OTHER SKILLED : INSTRUMENT FITTER, ELECTRICAL TECHNICIAN, TELECOM TECHNICIAN, FAS TECHINICIAN, ELECTRICAL & INSTRUMENT FABRICATOR, MAINTENANCE.
OBJECTIVES : To be able to work a position fit with my skill and experience, and to contribute for development and growth of the company.
EDUCATIONAL BACKGROUND:
College : Technological Institute of the Philippines (TIP)
Quezon City (1996-1998)
Course : Mechanical Engineering
TRAINING/SEMINAR ATTENDED:
1.Instrument Fitter (Feb. 01, 2007 to Mar. 07, 2007)
12 EEI CORPORATION (Manggahan St., Bagumbayan,Quezon City)
2. Basic of ISO 9001-2000
Jubail, Juaymah Kingdom of Saudi Arabia (Eastern Region)
3. Quality Standards Requirements
Electrical Works, Al Sinayah,Yanbu Kingdom of Saudi Arabia (Western Region)
OVERSEAS WORK EXPERIENCES:
1.) POSITION : Electrical technician
PROJECT : ADNOC LOGISTIC AND SERVICES
ABU DHABI SHIP BUILDING (ADSB)
COMPANY : RAWAFED LLC
DURATION : JUNE 2020 – SEPTEMBER 2020
JOB DESCRIPTION :
Trouble shooting & Overhaul of motor & panel.
Installation of navigation lights & Normal lights (WP)(EX PROOF)
Megger testing of motor, Generator, Main engine PORT SIDE & STARBOARD SIDE
2.) POSITION : Electrical Maintenance
COMPANY : CAMPAIGN FACILITIES MANAGEMENT SERVICES / MUSANADA
DURATION : February 2020 – March 2020
JOB DESCRIPTION :
Maintenance of government facility (abu dhabi bus terminal, schools & parking)
Trouble shooting & installation of electrical work scoop.
3.) POSITION : Electrician
PROJECT : ADNOC logistics and services
COMPANY : RAWAFED LLC
DURATION : March 2019 – October 2019
JOB DESCRIPTION :
Maintenance of building and offices under the vicinity of ADNOC facility.
Installation & trouble shooting of electrical tools and materials.
4.) POSITION : Electrician
PROJECT : ADNOC Supply Chain Division – Pipelines & Terminal
COMPANY : KSCC
DURATION : September 2018 – January 2019
JOB DESCRIPTION :
Repairing electrical tools and equipment.
Maintainance of welding generator & supply generator.
5.) POSITION : Instrument Technician / Electrical Technicians
PROJECT : Ruwais Refinery Expansion Project
COMPANY : Takreer / Daewoo - Kscc
DURATION : April 1, 2018 to June 30, 2018
JOB DESCRIPTION:
Replacement of Tubing in the Analyzer
Leak Testing
Connections of Power for Tools and Generator.
6.) POSITION : ELECTRICAL TECHNICIANS
PROJECT : ADCO (Abu Dhabi Company for Onshore) Rumaitha
COMPANY : GS KSCC
DURATION : July 27, 2017 to December 31,2017
JOB DESCRIPTION:
Wiring installations and trouble shooting of Panel Board on control of overhead crane.
Alignment of Fin Fan Cooler.
7.) POSITION : Instrument Technician/ FAS AND TELECOM TECHNICIAN
PROJECT : Ruwais Refinery Expansion Project
COMPANY : Daewoo E&C (EPC-4) / DAEMYUNG LLC
DURATION : May 1, 2013 to March 31, 2017
JOB DESCRIPTION:
Cable Pulling of Instrument Cable Primary/Secondary Fiber Optic, Cat 5e, Cat 6.
Carrying out the loop checking for SCS, LAN, Telephone, CCTV, PACS, PA and F&G systems
Installation of Manual call point, Hydrocarbon Gas detector (S4100S and IR4000S), Smoke detector, Sounder, Beacon, Flame detectors (Shelter area and Non structure area) and Plant Siren
Installation of LHD systems for floating roof tanks, Internal floating roof tanks, pump shelter and compressor areas in Ruwais refinery Expansion project.
