Post Job Free

Resume

Sign in

Power Plant Engineer

Location:
Denpasar, Bali, Indonesia
Salary:
9000 USD/ monthly
Posted:
April 23, 2021

Contact this candidate

Resume:

Senior Structural & Bridge Engineer

Name Roberto STEFANO

Nationality Italian

Resident 51, Goldhill Plaza 308900 Singapore

E-mail adlwjt@r.postjobfree.com

Skype sae.hongkong

Linkedin https://www.linkedin.com/in/stefano-roberto-63768565/ Senior Structural Bridge Engineer and Site Construction Management in high value key projects for Bridges, Power, Piping & Mining. Proven experience leading multinational teams in challenging environments. communication and presentation skills at an executive level.

Education

Master in Civil Works Engineering.

Universita La Sapienza Roma [ ITALY] - [June 1979 to September 1984] Mastery

Midas Bridge Engineering software

CETABS / SAP 2000 / CSI Bridge- Computers and Structures, STAAD Pro_Bentley Systems, Inc. Software Structures Languages

English : Fluent and Professional

French : Fluent and Professional

Italian : native language

Portuguese : native language

Professional Experience

Senior Structural Bridge Engineer

Company Name: Rodic Consultants Private

Dates Employed July 2019 – Feb 2021

6 lanes Extra-dos Kacchi Dargah-Bidupur Bridge Patna Corridor Total Length 9,706 m / height 21m.

Location: Patna (Bihar) -India

Senior Structural Bridge Engineer

Company Name: Rodic Consultants Private

Limited Dates Employed Jun 2017 – Jun 2019

Cable Stayed Bridge Aguwani Ghat [India]Principal Span 165m + 270m + 165m / 6 Extra-doses 165m / total length 3160m / height 38m. Location New Delhi Area, [India]

S ummary

Senior Structural

Bridge Engineer

and Site

Senior Structural Bridge Engineer

Company name : Arcelor Khazakhstan

Date employed : Oct 2016 - May 2017

Steel Box Girder bridge & Steel Truss bridge 5 span x 72 m / height 26m. Location : Karaganda, [Kazakhstan]

Structural Bridge Engineer

Company Name: SOCOTEC

Certification International Dates

Employed Jan 2015 – Sep 2016

Cable Stayed Bridge Chambal Cross River: 175+350+175 / height 36m/ 2nd Step Location Kota [India]

Structural Bridge Engineer

Company Name: Hyundai Engineering

Dates Employed May 2009 – Jan 2015

Cable Stayed Bridge Chambal Cross River: 175+350+175 / height 36m/ 1st Step Location Kota [India]

Structural Bridge Engineer

Company Name: SOCOTEC

Certification International

Dates Employed Jan 2008 – Jan 2009

Takutu Concrete Cantilever Bridge :Main Span 230m / total length 350m Location Takutu, [Guyana / Brazil]

Structural Civil Engineer / Designer

Company Name: SOCOTEC

Certification International

Dates Employed Mai 2006 – Jan 2008

Post-tension U-Shape Mudeirej Bridge Reconstruction 10 x 40m Location Mont Safwan, [Lebanon]

Structural Civil Engineer / Designer

Company Name: SOCOTEC

Certification International

Dates Employed Jan 2004 – Jan 2006

Post Tension Cantilever Pikine Bridge 5 x 40m Span. Location Pikine, [Senegal]

Structural Civil Engineer / Designer

Company Name: SOCOTEC

Certification International

Dates Employed Feb 1990– Jan 2004

Pont the Normandie Cable Stayed Bridge :Main Span 856 / height 214m Location Le Havre Normadie, [France]

Bridges Key Projects

JuL 2017 - Feb 2021 : Senior Structural Bridge Engineer / Rodic Consultants Private Limited [India]

6 lanes Extra-dos Kacchi Dargah-Bidupur Bridge Patna Corridor Total Length 9,706 m / height 21m.

