AHMED KHALIFA
MEP Mechanical Engineer
adm8xy@r.postjobfree.com
El-Gabal Street,Mandra kable
Alex
KEY SKILLS
Teamwork
Problem solving
Initiative
Computer skills
Flexibility
Smart
EXPERIENCE
International company for yarn
Maintenance mechanical engineer
01/01/2012 - 01/01/2015
I am working Maintenance engineer for 2 year in international company for yarn. I have a good knowledge for compressors, pumps, hydraulic circuit, boilers, heat exchanger, water treatment, pneumatic Circuit and firefighting design and installation
Global Energy
02/2015-10/2017
I worked in Global Energy Construction Geeco, Alexandria, Egypt Projects worked in it with GLOBAL ENERGY
Technical office engineer
12/2016 - 01/2015
Project Name :West-town infra-structure Package
Position scope of work
Submit shop drawing for the infra-structure Networks Submit material submittal for approval
Submit RFI and RFP for the Technical issues
Review for the design Drawing and its calculation
Submit As built,Qs and invoices
Submit All variation orders with its breakdown for approval Technical office Manger
01/2016-06/2016
Project Name :SODIC WESTOWN BLOCK 46 MEP+infra-structure Package
Position scope of work
Submitshop drawing for the infra-structure Networks+MEP drawing for -1 Building
Submitmaterialsubmittal for approval -2
SubmitProcurementplan for the project -3
SubmitRFIand RFP for the Technical issues -4
Reviewforthe design Drawing and its calculation -5 SubmitAsbuilt,Qs and invoices -6
SubmitAllvariation orders with its breakdown for approval -7 Insurethat all submitted material or drawing matched with the project -8 Specs and codes
EXPERIENCE
Construction Manger
07/2016-9/2016
Project Name :Marasi Blanka 85
Position scope of work
Starting up the Project and assure that all resources are availably Assure that all activities done according to project specification and codes Assure that all activities done according to time schedule and with high quality and low cost
Follow up Project time schedule,Procurement plane and Project cash flow Assure that my team work working harmony and Solve for any obstetrical may be face them
Coordination between my teamwork (constructions,technical office,quality Preparing for Project closing and commissioning stage Project Manger
09/2016-10/2017
Project Name :South Helwan Power plant( HVAC Package Position scope of work
Starting up the Project and assure that all resources are availably Assure that all activities done according to project specification and codes Assure that all activities done according to time schedule and with high quality and low cost
Follow up Project time schedule,Procurement plane and Project cash flow Assure that my team work working harmony and Solve for any obstetrical may be face them
Coordination between my teamwork (constructions,technical office,quality Preparing for Project closing and commissioning stage TAKWEEN ENGINEERING FIRM COMPANY
11/201*-**-****
Project Name :BO-ISLANDS(SIDI ABEDEL
RAHMAN-INFRASTURCURE PACKAGE
Technical office Manger
Position scope of work
Submit shop drawing for the infra-structure Networks+MEP drawing for Building
Submit material submittal for approval
Submit Procurement plan for the project
Submit RFI and RFP for the Technical issues
Review for the design Drawing and its cal
Submit As built,Qs and invoices
Submit All variation orders with its breakdown for approval Insure that all submitted material or drawing matched with the project Specs and codes
TECHNICAL SKILLS
. Rivet (MEP)
. Hap
. Elite -Firefighting
. Elite- HVAC
. Mat lab
. Auto Cad -2D&3D
. ICD
. Excel for engineering
. Inventor
. Primavera
Ms project
Consolidated Contractor Company offshore CCC
Till-now 01/2019
Project Name :OLD CITY -NEW ALAMINE
Senior Quality Control Engineer
Position scope of work
Assure that all activities done according to project specification and codes Submit inspection and testing plane for all MEP systems Submit Method statement for all MEP systems
Inspection for all materials delevered to site according to material approval submittal
Inspection for all activates done by the constriction team before submit inspection request to the consultant
Assure that all activities have been installed according to project specs Follow and applied all project proceeder's and project quality plane Preparing for commissioning stage
EDUCATION
Mechanical Engineering, Alexandria University
Grade: Good
Graduation Project :windmill
Project attained : Excellent
PROJECTS
Projects that I worked in it
Project Name :West-town infra-structure Package
Position: Technical office engineer
Owner : SODIC
Main contractor:HASSAN ALLAM SONS
Consultant : AHMED ABED ELWARS
Budget: 20 Million L.E
project Name :BLOCK 46 MEP + infra-structure Package Position: Technical office Manger
Owner : SODIC
Main contractor:GLOBAL ENERGY
Consultant : EL-AMAR
Budget: 44 Million L.E
project Name :Marasi Blanka infra-structure Package Position: Contraction Manger
Owner : EMAR
Main contractor:HASSAN ALLAM SONS
Sub contractor: GLOBAL ENERGY
Consultant : MOHARM BAKHOM
Budget: 25 Million L.E
project Name :South Helwan Power plant -HVAC Package Position: Project Manger
Owner : Ministry of Electricity
Main contractor:CCC
Sub contractor: GLOBAL ENERGY
Consultant : PEGESCO
Budget: 15 Million L.E
PROJECTS
Project Name :Bo-Island
Position: Technical office Manger
Owner : MAXIM
Main contractor:TAKWEEN ENGINEERING FIRM
Consultant : RMC
Budget: 50 Million L.E
project Name :OLD CITY-NEW ALAMIN
PERSONAL PROFILE
Date of Birth : 10/02/1988
Marital Status
Nationality
: Married
: Egyptian
Known Languages : English, Arabic
Position: Senior QC-Engineer
Owner : Ministry of housing,utilities,urban communities Main contractor:CCC
Consultant : ECG
Budget: 3000 Million L.E
project Name : South Region control center (SRCC)
Position: Senior Mechanical Engineer
Owner : Ministry of electricity (National Grid -Saudia arabia) Main contractor:Musfir Al-Abeedi Est.
Consultant : East Consulting Engineering Center
Budget: 130 Million SAR