Installation of HSSD and Inergen systems for Rack room, Battery room in Satellite Instrument shelter, Substation, Extension control room and Pipeline control room in TAKREER.
Installation of BOSCH cameras MIC 440(4nos), VG4-312(7nos) and MIC 500(77 nos) in the building and process area.
Functional test for the entire Fire alarm system as per Cause and Effect chart in RRE Project.
Testing and commissioning of LHD and Deluge systems for Tanks (92 tanks).
Testing of F&G zone alarms, Plant siren and Interface between F&G and CCTV systems, HVAC, UPS and GDS systems.
8.) POSITION : Leadman Instrument /Instrument Technician/ Electrical
PROJECT : Saudi Aramco Moril Refinary Co. Ltd. (Samref) Clean Fuel Project
COMPANY : Al-Rushaid Construction Co.Ltd (ARCC-EEI)
Worley – Persons Resources & Energy (Arabia Ltd.)
Exxon Mobil Research & Engineering
Address : Yanbu Western Region K.S.A
Duration : June 26, 2011 to March 3, 2012
JOB DESCRIPTION :
Cable Pulling of Instrument Cable Primary/Secondary Fiber Optic, Cat 5e, Cat 6 & Coxcial Cable at Control Building (CCH) Plus Signal Cable.
Cable Pulling of Power Cable.
Termination of Cable at Emergency Shutdown Bay Panel, from ESD bay to termination box & Cabinet as per Termination Schedule.
Installation of Panel Cabinet for Instrument Control
Installation of Impulse Tubing from Transmitter to tapping point as per Hook-up Schedule.
Loop Checking, Wire Checking & Continuity, Megger .etc.
Installation of Conduit & Flexible Hose
Installation of New Foxboro Console at Control Building
Fabrication & Installation of Cable Tray, Perpurated Tray and Ladder type tray.
Termination of signal Cable & Power Cable Using of termination Schedule from Junction box to Control Room, From Junction Box to Transmitter.
Installation of Instrument, Like CPU, Automatic Transfer Switch and other Instrument Product. Monitor at all Console in Central Control House (CCH) Building.
9.) POSITION : Leadman Instrumentation
PROJECT : Petro-Rawec Power Plant Project (Shutdown)
COMPANY : Al-Rushaid Construction Co .Ltd (Arcc-EEI)
Address : Rabigh Western Region
Kingdom of Saudi Arabia
Duration : April 30, 2011 to June 20,2011
JOB DESCRIPTION :
Installation of Transmitter, Control Valves and Other Instrument.
Installation of Stainless Tubing & Air Copper Tube From Main Header to Control Valve as per Hook-Up Drawing.
Installation Of Small Bour tube & Stainless Tubing & Support from Transmitter to tapping point as per Hook-Up Drawing.
Installation of Instrument Stanchion & Support Frames as per Details Drawing.
Installation & Fabrication of Stainless Tube Tray Prior to Copper Tube.
Leak Testing of Impulse Tube, Small Bour tube & Copper Tubing
Installation of Conduits & Flexible Hose, Condult EMT, RSC & ETC.
Cable Pulling of Power Cable
Megger continuity, Wire Checking & Loop Checking.
10.) POSITION : Instrument Fitter/Instrument Technician
PROJECT : Al-Qurayyah Power Plant (Boiler 3&4 for Modification Shutdown)
COMPANY : Al Rushaid Construction Co. Ltd (ARCC-EEI)
Mitsubishi Heavy Industries (MHI)
Address : Al Qurayyah, Abqaiq Eastern Province K.S.A
Duration : September 8, 2010 to April 15, 2011
JOB DESCRIPTION :
Installation of Copper Tubing from Transmitter to Burner Gun as per Hook-Up Drawing.
Installation of Small Bour tube From Main Header to Control Valve as per Hook-up Drawing
Installation of Thermo Couple & flame detector
Installation of Perpurated Tray & Stainless Tray prior to Copper Tube
Installation of Stainless Tube
Cable Pulling of Power Cable & instrument cable
Leak Testing of Impulse Tubing, Small Bour tube & Copper Tube
Megger, Continuity, Wire Checking & Loop Checking
Installation of Conduits & Flexible Hose & etc.
