Post Job Free

Resume

Sign in

Power Plant Mechanical Engineer

Location:
Kolkata, West Bengal, India
Posted:
April 21, 2021

Contact this candidate

Resume:

Career Sketch

Core Competencies

Soft Skills

IT Skills

Bhabani Prasad Maity

Respected Hiring HR Manager

Your job posting for Resident Construction Manager (RCM) caught my attention because my experience and education so far have been in a similar field. I am familiar with the challenges and can help with better and new methods to solve the same. In addition to proactively leading the departments, I was a strategic employee in my last organization and serve in the department.

Your posting emphasizes an eagerness to learn and continuously improve. I am keen on joining an organization where I can continue to provide creative inputs to the strategic business issues while also implementing forward-thinking talent management strategies. Your advertised position appears to fit my experience, accomplishment, and health care. My knowledge & dedication have allowed me to grow and develop professionally and as an achiever, a leader.

I would be grateful for an opportunity to demonstrate my capabilities and your expectations further in an interview. Please feel free to contact me to arrange a meeting at your earliest convenience. In closing, I would like to thank you for taking the time to consider my application and I do look forward to hearing from you.

Sincerely

Bhabani Prasad Maity

Cover Letter

Dependable Resident Construction Manager (RCM) with extensive experience in the industry. Determined, organized. Resourceful and works well under pressure. Proven ability to motivate employees and improve morale. Excellent leader with a record of keeping employees on task and highly productive. Successful in meeting deadlines and business goals.

Scaling new heights of success with hard work & dedication and leaved a mark of excellence over 32+ years experience

Location Preferences: Pan India

Bhabani Prasad Maity

Professional Skills

Thirty-Two years of total experience in Manufacturing and Construction of Mechanical Equipment and erection of various storage Tank, Piping (CS, SS, Alloy, LTCs, Cross Country, Hot Tapping) & structural work,

Fabrication, erection, commissioning of process static equipments at Oil, Power, Coal & Nuclear Sector. Fabrication, Erection, Commissioning of rotary equipment for Coal Handling system, Power & Steel Sector. Erection, Commissioning of rotary equipment for Power, Oil & Nuclear Sector.

Inspect equipment on a regular basis.

Monitor operating conditions, meters, and gauges.

Record meter and gauge readings and operational data.

Ensure safety standards are met.

Monitor all operational issues and report any malfunctions

Lead and set-up water & wastewater treatment engineering team.

Prepare comparison table and evaluate equipment specification

Perform necessary mechanical design calculation in accordance with the required code standard.

Utilize internal piping design/drafting team and accomplish mechanical drawings.

Prepare and establish bill of materials and cost estimates for fabrication, piping and installation works including labour costs.

Conduct design evaluation and preparation of mechanical plans.

Prepare technical submittals and other requirement for approval. (Incl. Technical procedure, Method of statement, Drawings, O&M manual, etc.,)

Supervise technical submittals from venders and expedite delivery schedule as needed.

Supervise the selection and requisition of equipment, tools and materials to be used for site installation.

Conduct inspection of equipment and fabrication works prior to installation.

Attend meeting with client, venders and other engineers to provide update on project progress

Conduct pre-commissioning, commissioning and performance test

Perform other job related duties that may be assigned by superior from time to time.

Academic Details

Diploma (Mechnical) from State Council for Eng. And Tech. Education (W.B) with 1st class.

H.S.C from West Bengal Board of Secondary Education with 2nd class.

S.S.C from West Bengal Board of Secondary Education with 2nd class.

Ndt Qualification:-

Asnt Level - II on RT, UT, MPT Experience in VT, Hydro & Pneaumatic Testing, Wrapping & Coating.

