Post Job Free

Resume

Sign in

Engineering Corporation Water Authority

Location:
Chennai, Tamil Nadu, India
Salary:
18000+Other Benefits
Posted:
June 19, 2021

Contact this candidate

Resume:

Om

OM CURRICULAM Om VITAE Rathinavel Arumugam

* * * * *

Result oriented professional having 25 years of rich experience in Quality Assurance / Quality Control of manufacturing in Oil & Gas, Offshore, API Monograms, Energy, Water Treatment Plants & Construction field. Name : Rathinavel Arumugam

Date of birth/Age : 15.06.1976 / 45 years

Nationality : Indian

Marital status & children : Married

Language proficiency : English & Indian languages Hindi, Tamil Driving License details : Holding valid UAE car driving license Computer literacy : Proficient in Microsoft Office package, Auto-Cad, SAP PP Module Academic Qualification:

Mechanical Engineering ( 3 years Diploma ) with 82% score from State (Technical) Board of India. Professional Qualifications / Certifications possessed: LEAN SIX SIGMA Green Belt Certification from KPMG India – Jan 2021 ISO 9001-2015 Lead Auditor course certificate from TUV Rheinland – Mar’2021 PMP–Project Management Professional training – Cambridge Education – June 2018

IMS (ISO 9001-2015, ISO 14001-2015, OHSAS 18001-2007 ) Internal Auditor course certificate from TUV NORD – May’2018

QMS (ISO 9001-2015) Internal Auditor course certificate from TUV NORD – Apr’2017 QUALITY MANAGEMENT SYSTEMS FOUNDATION TRAINING COURSE BASED ON ISO 9001:2015 STANDARD - Feb’2016

ESSENTIAL SKILS FOR MANAGERS – LEVEL 2 - Dec’2017

CERTIFIED WELDING INSPECTOR (CSWIP) CERTIFICATE FROM TWI, UK - Sep’2009 Om

OM CURRICULAM Om VITAE Rathinavel Arumugam

2 P a g e

ATTENDED TRAINING FOR ASME BPVC CODE SECTION I, II, V, VIII Div.1 & 2, IX, NBIC Vol3 CHANGES AS PER EDITION 2017 – Nov’2017

ATTENDED TRAINING FOR ASME MATERIAL REQUIREMENTS – Feb’2016 ATTENDED TRAINING FOR ASME BPVC CODE SECTION VIII DIV.1 & SECTION IX – Mar’2011 ATTENDED TRAINING FOR PRESSURE EQUIPMENT DIRECTIVE 97 / 23 / EC - Jan’2011 ASNT Level II Certificate in NDT methods PT, MT, RT & VT from ASNT - Oct’2006 Professional Trainings Attended :

ATTENDED TRAINING FOR ASME BPVC CODE SECTION I, II, V, VIII Div.1 & 2, IX, NBIC Vol3 CHANGES AS PER EDITION 2017 – Nov’2017

ATTENDED TRAINING FOR ASME MATERIAL REQUIREMENTS – Feb’2016 ATTENDED TRAINING FOR ASME BPVC CODE SECTION VIII DIV.1 & SECTION IX – Mar’2011 ATTENDED TRAINING FOR PRESSURE EQUIPMENT DIRECTIVE 97 / 23 / EC - Jan’2011 Professional Trainings Attended :

Note: Marks/Logos appearing above are incorporated only with an intention to correctly identify the respective professional bodies/ Organizations, which offered the professional certifications as stated herein. Specialization

PMP, ASME, National Board, API Certifications(6A,6D,16A), AWS, DM approved PEB Steel. Through knowledge of supporting functions in Estimation, Production & Projects.

OVERALL WORK EXPERIENCE SUMMARY:

Around 25 Years of experience in Manufacturing/Quality Assurance/Quality Control/HSE/Production fields of petrochemical, oil, gas, refinery, fertilizer and cement industries.

Over 10 years of experience as a Senior/Executive Manager in ASME / ISO 9000 QMS Documentation, implementation and Audits.

Successfully managed several ASME, NBBI, API Certification audits and Audits for ISO 9001 QMS Management System certification audits by ASME / LRQA / TUV RHEINLAND / DNV / ABS certification bodies.

Thorough familiarity in the manufacturing and QA/QC of ASME Code Stamps / NBBI (NBIC NB-23) repair works, MDR preparation and their registration procedures.

