[Gaurav Kumar] Page *
GAURAV KUMAR
MobNo. :+91-817*******
House No. 375, Sector D1,
LDA Colony, Kanpur Road,
Lucknow-226012
Uttar Pradesh
E-mail: adm2vd@r.postjobfree.com
Career Objective:
To build career in a esteemed Power Plant company, where I can get an opportunity to prove my technical ability and knowledge by accepting various challenges and fulfilling company’s goals.
Professional Experience:
I am currently working at M/s Kamachi Conventional Power division in Chennai, Tamil Nadu since 11th of March 2021; after completing one year full time regular course of Power Plant Engineering from NPTI in March 2021.
Professional Experience Details:
Name of Organization
Working Experience
Roles and
Responsibilities
M/s Kamachi Industries Limited
Pappankuppam rev. village,
Parthapalayam Body Reddy
Kandigal, S.R Kandigal post
Gummidipoondi-601201,
Thiruvallur, Tamil Nadu
80MW Captive Power Plant
Designation: Field engineer
in TG (Conventional Power
Division)
- Managing a team of Power
Plant for day to day
operation and Maintenance
related activities for Turbine,
Pumps & Compressor,
Cooling System (ACW, Lub.
Oil cooler) etc; Monitoring
various parameters of the
plant and Troubleshooting of
running problem.
[Gaurav Kumar] Page 2
Directorate of Naval Design IHQ
of Ministry of Defence
(MOD),Kailash Colony, New Delhi
Through:
Conceptia Software Tech. Pvt.
Ltd
Designation: Design
Engineer.
Software Used:
AutoCAD and Microsoft
Office.
-Design Of 3D model of
compartments& its
equipments.
-Scrutinizing of General
arrangement & structure
drawings of ship hulls.
Technical Education:
Technical Courses
Undertaken
Duration of the
Course
Technical
Board /
University
Year of
Passing
% of
marks
obtained.
Post Graduate Diploma
Course In Power Plant
Engineering (PGDC
From NPTI )
Two Semesters
Or 1-year full time
regular PGDC
course (2020-
2021).
National Power
Training Institute,
Faridabad (Under
Ministry of Power,
Govt. of India)
MARCH
2021
1st Plant visit:
NTPC, Faridabad Combined Cycle Gas Power Plant, Capacity is 430 Mw. 2nd Plant visit:
M/s RPSCL, Rosa Shahjahanpur, Uttar Pradesh. Power Plant of 1,200 MW, coal based. B.Tech in Mechanical
Engineering.
Four Years
(2008-2012)
Uttar Pradesh
Technical
University
2012 60
(1st
Div)
Minor Project
Project (I) :Third Year Internship (July 2011 to August 2011). Company :Tehri Hydro Development Corporation India Limited
(THDC), Rishikesh, Uttarakhand.
Area of Study :Study of Hydraulic Turbines.
Major Project
Final Year engineering project – Working Model of Hydro Electric Power Generation.
[Gaurav Kumar] Page 3
Objectives of Project Works:
1. To concise the size of the Hydro Generator Model. 2. To study the principal of hydro-electric power generation in a practical way and also to solve the technical problems when constructed.
Declaration:
I solemnly declare that all the above information is correct to the best of knowledge and belief.
Date:
Place :
(GAURAV KUMAR)