Education: B.S. Construction Management, Minor Business. Boise State University (2014) Certifications: OSHA 30 hour, ACI grade I, NUCA Excavation Computer Skills: Microsoft Office, Ag-Tek, Primavera P6, Heavy Job, Vista by Viewpoint, Stonemont QC, Hard Dollar, MS Project, Dat Mobile, World App, CMiC, Sharepoint, Citrix Reciever- WGIP, BIM 360, Bluebeam Experience:

Shimmick Construction Co.: QC Manager/Scheduling Manager/Field Engineer/Office Engineer for the J-117B, P2-123, P2-122 and P2-92 projects on the OCSD plant 2 in Huntington Beach, CA. 4/19- 2/21

• Highlighted the Quality Control items for tasks/work that was on the three week look ahead to make sure the QC requirements were met for all tasks/work. Got with the foreman and engineers to make sure QC requirements were met on the project.

• Made sure the QC paperwork was properly filled out and sent to the client after the inspections were performed.

• Sent inspection requests to the inspectors and coordinated the on site QC testing and lab testing of samples taken on site. Also transmitted the lab test results to the client.

• Performed on site testing of concrete and soil cement placements- took cylinders for compressive strength testing, performed the slump test and air content test of concrete.

• Took daily measurements of the dewatering wells and the monitoring wells levels for the deep excavations on the project. Performed Sand Rossum tests for the dewatering wells and monitored the gallons per minute that were being produced by the wells and surveyed the buildings around the dewatering wells for settlement and reported these daily to the client. Including the weekends and the holidays.

• Helped develop the baseline schedules using Primavera P6 scheduling software and updated the schedule monthly for the Progress Payments. Also prepared Pay Application submittal for payment.

• Updated the Schedule of Values(SOV) monthly for the projects. Walked the work with the client and agree to what percentage of work was complete and then update the SOV and P6 schedule with that information and would submit monthly submittals for the Progress Payment. Attended the monthly Progress Payment meetings and fix any errors in the P6 Schedule(i.e. out of sequence work or the amount being billed) to match the SOV.

• Updated the As-Builts for the projects through Bluebeam, and the clients PM Web software.

• Generated the Daily Reports for projects in CMiC, took daily photos of the progress in the work and submitted these weekly to the client.

• Prepared/Reviewed Submittals and RFI’s and sent documents to the client through CMiC. Also tracked down submittals from subcontractors and made sure they were submitted in a timely manner and reviewed them before sending them to the client.

• Performed Safety walks on the projects verifying crews had proper safety paperwork and equipment checklists. Also identified safety issues on the projects and SWPPP/BMP were in place. Walsh Construction Co.: Inglewood, CA. Project Engineer 2/18- 4/19

• Tracked Quality Incident Reports(QIR’s)-Verify the root cause of the incident, the details of the incident, how it is to be corrected, how to prevent it in the future, effect it has on the project(schedule/cost)

• Oversaw Workflows for NCR’s and RFI’s- I ran reports through “World App” that showed which step the document was in and sent out email alerts too the pertinent parties to notify them of the NCR’s/RFI’s that were in their court.

• Review Daily Inspection Reports and Certified Welding Inspection Reports- Looked for any issues in the reports and made sure that the issues were being addressed and if not, I would notify the proper people to get the issue addressed. Verified that the work on the Schedule was getting inspected.

• Processed the Pay Applications for the Subcontractor Inspectors Contracts- Review the invoices for accuracy, made sure we weren’t getting over billed. Processed the Pay Apps and then submit them to accounting.

• Generated the Change Orders for the Subcontractor contracts when more budget is needed to be added to the contract.

• Worked with Managers on closing out NCR’s and NNC’s

• Reviewed Material Receiving Inspection Reports-made sure all documents were there and that the material conformed to the “Buy America” requirements of the project.

• IT Support for World App- I addressed any problems that would arise, modify the document pages, did some minor coding and piping in the system.

• Reviewed the Concrete Compression sheets to make sure everything conformed to the specifications.

• Supported the inspectors- Help them find plans, specifications, help them with IT issues with IPad/software. CA Rasmussen: Valencia, CA. Project Engineer 10/16-2/18

• Using the Vista software I perform the following tasks: Generate and process change orders and subcontract change orders, Generate and process RFI’s, Generate and process Submittals, Progress Billing, Projections, Meeting Minutes, Transmittals, Letters to owner.

• Using the Heavy Job software I perform the following tasks: I review and edit Time Cards, Claim quantities of work for billing, Adjust quantities for billing, run reports for cost analysis for production, run reports for Progress Billing.

• Using Excel spreadsheets and Hard Dollar, I perform takeoffs for proposals for Change Order work.

• Using the Primavera P6 software I update the CPM schedule and add/edit tasks on projects.

• Other tasks that I perform are as follows: Set up crews for work, Help and support crews with acquiring materials and coordinating crews work, Answer questions about plans and specifications of project, Compile quotes for materials and acquire data sheets of materials for submittal, Three week look ahead schedules, Request lane closures through Caltrans, Request and mark areas for 811/underground utilities and do damage reports for utilities damaged, Traffic control plans, SWPPP inspection reports and testing, Setting up the project from the project handoff, Process and approve purchase orders and many other minor tasks. Granite Construction, Bakersfield, CA. QC Engineer. 4/15- 11/15

• Used Stonemont QC to manage construction materials and develop reports/submittals

• Developed QC plans for projects/ Managed Labs-Personnel and Lab Certifications

• Radiation Safety Officer (RSO)/Managed nuclear density gauge compliance

• Prepared Caltrans CEM forms for submittals to Caltrans Knife River, Boise, ID. Estimating Intern. 2014-2015

• Assisted Estimators in complying bids for estimates

• Used Ag-tek to estimate quantities of materials used

• Used Excel to make estimating spreadsheets and to estimate the quantities of materials. Boise State University, Boise, ID. Student 2010-2014 Civil Engineering Technician/Inspector at Various companies. 1995-2010