Possess adequate knowledge of fabrication & welding of carbon steel, Martensitic/Austenitic stainless steels, Super Duplex/ Duplex Stainless Steels and various nickel alloys and high strength (Oilfield) engineering materials (AISI 4130/ AISI 8630/ AISI 4140/L80/4145 etc.,)

Possess good knowledge of selecting appropriate welding processes (SMAW/GTAW/SAW/GMAW), filler metals & WPS/PQR & Welder performance qualifications. Thoroughly familiar in the preparation and qualification of welding procedures (WPS/PQR), Welder/Welding Operator qualifications to ASME, API & NACE MR 0175 requirements

Possess good knowledge of NDT methods for welding testing. Om

OM CURRICULAM Om VITAE Rathinavel Arumugam

3 P a g e

CAREER SUMMARY: (Chronological)

China State Construction

Engineering Corporation (CSCEC)

Employer

Period : Jan 2019 – Till Date

Position : Project QA/QC Manager

Project : ITS 2020 Package 1B

China state Construction Engg Corpn had been awarded prestigious project from RTA for ITS2020, Intelligent Traffic Systems - DYNAMIC MESSAGE SIGNS, throughout Dubai.

Handling position of QAQC Manager and responsible for the achievement of ISO 9001:2008 Certifications & surveillance & renewal audits.

Preparation of Project Quality Plan and submission for Consultant approval.

Involved in selection of Suppliers / Subcontractors and submission of Prequalification for Consultant / RTA approval.

Submission of Material submittals & Method statements for Consultant / RTA approval.

Conduct Site inspections / witnessing welding inspections / NDT test with Consultant at Site / Shop locations.

Conducting Training about PQP, Method statements and special requirements to Construction teams.

Preparation of Internal Audit plan and auditing as per plan at Site and Subcontractors locations. Past Employments: (Chronological)

GULF ENGINEEING INDUSTRY

Employer RAS AL KHOR INDUSTRIAL AREA 1, DUBAI – UAE

Period : Oct 2010 – Dec 2018

Position : Head ( QA/QC)

Established “Gulf Engineering Industry” Dubai facility and managed it as the Head of Quality in Manufacture of Pressure Vessels as per ASME Sec VIII Div.1 and Boiler equipment as per Section I, Piping as per ASME B31.1, 31.3 and repair of Pressure vessels as per National Board “R”.

Gulf Engineering Industry manufacture of oilfield equipment including Wellhead, Christmas Tree and Drill through equipment, Rotary Drill stem elements, Rotary Shouldered Connections, Choke & Kill systems including manifolds and related piping, Standpipe and Cement manifolds, Control systems for drilling well control equipment & Diverter equipment as per relevant API Product specifications

Involved in strategic planning, recruitments, procurement of Capital Equipment/Machinery and set-up a fully equipped Stuctural steel services workshop in Dubai.

Management Representative & responsible for the achievement of ISO 9001:2008 Certifications & surveillance & renewal audits.

ASME & NBBI Certifications: Individually managed ASME Joint Review/Audit and NBBI verification audit to achieve ASME U, & S and NBBI “R” certifications. Responsibilities include preparation of company’s Quality Control Program Manual in accordance with relevant ASME Boiler & Pressure Vessel Codes. Preparation of NDE Written Practice and procedures for PT, MT & VT NDE methods, Mock-Up vessel QA/QC documents such as ITP, WPS, Weld Map, PWHT Procedures etc.,

MAJOR PROJECTS

Project Name : Hot Rolled / PEB Structures for Industrial sheds / Ware houses in Dubai, Sharjah, Om

OM CURRICULAM Om VITAE Rathinavel Arumugam

4 P a g e

Abudhabi.

Project Name : TK-2861 / Sea Water Desalination & Demineralized Water Treatment Centre - EMAL expansion

( 2017-2018 ) Multimedia Filter Vessels ( 4 nos ) with Skids package, CS Piping, GRP Piping. Project Name : SIBA FIELD DEVELOPMENT PROJECT – PETROJET, IRAQ Dual Media filter Vessels ( 2 nos ) with skid package ( 2016 )

