Post Job Free

Resume

Sign in

Electric Power Plant

Location:
Mumbai, Maharashtra, India
Posted:
June 11, 2021

Contact this candidate

Resume:

[Gaurav Kumar] Page *

GAURAV KUMAR

MobNo. :+91-817*******

House No. 375, Sector D1,

LDA Colony, Kanpur Road,

Lucknow-226012

Uttar Pradesh

E-mail: adm2vd@r.postjobfree.com

Career Objective:

To build career in a esteemed Power Plant company, where I can get an opportunity to prove my technical ability and knowledge by accepting various challenges and fulfilling company’s goals.

Professional Experience:

I am currently working at M/s Kamachi Conventional Power division in Chennai, Tamil Nadu since 11th of March 2021; after completing one year full time regular course of Power Plant Engineering from NPTI in March 2021.

Professional Experience Details:

Name of Organization

Working Experience

Roles and

Responsibilities

M/s Kamachi Industries Limited

Pappankuppam rev. village,

Parthapalayam Body Reddy

Kandigal, S.R Kandigal post

Gummidipoondi-601201,

Thiruvallur, Tamil Nadu

80MW Captive Power Plant

Designation: Field engineer

in TG (Conventional Power

Division)

- Managing a team of Power

Plant for day to day

operation and Maintenance

related activities for Turbine,

Pumps & Compressor,

Cooling System (ACW, Lub.

Oil cooler) etc; Monitoring

various parameters of the

plant and Troubleshooting of

running problem.

[Gaurav Kumar] Page 2

Directorate of Naval Design IHQ

of Ministry of Defence

(MOD),Kailash Colony, New Delhi

Through:

Conceptia Software Tech. Pvt.

Ltd

Designation: Design

Engineer.

Software Used:

AutoCAD and Microsoft

Office.

-Design Of 3D model of

compartments& its

equipments.

-Scrutinizing of General

arrangement & structure

drawings of ship hulls.

Technical Education:

Technical Courses

Undertaken

Duration of the

Course

Technical

Board /

University

Year of

Passing

% of

marks

obtained.

Post Graduate Diploma

Course In Power Plant

Engineering (PGDC

From NPTI )

Two Semesters

Or 1-year full time

regular PGDC

course (2020-

2021).

National Power

Training Institute,

Faridabad (Under

Ministry of Power,

Govt. of India)

MARCH

2021

1st Plant visit:

NTPC, Faridabad Combined Cycle Gas Power Plant, Capacity is 430 Mw. 2nd Plant visit:

M/s RPSCL, Rosa Shahjahanpur, Uttar Pradesh. Power Plant of 1,200 MW, coal based. B.Tech in Mechanical

Engineering.

Four Years

(2008-2012)

Uttar Pradesh

Technical

University

2012 60

(1st

Div)

Minor Project

Project (I) :Third Year Internship (July 2011 to August 2011). Company :Tehri Hydro Development Corporation India Limited

(THDC), Rishikesh, Uttarakhand.

Area of Study :Study of Hydraulic Turbines.

Major Project

Final Year engineering project – Working Model of Hydro Electric Power Generation.

[Gaurav Kumar] Page 3

Objectives of Project Works:

1. To concise the size of the Hydro Generator Model. 2. To study the principal of hydro-electric power generation in a practical way and also to solve the technical problems when constructed.

Declaration:

I solemnly declare that all the above information is correct to the best of knowledge and belief.

Date:

Place :

(GAURAV KUMAR)



Contact this candidate