Post Job Free
Sign in

Contact Details Solid Works

Location:
Chennai, Tamil Nadu, India
Posted:
June 18, 2021

Contact this candidate

Resume:

RESUME

NAME: S.VETRIMURUGAN

Contact Details: Cell:883-***-****. 965-***-****

Mail:adm7is@r.postjobfree.com Communication Address Objective

S.Vetrimurugan To secure challenging assignments as a professional in 3/488 Segudanviduthi areas trained and experience Gained in. Where I can Kadampatti (PO) grow along with the organization with great responsibility. Karambakkudi (TK)

Pudukkottai (DT) Education Pincode -622 302

10th Government higher secondary school regunathapuram (2011-2012) 52 Percentage

12th Government higher secondary school

Personal Data Thiruvonam (2013-2014) 75 Percentage

Father Name : V.Selvarasu DME sri Subhabharathi Polytechnic college

DOB : 06.06.1997 Kallangudi, Alangudi (2014-2017) 68 Percentage Gender : Male

Nationality : Indian Experience

Languages known : English 1) Rane Engine Valve Ltd

Tamil Plant -3 P.B.No.4, Redhills Road, Madhavaram, Marital Status : Un Married Ponneri-601204 (Tamil Nadu, India)

Designation : Neem training

Duration : 20.05.2017 to 15.11.2017

Department : Stores & Purchase (Material) Company Profile : Engine Valves, Guides and Tappets

2)Ucal Fuel System Ltd

Plant -VI A3/43, A4, A5, CMDA Industrial Complex, Maraimalai Nagar-603209, Kanchipuram(DT) (Tamil Nadu, India)

Designation : Apprentice training

Duration : 18.11.2017 to 31.10.2018

Department : Assembly (Oil pump) Company Profile : Carbaretors, P15 case, Oil Pumps, endhousing, Pinions.vaccum pump

3)Amalgamation Valeo Clutch Private Ltd

Plot. P9, Sipcot Industrial Park Vaipur Village, Orgadam, Kanchipuram(DT), (Tamil Nadu, India). 602215.

Designation : Operator Training

Duration : 14.11.2018 to 16.12.2019

Department : Tractor & Truck Line Company Profile : Clutch, Disc, Dual Mass Flywheel

4)Hyundai motor india ltd plot no H-1, sipcot industrial park, irungattukottai, Sriperumbudur (Tk) Kanchipuram (Dt), Tamilnadu 602117

Designation. : Diploma Apprentice

Duration . : 24.01.2020 to 10.04.2021

Department. : Body shop & Assembly shop

company profile : car manufacturing i20,venue, kona, Elantra,creta,Tucson

Material Receipts :

Daily Line Start Time check the line material location.

Preparation of Good receipt note (GRN) on daily basis of all direct and indirect material. received and circulation the copy of information to purchase section and department concerned.

Preparation of goods inspection report and to offering material received for inspection to concerned department person.

Ensure updating of daily transaction.

Inventory Management:

Adoption of various inventory control techniques wise ABC analysis, vital essential- described for effective inventory control.

Finalization of inventory levels wise maximum, recorder, minimum and buffer levels for all the production related consumable, keeping in view monthly, weekly consumption and lead time for procurement

Feedback to purchasing for necessary procurement action so as to avoid stock – outs.

Maintenance of Records:

Daily receipt of material register

Daily stock report

Shift first time all of the machines fill the check sheet

Daily inspection report update

Daily Check press hydraulic oil Level

Daily check the Line air pressure gauge

Machine up normal condition mean update on the QRAP book

Table rotation and Ram up town conditions

Daily check the marking sequencers pannel

Machine running first time magnetic flux condition

Photo guard lights on the condition

Balancing machine drill bit change and betal condition check

EOL machine auto to manual change recalibration

Shift end time cleaning machine place and machine

Daily Airtool noise or Lubricant oil level check.

Daily spot gun tip change and water level air pressure power level Daily Check.

Daily Shift start to end times and sealer,drum level check and change.

Daily tip 3 bodies one time tip dreesing and 5 bodies one time drive check.

Daily Checking the sealer Gun handling and sealer level.

Shift start time fuel level manual or Auto level spec confirmation.

Key Skill:

5S activity

Kosu book mean by hourly production update book

First job and last job check update on SIR book

Balancing machine change the model and drill bit

First job check dimensions and recalibration

Production Qty mentioned systematic SF and OE card printing

Auto cad solid works CAD

Daily updates on the 5 minutes communications book

CNC machine operating and programming

Parts identification on the QR scanner printing

Parts identify by part no model sticker

Robot operation time stop time Robot Reset on to home position

Jig spot misses hot declamp time pc reset to jig declamped.

main buck bodies stop on time pc program reset to home position to on.

daily check the sensor work condition

Mat switch properly working confirmation.

daily shift start time production counting reset to on.

Computer Skill:

Production line move to transport card

First 5 job check the deflection and towards torsion

Ms world WPS office

Used on Equipments

Digital veriner caliper

Torrgue gauge Dial gauge

Liver mandrel

Tip dress tools, flat file, tip, hammer

chisel

battery gun, Air tool, Die, tap

Spot weld gun, J type, C type, L type, X type, Special type.

Taper scale

Flush Guage

Cap Tiv Remover

Sander paper grade P-100, P-120, P80

Declaration:

I hereby declare that the above information given by me are true and correct to the best of my knowledge.

Date:

Place: YoursTruly,

(S.VETRIMURUGAN)



Contact this candidate