Post Job Free

Resume

Sign in

Electrician

Location:
Abu Dhabi, United Arab Emirates
Salary:
3000
Posted:
April 22, 2021

Contact this candidate

Resume:

OTHER SKILLED : INSTRUMENT FITTER, ELECTRICAL TECHNICIAN, TELECOM TECHNICIAN, FAS TECHINICIAN, ELECTRICAL & INSTRUMENT FABRICATOR, MAINTENANCE.

OBJECTIVES : To be able to work a position fit with my skill and experience, and to contribute for development and growth of the company.

EDUCATIONAL BACKGROUND:

College : Technological Institute of the Philippines (TIP)

Quezon City (1996-1998)

Course : Mechanical Engineering

TRAINING/SEMINAR ATTENDED:

1.Instrument Fitter (Feb. 01, 2007 to Mar. 07, 2007)

12 EEI CORPORATION (Manggahan St., Bagumbayan,Quezon City)

2. Basic of ISO 9001-2000

Jubail, Juaymah Kingdom of Saudi Arabia (Eastern Region)

3. Quality Standards Requirements

Electrical Works, Al Sinayah,Yanbu Kingdom of Saudi Arabia (Western Region)

OVERSEAS WORK EXPERIENCES:

1.) POSITION : Electrical technician

PROJECT : ADNOC LOGISTIC AND SERVICES

ABU DHABI SHIP BUILDING (ADSB)

COMPANY : RAWAFED LLC

DURATION : JUNE 2020 – SEPTEMBER 2020

JOB DESCRIPTION :

Trouble shooting & Overhaul of motor & panel.

Installation of navigation lights & Normal lights (WP)(EX PROOF)

Megger testing of motor, Generator, Main engine PORT SIDE & STARBOARD SIDE

2.) POSITION : Electrical Maintenance

COMPANY : CAMPAIGN FACILITIES MANAGEMENT SERVICES / MUSANADA

DURATION : February 2020 – March 2020

JOB DESCRIPTION :

Maintenance of government facility (abu dhabi bus terminal, schools & parking)

Trouble shooting & installation of electrical work scoop.

3.) POSITION : Electrician

PROJECT : ADNOC logistics and services

COMPANY : RAWAFED LLC

DURATION : March 2019 – October 2019

JOB DESCRIPTION :

Maintenance of building and offices under the vicinity of ADNOC facility.

Installation & trouble shooting of electrical tools and materials.

4.) POSITION : Electrician

PROJECT : ADNOC Supply Chain Division – Pipelines & Terminal

COMPANY : KSCC

DURATION : September 2018 – January 2019

JOB DESCRIPTION :

Repairing electrical tools and equipment.

Maintainance of welding generator & supply generator.

5.) POSITION : Instrument Technician / Electrical Technicians

PROJECT : Ruwais Refinery Expansion Project

COMPANY : Takreer / Daewoo - Kscc

DURATION : April 1, 2018 to June 30, 2018

JOB DESCRIPTION:

Replacement of Tubing in the Analyzer

Leak Testing

Connections of Power for Tools and Generator.

6.) POSITION : ELECTRICAL TECHNICIANS

PROJECT : ADCO (Abu Dhabi Company for Onshore) Rumaitha

COMPANY : GS KSCC

DURATION : July 27, 2017 to December 31,2017

JOB DESCRIPTION:

Wiring installations and trouble shooting of Panel Board on control of overhead crane.

Alignment of Fin Fan Cooler.

7.) POSITION : Instrument Technician/ FAS AND TELECOM TECHNICIAN

PROJECT : Ruwais Refinery Expansion Project

COMPANY : Daewoo E&C (EPC-4) / DAEMYUNG LLC

DURATION : May 1, 2013 to March 31, 2017

JOB DESCRIPTION:

Cable Pulling of Instrument Cable Primary/Secondary Fiber Optic, Cat 5e, Cat 6.

Carrying out the loop checking for SCS, LAN, Telephone, CCTV, PACS, PA and F&G systems

Installation of Manual call point, Hydrocarbon Gas detector (S4100S and IR4000S), Smoke detector, Sounder, Beacon, Flame detectors (Shelter area and Non structure area) and Plant Siren

Installation of LHD systems for floating roof tanks, Internal floating roof tanks, pump shelter and compressor areas in Ruwais refinery Expansion project.