Logo

Designation

Company name

Duration

Asst General Manager, Posted in Asansol

McNally Sayaji Engineering Limited

March 2010 to till 30 August 2020

QA & QC/ Manager

NICCO Corporation Limited

October 1995 to February 2010

Mechanical Engineer

ALFA BITA ENGG PVT LTD

June 1990 to May 1995

Senior Supervisor

Vijay Tanks & Vessels Limited

December 1989 to May 1990

Trainee Engineer (Maintenance)

Tata Steel, Bearing Division, Kharagpur

October1988 to November 1989

McNally Sayaji Engineering Limited

Responsibility/Activities: -

Project management of manufacturing of metallurgical machinery of crushing and screening plant (moveable crushing plant, crusher, hammer mill, vibrating screen, HP screen – project cost – 25 crores) material handling and conveyor plant( wagon tribble, sidearm charger, stacker reclaimer, conveyor roller, travelling tripper – project cost- 35 crores) SMS plant of steel plant (ladle transfer car, srab box transfer car, electrode arm charger etc. – project cost – 30 crores) coco oven by product plant ( PGC, scrubber, ammonia distillation column, catlike oven, clause reactor, Sulphur condenser, HP boiler, pre heater, LP boiler and press vessel etc. project cost – 98 crore) ash handling plant of thermal power plant( ash transporter, scrapper chain conveyor and accessories, air receiver, back filter, vent filter – project cost- 12 crores) daystar filter of aluminum refinery plant – project cost – 4.5 crores. evaporator of Kohinoor paper mill – project cost – 6.8 crores. TAF of Bhavani project cost – 1.23 crores and AAL & MAL of nuclear power corporation of India – project cost – 4.8 crores. Centrifuge project for savage water – project cost – 1.8 crores. Additional work - Preparation of tender drawing, tender specification, rising of idents, technical evaluation of vendor, vender development and import substitution, approval manufacturing drawings and testing actives, procedure, expediting manufacturing and testing activities at venders works, sorting out technical problems, analyzing and solving such problems during coarse of manufacturing and testing, giving guidance to venders for development of jigs, tools, tackles and fixture, sequence of welding for distortion and dimension control during welding and stress relieving operation, certain intricate machining operations using CNC machine, developing heat treatment facilities, hard crome plating, nitriding facilities, finishing facilities like grinding, honing, lapping to a very high degree of finish, ensuring proper packing, transportation and finally witnessing testing after election at site.

Quality Assurance was involved in

1.Vender /sub- vender evaluation and vender development. Periodic performance evaluation of venders/sub -vender by qualitative and quantity analysis of their product and meeting delivery target.

2.Preparation of inspection quality plan, sending intimation to supplier, review of document received from indenter, informing indenter for non-receipt of document if any.

3.Review /and approval of suppliers quality assurance plan, manufacturing procedures, heat procedures, inspection and testing procedure, inspection testing plan (ITP), testing arrangement and testing procedure including NDT (UT, RT, MP&PT) procedure and inspection formats as and when required.

4.Review and approval of welding procedure specification. Caring out procedure qualification test as per ASME Sec IX and approval base on test results.

5. Caring out test approval of consumables- welding electrode, MIG/TIG, FCW wires following ASME sec II-part C.

6. Approraval of: -

oCarrying out mock up test for approval of welding process like- insert welding and for selection of suitable welding method (combination of welding process) in case of inaccessible areas or areas having difficult welding approach.

oCoordinating with main customers on regular basis and resolving and non-conformities observe during various stage of manufacturing of the job with indenter. Actively participate in the progress review meeting with indenter.

oReview of test certificate of consumables and review of material received issue of Register at regular interval.

7.Carrying out stage inspections during fabrication as Estimation, costing and project management for rotary, static equipment of Thermal Power Plant, Oil Sector and Nuclear Power Plant: - like wagon tippler, stake reclaimer, hammer mill, ball mill, ruler grinding m/c, rotary screen, static screen, movable crushing coal plant, heat exchanger, pressure vessel and boiler.

oInspection of Fabrication, Assembly, Testing, Commissioning of static & rotary equipment for Steel Plant like ladder, ladder transfer car, Hood transverse carriage, scarab box transverse car, Production equipment for byproducts like primary gas cooler, naphtha scraper, naphthalene scraper, Sulphur scraper etc.

oEstimation, costing and project management for rotary, static equipment of Thermal Power Plant, Oil Sector and Nuclear Power Plant: - like wagon tippler, stake reclaimer, hammer mill, ball mill, ruler grinding m/c, rotary screen, static screen, movable crushing coal plant, heat exchanger, pressure vessel and boiler.

oInspection of Fabrication, Assembly, Testing, Commissioning of static & rotary equipment for Steel Plant like ladder, ladder transfer car, Hood transverse carriage, scarab box transverse car, Production equipment for byproducts like primary gas cooler, naphtha scraper, naphthalene scraper, Sulphur scraper etc.