Project Name : 2501121 - NAG LTFD Phase 1Project To Install 500 MMSCFD GDU – Tatweer Petroleum, Bahrain, ( 6 nos. ), Client : Petrofac, Chemical Injection Test Packages ( 2016 ) Poject Name : Aluminium jobs & Structurals for DUBAL / EMAL Project Name : Large Scale Thermal Pilot Project – Kuwait Oil Company (2015-2016) – 3 Nos. Closed Drain Vessel, 5 Nos. HP FLARE KO Drums, 1 No. Condensate Tank with CS Piping. Project Name : Green Sand Filter Vessels ( 2 nos ) for PEPSI, Egypt [ 2014 ] Project Name : Dual Media Filter Vessels ( 6 nos ) for Alpha Technical, Hamriyah [ 2014 ] Project Name : Piping fabrication for Metito Overseas Ltd, 35000 inch dia. [ 2013 ] Project Name : 52 Drill Pipe Bins for Weatherford [ 2012 ] Project Name : GPS CHEM OIL, Fujairah Plant - 1600 MT Pipe Rack Structures (2011) Project Name : Repair & Replacement of Gas Turbine Piping for DUBAL [ 2011 ] Project Name : FEWA, Al Jawahara new plant [ 2011 ], 14 nos. Dual Media Filter Vessels with Skids Structures, CS Piping, GRP Piping.

Project Name : SS Paddle Drier, 12 nos [ U-stamp ] for Komline Sanderson,US [ 2010-2011 ] Past Employments: (Chronological)

Harsha Precision Middle East FZC

Ras Al Khaimah, UAE

Positions Held

: Feb 2008 – Dec2009, Sr.Engineer ( QA/QC)

: Jan 2010 – Sep2010, Dy.Manager ( QA/QC)

Established “Harsha Precision Middle East” Ras Al Khiamah facility and managed it as the Sr.Engineer (QA/QC) & dy.Manager (QA/QC) Quality in Manufacture of Pressure Vessels as per ASME Sec VIII Div.1 and Boiler equipment as per Section I, Piping as per ASME B31.1, 31.3.

Responsible or the achievement of ISO 9001:2008 Certifications.

ASME & NBBI Certifications: Individually managed ASME Joint Review/Audit and NBBI verification audit to achieve Petron’s ASME U & S and NBBI “R” certifications / Stamps. Responsibilities include preparation of Co’s Quality Control Program Manual in accordance with relevant ASME Boiler & Pressure Vessel Codes. Preparation of NDE Written Practice and procedures for PT, MT & VT NDE methods, Mock-Up vessel QA/QC documents such as ITP, WPS, Weld Map, PWHT Procedures etc.,

MAJOR PROJECTS

• 1200 MT Equipment Structures fabrication & erection for Guardian RAK, Glass plant ( 2007- 2008 )

• 2800 MT Building & Equipment Structures fabrication & erection for Emirates Float Glass, Abudhabi

( 2008-2009 )

• 2650 MT Building & Equipment Structures fabrication & erection for IANUA, Eqypt ( 2009-2010 )

• CS Piping prefabrication 24000 inch dia. ( Project : TDS-2000-SEMI SUBMERSIBLE DRILLING RIG-002) for Gulf Piping Company, Abudhabi [ 2008 ]

• Pressure vessels U-Stamp ( 6 Bottles ) for Gas Services International, Jabel Ali [ 2008 ]

• SS Piping Fabrication & Erection for Arc International, Ras Al Khaimah [ 2008-2010 ]

• Tertiary Structures & Erection for Emirates Float Glass Company, Abudhabi [ 2008 ]

• SOLIDS CONTROL SYSTEM ( Mud Tank ) for Scomic Oil Tools, Jabel Ali [ 2008 ]

• RDA Tank for Metito, Sharjah [ 2008-2009 ]

• SS Piping Fabrication for CBI – Al Ruwais, UAE [ 2008-2009 ].

• CS / SS Pressure vessels & Storage tanks for CH2M HILL – KALBA site – SEWA [ 2008 ]

• Pipe Rack Structures for CH2M HILL – KALBA site – SEWA [ 2008 ]

• Compressor Skid, 2 nos. ( 36MT/skid) for GSI – MAERSK OIL QATAR [ 2008 ]

• Pressure Vessels, U-Stamp ( 12 Nos) for GSI - MAERSK OIL QATAR [ 2008 ] Employer

Om

OM CURRICULAM Om VITAE Rathinavel Arumugam

5 P a g e

• Storage Tanks ( 6 Nos ) for DODSAL [ 2008 ]

• Piping with Erection for GSI - MAERSK OIL QATAR [ 2008 ]

• Pressure Vessels U-Stamp (2 Nos) for Gas Compressor – HYDRO LINK FZE [ 2008 ]

• Structures for 23,000 M Propylene Storage Tank, BOROUGE @ Project,- CBI EASTERN ANSTALT, Al Ruwais [ 2008-2009 ]

