with P & I.D, Piping Plan and Isometric Drawing as to size, rating
and material.
Responsible for the fabrication and welding of piping and other related activities.
Check Welding Procedure Specification (WPS) & Procedure Qualification Record (PQR).
Witness of Welder Qualification Test (WQT) according to ASME IX.
Inspection of Piping fabrication and erection according to clients specification and construction code.
Checking of workmanship of Piping fabrication and erection.
Control of welding material (Electrode, Filler Wire) backing of Low Hydrogen Electrode.
Monitor welder performance and welding activities to ensure work is being carried out in
Accordance with the approved welding procedure.
Worked as NDT & QA/QC Inspector (RT, & DPT) at following Projects,
Responsible for interpretation of Films, Welding Inspection, Verification of DPT Results,
Thickness Measurement, Execution of Jobs as per Specification and Compliance to Safety
Procedures.
Welding Procedure Specification (WPS) and Procedure Qualification Record (PQR) as per specifications and standards for different materials.
Witnessed the Welder Qualification Test as per ASME SEC IX and review NDT reports.
Daily Co-ordination meeting with Area Planners for work front,
Supervision & Co-ordination with inspection for NDE,
Fabrication of pipe spools & verify as per site before inspection.
Fabrication & Erection of pipe supports.
Inspection of WQT as per ASME IX
Inspection of PQR as per ASME IX
Inspection of Welding, fit up as per drawings
Overall responsible for executing the above-mentioned projects including all
activities like:
To prepare the welding procedure Specification (WPS) with supporting
Documents of Procedure Qualification Record (PQR) including welder Qualification test
(WQT) Reports.
Preparation of QIP s & Inspection check lists.
Liaison with senior management regarding QA/QC matters.
Prepare dossier documents for the final submission to client.
Progress monitoring and reporting to the client.
To prepare the welder qualification record & issuing of welders qualification card.
I have good knowledge and good commands in Excel and Word & Power point, Good
Command Mechanical Auto Cad,
My responsibilities entry data in Mechanical construction,
Check BOQ, & Test Pack,
Work shop Fit-
Inspection to cementing line,
Coordinate to NDT & PWHT
Professional Qualification
DEGREE
INSTITUTE
DAE in Mechanical Engineering
Govt. Ploy Technique Institute Sialkot Punjab Pakistan
Professional Qualification
Level II RT (ASNT)
Level II PT (ASNT)
Level II MT (ASNT)
Level II VT (ASNT)
Health Safety Environment Training (Offshore DAS Island Abu Dhabi UAE,)
ADGAS HYDROGEN SULPHIDE (H2S)
Short courses
Diploma in office management program (3month)
Muslims Hands College of computer science, Pakistan
Certificate in welding Technology (3month)
Cutlery Institute of Pakistan,
Diploma in Mechanical Auto cad (4month)
Cutlery Institute of Pakistan,
Seminars Participations:
(1). Material Selection (one day)
Cutlery Institute of Pakistan
Material attributes
Physical Mechanical, Thermal Electrical, Environmental Economic, etc.
Cutlery Institute of Pakistan.
Main safety use in industries
(Safety shoes, Apron, glasses, Helmet, etc.
Personal Information
Father's Name: Shamus Ud din
Date of Birth: 03 Feb 1982
CNIC Number: 34104-8120741-1
Passport Number: CR1157413
Iqama Number: 240-***-****
Driving License: YES