oInspection of Fabrication, Assembly, Testing, Commissioning of Refinery equipment like heat exchanger, process column & pressure vessel.

oInspection of Fabrication, Assembly, Testing, Commissioning of static & rotatory equipment for Nuclear Power Plant like heat exchanger, pressure vessel, T.A. Flax & Main Air Lock, Auxiliary Air Lock.

oPreparation of various procedures, estimation equipment & scheduling.

oCRR making for the entire pipe line.

oCoordination with design office and client recommendation for suitable changes in drawings and taking approval from client as QA requirement.

oPreparation of QAP, WPS, PQR, Welder Qualification, keeping welder performance record and all other QA documents

oInterpretation of radiograph & UT scan.

oInspection of brought out material and preparation of inspection reports.

oErection Of FCC Unit at 2015

oAdditional claim

oFinal bill

oMaterial accountability

NICCO Corporation Limited as a Manager

Project Executed:-

NPCIL Kaiga – 3&4 and RAPP- 5&6 Atomic Power Project, GAIL VSPL LPG Pipe Line Project, NALCO, Damanjodi Expansion Project, ONGC Pakajan Gas Lifting Project, Madras Refinery Tankage Work, GAIL Pata Spent Caustic Plant and tankage project.

Responsibility/Activities:-

Involved in fabrication, erection and testing piping, pipe support, Storage tank, Equipment Erection job.

Preparation of various procedures.

CRR making for the entire pipe line.

Coordination with design office and client recommendation for suitable changes in drawings and taking approval from client as QA requirement.

Preparation of QAP, WPS, PQR, Welder Qualification, keeping welder performance record and all other QA documents.

Hindi /Bengali

English

Father’s Name : Late Rampati Maity

Nationality : Indian

Sex : Male

Marital Status : Married

Permanent Add : Vill. Amlat, PO+PS – Sutahata Haldia, Dist – East Midnapur, West Bengal - 721635

+91-896*******, 801-***-****

adluwg@r.postjobfree.com

10th Oct’ 1964

Vill. Amlat, PO+PS- Sutahata, Haldia, Dist.-East Midnapur, West Bengal -721635

Quality Assurance

Manufacturing department handle

Production Management

CRR make for entire pipe line

Equipment management

Vendor Management

Document management

Inspection material & make report

Project Management

Administration Management

Communicator

Analytical

Innovator

Soft Skills

Motivator

MS Office Suite – MS Word, MS PowerPoint, and MS Excel

Internet Applications

NPCIL, BHAVINI, NTPC, ONGC, IOCL, HPCL.

GAIL, NALCO, SAIL, Bhushan Steel & Power Limited, Jindal Steel

Client Highlights

Inspection of brought out material and preparation of inspection reports.

Interpretation of radiograph & UT scan.

Material accountability

Final bill

Additional claim

As bult drawing

Certification of bill of the vendor

Preparation of the QAP/ ITP

Preparation of the work procedure

Preparation of the NDT procedure

Vendor evolution

Alfa Bita Engg Pvt Ltd as a Mechanical Engineer

Project Executed:-

IOCL Haldia Tankage and LOBS Project, HPCL Vizag Tankage Project, ONGC, Ahmedabad Tankage Project,

Responsibility/Activities:-

Fabrication, erection, testing of storage tank, pipe line (CS, SS, LTCS, Alloy), Equipment & structural erection.

Maintenance (shutdown work) of heat exchanger and Process column (CDU, VDU)

Erection and commissioning of, statics equipment and rotatory equipment for FOB of oil refinery

Process column (CDU, VDU)

Fabrication, Erection and testing SRU (Sulfur Recovery Unit)

Vijay Tanks & Vessels Limited as a Senior Supervisor

Execution of the oil storage tank

Tata Steel, Bearing Division, Kharagpur as a Trainee Engineer (Maintenance)

Tata Steel, Bearing Division, Kharagpur as a Trainee Engineer (Maintenance)

Responsibility/Activities:-

Maintenance of CNC machines related procurement

Strengths

Self-motivated, confident and diligent

Perform miscellaneous job-related duties as assigned

Self-prioritizing and team player with excellent communication skills

Languages

Bhabani Prasad Maity



Contact this candidate