Installation of HSSD and Inergen systems for Rack room, Battery room in Satellite Instrument shelter, Substation, Extension control room and Pipeline control room in TAKREER.

Installation of BOSCH cameras MIC 440(4nos), VG4-312(7nos) and MIC 500(77 nos) in the building and process area.

Functional test for the entire Fire alarm system as per Cause and Effect chart in RRE Project.

Testing and commissioning of LHD and Deluge systems for Tanks (92 tanks).

Testing of F&G zone alarms, Plant siren and Interface between F&G and CCTV systems, HVAC, UPS and GDS systems.

8.) POSITION : Leadman Instrument /Instrument Technician/ Electrical

PROJECT : Saudi Aramco Moril Refinary Co. Ltd. (Samref) Clean Fuel Project

COMPANY : Al-Rushaid Construction Co.Ltd (ARCC-EEI)

Worley – Persons Resources & Energy (Arabia Ltd.)

Exxon Mobil Research & Engineering

Address : Yanbu Western Region K.S.A

Duration : June 26, 2011 to March 3, 2012

JOB DESCRIPTION :

Cable Pulling of Instrument Cable Primary/Secondary Fiber Optic, Cat 5e, Cat 6 & Coxcial Cable at Control Building (CCH) Plus Signal Cable.

Cable Pulling of Power Cable.

Termination of Cable at Emergency Shutdown Bay Panel, from ESD bay to termination box & Cabinet as per Termination Schedule.

Installation of Panel Cabinet for Instrument Control

Installation of Impulse Tubing from Transmitter to tapping point as per Hook-up Schedule.

Loop Checking, Wire Checking & Continuity, Megger .etc.

Installation of Conduit & Flexible Hose

Installation of New Foxboro Console at Control Building

Fabrication & Installation of Cable Tray, Perpurated Tray and Ladder type tray.

Termination of signal Cable & Power Cable Using of termination Schedule from Junction box to Control Room, From Junction Box to Transmitter.

Installation of Instrument, Like CPU, Automatic Transfer Switch and other Instrument Product. Monitor at all Console in Central Control House (CCH) Building.

9.) POSITION : Leadman Instrumentation

PROJECT : Petro-Rawec Power Plant Project (Shutdown)

COMPANY : Al-Rushaid Construction Co .Ltd (Arcc-EEI)

Address : Rabigh Western Region

Kingdom of Saudi Arabia

Duration : April 30, 2011 to June 20,2011

JOB DESCRIPTION :

Installation of Transmitter, Control Valves and Other Instrument.

Installation of Stainless Tubing & Air Copper Tube From Main Header to Control Valve as per Hook-Up Drawing.

Installation Of Small Bour tube & Stainless Tubing & Support from Transmitter to tapping point as per Hook-Up Drawing.

Installation of Instrument Stanchion & Support Frames as per Details Drawing.

Installation & Fabrication of Stainless Tube Tray Prior to Copper Tube.

Leak Testing of Impulse Tube, Small Bour tube & Copper Tubing

Installation of Conduits & Flexible Hose, Condult EMT, RSC & ETC.

Cable Pulling of Power Cable

Megger continuity, Wire Checking & Loop Checking.

10.) POSITION : Instrument Fitter/Instrument Technician

PROJECT : Al-Qurayyah Power Plant (Boiler 3&4 for Modification Shutdown)

COMPANY : Al Rushaid Construction Co. Ltd (ARCC-EEI)

Mitsubishi Heavy Industries (MHI)

Address : Al Qurayyah, Abqaiq Eastern Province K.S.A

Duration : September 8, 2010 to April 15, 2011

JOB DESCRIPTION :

Installation of Copper Tubing from Transmitter to Burner Gun as per Hook-Up Drawing.

Installation of Small Bour tube From Main Header to Control Valve as per Hook-up Drawing

Installation of Thermo Couple & flame detector

Installation of Perpurated Tray & Stainless Tray prior to Copper Tube

Installation of Stainless Tube

Cable Pulling of Power Cable & instrument cable

Leak Testing of Impulse Tubing, Small Bour tube & Copper Tube

Megger, Continuity, Wire Checking & Loop Checking

Installation of Conduits & Flexible Hose & etc.