Responsible for, Review Design / Re-Modelling / Launching Procedures Supervision / Correspondence with Client / Contractor / Leading daily Technical Meetings/ Daily and Monthly Reports / General Supervision on site including suggestion for modification in the design as per the prevailing site conditions, overall administration of the project, approve contractors deployment of manpower. Responsible for identification and approval of sources of material, materials management, resources mobilization, quality control/quality assurance, contract management and administration of works, ensure proper maintenance of existing carriageway.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Jun 2017 - Jun 2019 : Senior Structural Bridge Engineer / Rodic Consultants Private Limited [India]

Cable Stayed Bridge Aguwani Ghat [India]Principal Span 165m + 270m

+ 165m / 6 Extra-doses 165m / total length 3160m / height 38m. Authority Engineer for the project of Construction of 2x2 lane Bridge with footpath across River Ganga between Aguwani Ghat (Khagaria District) and Sultanganj (Bhagalpur District) including Navigation Span of Cable Stayed and approaches (Connecting NH-31 and NH-80) in the State of Bihar. Total Length: 20.55 km; Lane: 4; Client: Bihar Rajya Pul Nirman Nigam Limited. Responsible for, Review Design / Re-Modelling / Launching Procedures/ Supervision / Correspondence with Client / Contractor / Leading daily Technical Meetings/ Daily and Monthly Reports / General Supervision on site including suggestion for modification in the design as per the prevailing site conditions, overall administration of the project, approve contractors deployment of manpower & machinery at the site, Responsible for identification and approval of sources of material, materials management, resources mobilization, quality control/quality assurance, contract management and administration of works, ensure proper maintenance of existing carriageway.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Oct 2016 - May 2017 : Senior Structural Bridge Engineer / C.A.E. Pte Ltd / Arcelor Temirtau JSC [Kazakhstan]

Steel Box Girder bridge & Steel Truss bridge 5 span x 72 m / height 26m. Senior Designer for heavy Steel Structures, responsible for creating Finite Elements Models and leading drawings for construction. Approval Materials for the Overall Construction / Repairing and Construction Method Statement either Supervision on site during Reconstruction /Full Sequence and Method Statement for Reconstruction after Collapse. Ensure compliance to project specifications according nationals standards GOST. Client: Arcelor Temirtau JSC Karaganda.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 1

Jan.2015 - Sept. 2016: Senior Structural Bridge Engineer, C.A.E.Pte Ltd

/ Socotec International S.p.A. France JV Hyundai Construction Equipment India Pvt. Ltd [India]

Cable Stayed Bridge Chambal River [ India] 2nd phase across River Chambal on Kota Bypass on NH-76 of East West Corridor in the State of Rajasthan. The project comprises 700 m Long Stayed Cable Bridge of 350 m Span with 175 m lateral span both sides.

Responsible for creating and hand out schedules for construction staff working in the field. Supervise field quality control observations and assessments. Supervising the Inspection and assessment activities for materials being used in construction projects. Review Design / Re-Modelling / Launching Procedures Supervision / Correspondence with Client / Contractor / Leading daily Technical Meetings/ Daily and Monthly Reports / General Supervision on site / Approval Materials for the Overall Construction / Repairing Method Statement and Supervision on site during Reconstruction /Full Sequence and Method Statement for Reconstruction after Collapse. Ensure compliance to project specifications. Make sure that all construction activities are being carried out following present safety rules. Ensure availability of resources and materials at all times.Client: National Highway Authority India [ NHAI].

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Jan.2009 - Jan. 2015 : Senior Structural Bridge Engineer / C.A.E. PteLtd

/ Hyundai Engineering/ Socotec International Spa [India] Cable Stayed Bridge Chambal River 1st Phase on Kota Bypass on NH-76 of East West Corridor in the State of Rajasthan. The Project comprises 700 m long Cable Stayed Bridge of 350 m Span with 175 M lateral Span both Side

Responsible for creating and hand out schedules for construction staff working in the field. Supervise field quality control observations and assessments. Supervising the Inspection and assessment activities for materials being used in construction projects. Review Design / Re-Modelling / Launching Procedures Supervision / Correspondence with Client / Contractor / Leading daily Technical Meetings/ Daily and Monthly Reports / General Supervision on site / Approval Materials / Visit Manufactures for approval/Direction NDT Testing for the Overall Construction / Repairing Method Statement and Supervision on site during Reconstruction /Full Sequence and Method Statement for Reconstruction after Collapse. Ensure compliance to project specifications. Make sure that all construction activities are being carried out following present safety rules. Ensure availability of resources and materials at all times.Client: National Highway Authority India [ NHAI].

