Marvin Q. Yburan
Juan Luna Ext., Bogo City, Cebu, Philippines
E-mail: adm6za@r.postjobfree.com
Phone: +639*********
I am an enthusiastic and dedicated person with extensive experience across all areas of construction, pre– commissioning & operation. An exceptional leader who is able to developed and motivated others to achieve targets. I can demonstrate strong ability to managed work from conception through to successful completion. A proactive individual with logical approach to challenges, I perform effectively and efficiently even within a highly pressurized working environment.
Young, energetic and result-oriented professional with almost 8 years of experience in Construction, Pre- Commissioning / Operation as HVAC Supervisor
Knowledge in installation, Testing and Commissioning of HVAC Equipment
Experienced in handling projects in Power Plant, Oil & Gas Sectors
Supervised Fire Fighting installation works
ASHRAE / SMACNA Standards
CORE COMPETENCIES
HVAC System (Construction, Pre-Commissioning & Operation)
Fire Fighting System (Construction)
Material Approval Request (HVAC Materials)
Turnover Documents Preparation (Construction Completion Dossier & Mechanical Completion Dossier)
Basic Occupational Safety Certified (BOSH)
EDUCATIONAL CREDENTIALS
Bachelor of Science in Electronics & Communications Engineering College of Technological Sciences – Cebu (2002)
COMPUTER PROFICIENCY
Designing Tool: AutoCAD / Bentley
Packages: MS Office (Word, Excel and Power Point)
Adobe Reader / Adobe Acrobat
PROFESSIONAL EXPERIENCE
Ideal Builders A Proposed 18-Storey Mixed Used Commercial ( Sep ’19 – Present) MEPF Field Engineer & Hotel Building
Hyundai Engineering Co. Ltd. Combined Cycle Power Plant, Jijel Algeria ( Jan ’18 – Jan ’19) HVAC Supervisor
Hanwha Engineering & Construction Phosphoric Acid Plant, MAADEN Turaif, KSA (Mar ’15 – Apr ’17) HVAC Supervisor
Doosan Heavy Industries & Construction Rabigh Power Plant-2, SEC Rabigh, KSA (Aug ’11 – Dec ’14) HVAC Field Supervisor
MKG Philippines Cebu Power Plant Project, KEPCO Cebu Phils. (Mar ’09 – Jul ’11) Safety Engineer
Overall Responsibilities:
Supervised and monitoring construction activities as per project site Inspection and Test Plan (ITP) & project site specification.
Preparation of turnover packages as per system scoping and verify all the equipment as properly installed in site as per Installation Operation Manual (IOM) & Inspection and Test Plan (ITP).
Certification of system turnover packages upon completion of requirements and document of each mechanical systems prior to commissioning phase and final acceptance handover to the client.
Update scoped drawings and databases; while coordinating with the Project Completions Department Turnover coordinator. This include input of any required changes into Teamwork’s.
Reviewed & Evaluate construction drawing (FC Drawing) prior to installation.
Prepared sleeves & block outs if necessary.
Performed Testing & Commissioning of HVAC System
Responsible for the complete management and supervision of the HVAC/R project including planning & maintenance for the successful execution of DX and chilled water system project either replacement or new installation.
Prepares periodic reports and provide status of pending works in the related notifications, as well notify immediate supervisor on works hinders progress and due action to solve.
Installation Fire Fighting System (FM200, Novec1230 & Hydrant System).
To attend Toolbox Talk meeting to establish scope of work activities such as safety requirements permit to work, special tools and materials.
PROJECTS EXECUTED
Project: A Proposed 18 – Storey Mixed Use Commercial & Hotel Building Client: Mr. Charlton Cokaliong
Duration: September 23, 2019 - Present
Description: Construction & Installation of Mechanical, Electrical, Plumbing & Fire Protection System Project: Combined Cycle Power Plant Project
Client: Societe Algerienne de Production d’ Electricite (SPE) Duration: January 24, 2018 – January 23, 2019
Description: Construction and Installation of HVAC System for Combine Cycle Power Plant Project Project: Phosphoric Acid Plant Project
Client: MAADEN, Waad Al Shamal, Turaif, KSA
Duration: March 3, 2015 – April 30, 2017
Description: Construction and Installation of HVAC & Fire Fighting System for PAP Project Project: Rabigh Power Plant -2 Project
Client: Saudi Electricity Company, Rabigh, KSA
Duration: August 29, 2011 – December 15, 2014
Description: Construction and Installation of HVAC System for RPP2 Project Project: Cebu Power Plant Project
Client: Korean Electric Power Corporation, Cebu, Philippines Duration: March 1, 2009 – July 31, 2011
Description: Construction and Installation of HVAC System for Cebu Power Plant Project Project: Common Cooling Water Project – Phase 2
Client: Qatar Petroleum, Ras Laffan Industrial City, Qatar Duration: 1 Year
Description: Monitor & Implement Safety rules in site for safe working environment OTHER WORK EXPERIENCE
Gothong Southern Shipping Lines Safety Coordinator Philippines Oct’08 – Feb’09
Dodsal Engineering & Contruction Assistant Safety Officer Qatar Jun’07 – Jun’08
Daxon Technology Incorporated CNC Operator Taiwan ROC Dec’03 – Dec’06
Ultalife Taiwan Incorporated CNC Operator Taiwan ROC Feb’03 – Sep’03
Jollibee Fil Foods Service Crew Philippines Jun’01 – Dec’01
Texas Fried Chicken Service Crew Philippines Mar’98 – Sep’98 MEMBER / AFFILIATION
Philippine Association of Safety Engineers
Institute of Electronics & Communications Engineers of the Philippines PERSONAL DETAILS
Date of Birth: September 18, 1980
Place of Birth: Cebu City
Citizen: Filipino
Passport No.: P3495818A
Marital Status: Married
No. of Children: 2
I hereby certify the information above is true and correct to the best of my knowledge. Respectfully Yours,
Marvin Q. Yburan