POSITION : Instrument Fitter/Instrument Technician

PROJECT : Al Qurayyah Power Plant (Boiler 1&2 Modification Shutdown)

COMPANY : Al Rushaid Construction Co. Ltd. (ARCC - EEI)

Mitsubishi Heavy Industries (MHI)

Address : Al Qurayyah, Abqaiq Eastern Province (K.S.A)

Duration : September 4,2009 to March 20,2010

JOB DESCRIPTION :

Demolition of old copper tube & small bour tube, stainless tube prior to boiler

Installation of new Copper Tube from Transmitter to burner Gun as per Hook-Up Drawing

Installation of small bour tube From Main Header to Control Valve as per Hook-Up Drawing

Installation of Thermo Couple

Installation of Flame Detector

Installation of Perpurated Tray & Stainless Tray prior to Copper Tube.

Installation of Stainless Tube

Cable Pulling of Power Cable

Cable Pulling of Instrument Cable

Leak Testing of Impulse Tubing, Small Bour Tube & Copper Tube

Installation of Conduits & Flexible Hose & etc. as per Hook-Up Drawing.

POSITION : Instrument Fitter/Group Leader

PROJECT : Eastern Petrochemical Company, Sharq 3rd Expansion Project

COMPANY : Al Rushaid Construction Co. Ltd. (ARCC-EEI)

Shaw stone & Western Co. (Shaw)

Address : Al Jubail Industrial City Kingdom of Saudi Arabia

Duration : August 25, 2007 to September 1, 2009

JOB DESCRIPTION :

Fabrication of Instrument stanchion & Frame as Per Details Drawing

Installation of radiant Frame, TLE frame, Instrument Stanchion of Air Tubing from Main Header to Control Valve & Supports as per Hook-Up Drawing

Installation of Impulse Air Tubing From Transmitter to Tapping Point & Supports As Per Hook-Up Drawing

Oil Mist Tubing, Analyzer, Termination & Leak Testing

Installation of Level Gauge & Volume Tank

Installation of Cable Tray, Perpurated Tray & Ladder Type Tray

Cable Pulling of Instrument Cable, Primary & Secondary Cable From Junction Box to Cable Duct, from cable duct to Instrument

Conducting from Junction box to cable duct, from cable duct to instrument

Termination of Panel, Cable Dressing, Termination of Power & Signal Cable using Termination Schedule

Installation of Thermo Couple

Wire Checking from Terminal Block to Junction Box to Terminal Block of Panel

Megger & Loop Checking

Leak Testing of Impulse Tube, Air Tubing & Other Instrument.

POSITION : Instrument Fitter

PROJECT : Al Bayroni Refinery (Shutdown)

COMPANY : Al Rushaid Construction Co. Ltd (ARCC/EEI)

Technip Co. Ltd

Address : Al Jubail Industrial City K.S.A

Duration : November 28, 2007 to March 20, 2008

JOB DESCRIPTION :

Fabrication of Instrument Stanchion & Frames as Per Details Drawing

Installation of Impulse Tubing (Stainless) from Transmitter to tapping point

Installation of air tubing from Main Header to Control Valve & Supports as per Hook-Up Drawing

Installation and Fabrication of Cable tray, Perpurated Tray & Ladder Type Tray

Cable Pulling of Instrument Cable, Primary, Secondary. & Power Cable.

Conduiting of Flexible Hose, RSC, EMC type Conduit

Wire Checking & Continuity

Leak Testing of all Impulse Tubing & Air Tubing

PERSONAL INFORMATION:

Birthday : September 14, 1979

Civil Status : Married

Citizenship : Filipino

Gender : Male

Passport # : EC 7475966

I hereby Certify that their Entire above Mentioned name are true and correct through my ability and knowledge

KRIZTHIAN ABUAN QUILAY

APPLICANT

KRIZTHIAN ABUAN QUILAY

ELECTRICIAN

Mobile : 052*******

Email : adlwb9@r.postjobfree.com,

adlwb9@r.postjobfree.com



Contact this candidate