POSITION : Instrument Fitter/Instrument Technician
PROJECT : Al Qurayyah Power Plant (Boiler 1&2 Modification Shutdown)
COMPANY : Al Rushaid Construction Co. Ltd. (ARCC - EEI)
Mitsubishi Heavy Industries (MHI)
Address : Al Qurayyah, Abqaiq Eastern Province (K.S.A)
Duration : September 4,2009 to March 20,2010
JOB DESCRIPTION :
Demolition of old copper tube & small bour tube, stainless tube prior to boiler
Installation of new Copper Tube from Transmitter to burner Gun as per Hook-Up Drawing
Installation of small bour tube From Main Header to Control Valve as per Hook-Up Drawing
Installation of Thermo Couple
Installation of Flame Detector
Installation of Perpurated Tray & Stainless Tray prior to Copper Tube.
Installation of Stainless Tube
Cable Pulling of Power Cable
Cable Pulling of Instrument Cable
Leak Testing of Impulse Tubing, Small Bour Tube & Copper Tube
Installation of Conduits & Flexible Hose & etc. as per Hook-Up Drawing.
POSITION : Instrument Fitter/Group Leader
PROJECT : Eastern Petrochemical Company, Sharq 3rd Expansion Project
COMPANY : Al Rushaid Construction Co. Ltd. (ARCC-EEI)
Shaw stone & Western Co. (Shaw)
Address : Al Jubail Industrial City Kingdom of Saudi Arabia
Duration : August 25, 2007 to September 1, 2009
JOB DESCRIPTION :
Fabrication of Instrument stanchion & Frame as Per Details Drawing
Installation of radiant Frame, TLE frame, Instrument Stanchion of Air Tubing from Main Header to Control Valve & Supports as per Hook-Up Drawing
Installation of Impulse Air Tubing From Transmitter to Tapping Point & Supports As Per Hook-Up Drawing
Oil Mist Tubing, Analyzer, Termination & Leak Testing
Installation of Level Gauge & Volume Tank
Installation of Cable Tray, Perpurated Tray & Ladder Type Tray
Cable Pulling of Instrument Cable, Primary & Secondary Cable From Junction Box to Cable Duct, from cable duct to Instrument
Conducting from Junction box to cable duct, from cable duct to instrument
Termination of Panel, Cable Dressing, Termination of Power & Signal Cable using Termination Schedule
Installation of Thermo Couple
Wire Checking from Terminal Block to Junction Box to Terminal Block of Panel
Megger & Loop Checking
Leak Testing of Impulse Tube, Air Tubing & Other Instrument.
POSITION : Instrument Fitter
PROJECT : Al Bayroni Refinery (Shutdown)
COMPANY : Al Rushaid Construction Co. Ltd (ARCC/EEI)
Technip Co. Ltd
Address : Al Jubail Industrial City K.S.A
Duration : November 28, 2007 to March 20, 2008
JOB DESCRIPTION :
Fabrication of Instrument Stanchion & Frames as Per Details Drawing
Installation of Impulse Tubing (Stainless) from Transmitter to tapping point
Installation of air tubing from Main Header to Control Valve & Supports as per Hook-Up Drawing
Installation and Fabrication of Cable tray, Perpurated Tray & Ladder Type Tray
Cable Pulling of Instrument Cable, Primary, Secondary. & Power Cable.
Conduiting of Flexible Hose, RSC, EMC type Conduit
Wire Checking & Continuity
Leak Testing of all Impulse Tubing & Air Tubing
PERSONAL INFORMATION:
Birthday : September 14, 1979
Civil Status : Married
Citizenship : Filipino
Gender : Male
Passport # : EC 7475966
I hereby Certify that their Entire above Mentioned name are true and correct through my ability and knowledge
KRIZTHIAN ABUAN QUILAY
APPLICANT
KRIZTHIAN ABUAN QUILAY
ELECTRICIAN
Mobile : 052*******
Email : *************@*****.***,
***************@*****.***