MAJOR CLIENTS : EMIRATES FLOAT GLASS LLC, GAS SERVISES INTERNATIONAL, ARC INTERNATIONAL, GULF PIPING COMPANY, METITO, CBI EASTERN ANSTALT, SCOMIC OIL TOOLS, CH2M HILL, DODSAL, MAERSK OIL QATAR, HYDROLINK FZE. Past Employments: (Chronological)

GULF ENGINEEING INDUSTRY

Ras Al Khor Industrial Area, Dubai,UAE

Period : Oct’2005 – Feb’2008

Role & Responsibilities

• Incoming Raw material inspection as per PO & Project specifications and Review MTC for compliance.

• Fit-up Inspection, Weld Visual Inspection and Final Inspection of Fabrication items.

• Stage inspection of Pressure vessels, storage tanks, piping as per ITP.

• Maintaining Material Traceability throughout the fabrication.

• Co-ordination with Authorized Inspectors, Third Part Inspection and Clients.

• Blasting & Painting Inspection of Vessels & Structures.

• Maintaining records & Calibration of Instruments.

• Route cause analyze for the NCRs, CARs raised by clients / TPIs / External Auditors.

• Providing support to Marketing, Estimation, Planning, Procurement & Production . MAJOR PROJECTS

• Aluminium jobs & Structures for DUBAL

• Machined Items For DUBAL, BELLELI, QUALITY INTERNATIONAL,GULFMETAL FOUNDRY

• Structures For Dubai International Airport Expansion Project ( PHASE II ) [2005 ]

• Structures for Gulf cement factory-expansion project. [ 2005 ]

• SS Pressure vessels & Storage tanks for Al Khafji Joint Operations KGOC/AGOC,Saudi Arabia [ 2005 ]

• LPG Storage Pressure vessels ( U-STAMP ) for EMARAT [ 2006 ]

• SPUD CAN Structure with Piping for QGM – Thule Drilling Project [ 2006 ]

• Offshore Structures for LAMPRELL - Kashagan / Tapti project [ 2006 ]

• GIMBOA Top side Modules / FRADE Top Side Modules project [ 2007 ]

• Pressure vessels (U-Stamp) with SS Piping for CHRIST KENNICOTT - IBN ZAHR PP III project, Saudi Arabia [ 2007 ]

• Pressure vessels for SAIPEM - GIMBOA Project [ 2007 ]

• CS / SS Pressure vessels & Storage tanks for CH2M HILL - Sharjah Electricity & Water Authority [ 2007 ]

• Lube Oil Run Down Tanks (U-Stamp) for LAMPRELL – FRADE FPSO Topside Modules [ 2007 ]

• Offshore Structures for LAMPRELL - GIMBOA Top side Modules / FRADE Top Side Modules project [ 2007 ]

• SS Piping Fabrication & Erection for DEWA –Expansion of M701D GAS TURBINE. MAJOR CLIENTS : DUBAL, DEWA, IHI, LAMPRELL, EPC, GALFAR, ARAMCO, CHRIST WATER TECH, WTD, EMARAT, ARABIAN BEMCO, GAMUDA, SAIPEM, CH2M HILL, PAUL FILTER Employer

Om

OM CURRICULAM Om VITAE Rathinavel Arumugam

6 P a g e

Past Employments: (Chronological)

Employer : Technofab Ltd, Chennai, India.

Designation : Engineer (QC) Period : Mar’2004 - Sep ’2005 Job Responsibilities :

Inspection of Raw material for various jobs, Stage inspection of Wind Mill Tower equipments, accessories, structures, Storage Tanks, cable trays, and coordinating with Third party like TPL, BVQI. Major Clients : L&T, SUZLON Energy Ltd, NEPC Mecon, NEG Mecon, etc… Employer : Binny Engineering Ltd, Chennai, India.

Position held : Junior Engineer / Engineer ( QC )

Period : Feb’95 - Feb ’2004

Job Responsibilities :

Inspection of Raw material for various jobs, Stage inspection of Sugar mill equipments, accessories, structures, Machine shop and Modern rice mill machineries.

Major Clients : TASCO, S.V.Sugars, Brakes India, GMR, Southern Railway, L&T etc… Sign : Rathinavel Arumugam

Mobile Number : +91-730**-*****

Mail : adm8nl@r.postjobfree.com & adm8nl@r.postjobfree.com



Contact this candidate