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 2

Jan 2008– Jan 2009: Senior Structural Bridge Engineer, C.A.E. Pvt Ltd

/ Socotec International [Brazil].

Concrete Cantilever Bridge Takutu River Bridge, linking Lethem in Guyana to Bonfim in Brazil; Total Length: 350 m; Maximum Span Length: 230 m

Responsible for Review Design / Re-Modelling / Launching Form Traveler Procedures Supervision / Correspondence with Client / Contractor / Leading daily Technical Meetings/ Daily and Monthly Reports / General Supervision on site / Approval Materials / Visit Manufactures for approval. Client: Integration of the Regional Infrastructure of South America [IRISA].

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - May 2006– Jan 2008: Senior Bridge Structural Engineer, C.A.E. Pvt Ltd / Socotec International [Lebanon].

Post-Tension Beam Mudeirej Bridge Repair & Rehabilitation 10x40m Span.

Responsible for Review Design / Re-Modelling / Procedures Supervision / Correspondence with Client / Contractor / Leading daily Technical Meetings/ Daily and Monthly Reports / General Supervision on site / Approval Materials /Full Sequence and Method Statement for Reconstruction after Collapse. Client :United States Agency for International Development [ISAID].

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Jan 2004 – Jan 2006: Senior Bridge Structural Engineer, C.A.E. Pvt Ltd

/Socotec International [Senegal]

Concrete Box Girder Pikini Bridge Total Length: 200 m; Arrangement: 5 Deck span x 40 m

Responsible for Review Design / Re-Modelling / Launching Form Traveler Procedures Supervision / Correspondence with Client / Contractor / Leading daily Technical Meetings/ Daily and Monthly Reports / General Supervision on site / Approval Materials / Visit Manufactures for approval. Client: Senegal’s Toll Highway Public-Private Partnership

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - Feb 1990– Jan 2004: Proof Checker Senior Bridge Structural Engineer, C.A.E. Pvt Ltd / Socotec International [France]

Stayed Cable Bridge Pont de Normandie 2140 meter Cable Stayed Bridge with longest span 856 meters.

Checking and Review Design / Construction Supervision / Participating in the Review Design / Re-Modelling / launching Procedures & Supervision on site.

- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - 3

.

Key Projects as Senior Structural Designer for Industrial Plants

ARCELOR Pipeline 02 and Nitrogen Karaganda - KAZAKHSTAN Company Arcelor MIttal Temirtau - 2019 Modelling and Calculation Pipeline )2 and Nitrogen High Pressure. Karbala Cement & Power Plant - KCML - Karbala IRAQ Company Group Lafarge Holcim KCML - 2018

Design Industrial Buildings for Cement & Power Plant. ACCREP 7 Arabian Cement Plant: Rabigh - KINGDOM SAUDI ARABIA - Company: Arabian Cement Company - 2017

Design Industrial Buildings for Cement & Power Plant. Arasmeta Cement & Power Plant - Arasmeta - INDIA - Company: Lafarge Arasmeta Cement Company Ltd.- 2016 Design Industrial Buildings for Cement & Power Plant. RAK White Cement - Ras Al Khaimah - UNITED ARAB EMIRATES Company: Rak White Cement Ras Al Khaimah - 2015

Design Industrial Buildings for Cement & Power Plant. JAZAN GRAIN SILOS - Jizan - KINGDOM SAUDI ARABIA - Company: Al Muhaidib Contracting and Stolz France. - 2014 Design and Calculation Grain and Harbour Plant.

Iligan Cement Corporation - Iligan - PHILIPPINES - Company - Iligan Cement Corporation - Group Lafarge - 2013 Design Industrial Buildings for Cement & Power Plant. Dujiangyan Cement Plant Lafarge Chengdu - CHINA

Company - LAFARGE France / Branch Chengdu China. - 2008 Design of Reconstruction for Industrial Buildings for Cement & Power Plant Lhkonga Cement Plant - Cement Andalas - Banda Aceh INDONESIA Company - Lafarge Cement Andalas / Indonesia - 2004 Design of Reconstruction for Industrial Buildings for Cement& Power Plant.

… /.

4



Contact this candidate