MEDEL DE CASTRO MAGBATOC
Email: adltok@r.postjobfree.com
Mobile:+639*********
POSITION DESIRED: PIPING SUPERVISOR
OBJECTIVES:
Seeking a position with an organization which my expertise and experienced could help.
To experience and learn more.
PERSONAL DETAILS:
Date of Birth: February 12, 1980
Place of Birth: San Antonio, Quezon, Philippines
Nationality: Filipino
Address: Maalbo Dela Paz, Batangas City, Batangas, Philippines
EDUCATION:
College : Batangas State University (former PBMIT)
June 07, 1997– September 16, 1997
Secondary: Batangas National High School
June 01, 1993 – April 02, 1997
GOVERNMENT ID:
PASSPORT: P4125664A
Validity: August 22, 2017 – August 22, 2022
NBI: M213MLL08-RA416395
Validity: October 04, 2020-October 04, 2021
SUMMARY:
Layout, fabricate, assemble install and maintain piping systems, pipe supports, fixtures, and related hydraulic and pneumatic equipment for steam, water, chemicals lubrication and production and processing systems, per scope identified by clients.
Plans, layout, install, test and repair piping systems in a variety of facilities.
Reading ISO’s; selecting materials, cutting and threading pipes.
Oversees a team of pipe fitting employees and all stages of the process of laying gas, oil or other pipe line.
Analyzing and planning of work.
Testing for leaks.
SKILLS:
Ability to respond promptly and professionally to requests and issues.
Good written and verbal communication skills.
Considerable experience of supervising construction staff to achieve effective construction execution.
Ability to make independent decisions in the planning, organizing and coordinating, to develop solutions to complex problems.
Good technical, teams and interpersonal skills.
Collaborative, problem-solving and analytical skills.
Ability to complete tasks in a timely manner.
Decision-making ability.
Good listening skills.
Strong verbal communication, stress and time-management skills.
Ability to lead people.
Excellent trouble-shooting ability.
EXPERIENCED :
April 12,2013-September 8,2019
PIPING SUPERVISOR
NASSER S. AL-HAJRI CORPORATION
(03)814 7779
SAUDI ARABIA
Projects:
JAZAN INTEGRATED GASSIFICATION COMBINED CYCLE PROJECT (JIGCC)
Jazan Saudi Arabia
July 14, 2018 – September 08, 2019
SAUDI ARAMCO SULFUR RECOVERY UNIT PROJECT (SASRU)
Fadili, Saudi Arabia
September 15, 2017 – July 12, 2018
SAUDI ARAMCO DOW AND AROMATIC FACILITIES RECOVERY PROJECT (SADARA)
Jubail, Saudi Arabia
September 15, 2016 – July 09, 2017
DAHRAN OIL AND GAS REFINERY SHUTDOWN AND MAINTENANCE PROJECT
Dahran, Saudi Arabia
July 07, 2015 – September 10, 2016
TURAIF OIL AND GAS REFINERY MAINTENANCE AND SHUTDOWN PROJECT
Turaif, Saudi Arabia
April 15, 2014 – May 02, 2015
AMMONIA 5, SULFUR AND AMMONIA RECOVERY UNIT PROJECT
Jubail, Saudi Arabia
April 13, 2013 – April 12, 2014
Job Descriptions :
Coordinate to all foreman in my team and motivate to enhance productivity.
Inspect work site to determine presence of obstruction.
Ensure that all materials and equipment required are available.
Plans sequence on installation to avoid obstructions and activities of other workers.
Performs work in conformation with plans, specifications and schedules.
High focus on ensuring that all aspects of the constructions work is performed safely.
Oversee the daily construction activities at work site, including scheduling of workers, delivery of equipment and materials, and progress of the project.
Play as leadership roles in the development of the safety culture on the project, making safety a natural part of all work performed.
Coordinates the work activities to all involved crafts with in a discipline during the entire construction efforts.
Maintain all quality of all piping work in the design documents.
Checking the piping field installation to ensure that quality of materials used and work manship are according to drawings and specifications.
Supervised in the deconstruction and removal of piping to include color coding and marking each individual spool and isometric drawings.
Reed and interpreted specifications, isometric drawings and all other discipline related projects and energizing documentation along with excellent record keeping.
Typically reports to a manager or head of a unit/department.
July 05,2001-November 15,2005
PIPING SUPERVISOR
SHILOH INTERNATIONAL CORPORATION
Ilijan, Batangas City Philippines
Project:
1200 MW COMBINED CYCLE POWER PLANT PROJECT
JOB DESCRIPTION:
Coordinate work teams directly in order to maintain high standards of performance, quality and safety.
Checking all isometric drawings or blueprints and piping field installation and established the necessary logistics.
Monitoring progress and distribution of daily tasks,necessary tools and materials needed with particular emphasis on compliance with specific safety rules and quality standards, ensuring the necessary logistics for each team work.
Motivate workers to attain production schedules.
Measuring and marking pipes for cutting or threading.
Securing pipes to walls and fixtures with brackets clamps or welding.
Fabricate, assemble, and install of various piping systems with pipe support according to the isometric drawings or blueprints.
Performs pipe test using hydro and pneumatic systems.
TRAININGS:
TRAINING FOR HYDRO TESTING
Nasser S. Al-Hajri Corporation
Saudi Arabia
May 20, 2018
SHUTDOWN AND MAINTENANCE TRAINING
Nasser S. Al-Hajri Corporation
Saudi Arabia
April 10, 2015
I hereby certify that the above information are true and correct to the best of my knowledge and belief.
MEDEL D. MAGBATOC